Logo
Boss Energy Ltd

We produce uranium in South Australia.Our new wellfield design cuts the cost.

Honeymoon, about 80km north-west of Broken Hill, is one of only two in-situ recovery uranium mines in Australia. Our New Feasibility Study rebuilt the mine plan around wider well spacing, which reaches more of the resource with about 1,340 wells instead of 2,480. We also hold 30% of the Alta Mesa ISR operation in Texas.

2.31Mlbs
U3O8 drummed at Honeymoon since we restarted production in April 2024
65.9Mlbs
U3O8 Mineral Resource across Honeymoon, Jason’s and Gould’s Dam, 73.3Mt at 410ppm
A$207M
Cash and liquid assets at book value at 30 June 2026, with no debt
1.25–1.30Mlbs
FY27 drummed production guidance at Honeymoon, while our first wide-spaced wellfield comes online

Our plan

Lower-cost pounds from Honeymoon first. Then the satellite deposits to feed the plant.

  1. 01

    Restart

    We restarted Honeymoon in April 2024 using the existing plant, trunklines and wellfield infrastructure, and lifted output 61% in FY26 to 1,407klbs drummed.

    2.31 MlbsU3O8 drummed since restart

  2. 02

    Redesign

    Our New Feasibility Study set the mine plan on a five-spot wellfield with 49m between injector and extractor, against about 35m historically, which brings lower grade sands into the plan.

    ~A$30/lbLower life-of-mine AISC than the old design

  3. 03

    Prove it

    EKT1 at East Kalkaroo is our first wide-spaced trial wellfield, with most patterns at 58m. It comes online in the December 2026 quarter, with EKT2 to follow by June 2027.

    2xPounds under leach versus the old design for the same ground

  4. 04

    Scale up

    The study production target lifts drummed output to 1.9Mlbs a year from FY30 to FY33, using the existing plant with a sixth NIMCIX column and a larger water treatment plant.

    13.8 MlbsDrummed over nine years, production target

  5. 05

    Add satellites

    Jason’s, 13km north, and Gould’s Dam, about 80km west, hold 45.1Mlbs of resource outside the study. Permitting has started, with Jason’s EPBC submission due in the December 2026 quarter.

    45.1 MlbsU3O8 at Jason’s and Gould’s Dam

The production target in our New Feasibility Study of 27 August 2026 is based on 65% Indicated and 35% Inferred Mineral Resources over the nine-year life of mine. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target will be realised. Brooks Dam North, about 15% of forecast production, needs the Honeymoon Mine Extension, with approvals targeted by 2030. Jason’s and Gould’s Dam are not in the study and remain subject to studies, tenure and approvals. EKT1 and EKT2 timing is from our FY27 guidance of 27 August 2026.

Honeymoon in three dimensions

The uranium sits 100m down in sand. Here is what we mine today, and what comes next.

What we have today

01The ground

Drag to turn · shift + drag to move · ctrl + scroll to zoom · hover or tap + for detailOne finger turns · two fingers move and zoom

    Show

    What we have today

    A producing mine, re-planned around how Honeymoon actually flows.

    • 2.31MlbsU₃O₈ drummed since we restarted Honeymoon in April 2024, including 1,407klbs in FY26.
    • 20.8MlbsHoneymoon Mineral Resource, 21.4Mt at 440ppm U₃O₈, 66% Indicated, effective 30 June 2026.
    • 80–120mDepth of the mineralised Eyre Formation sands, sealed above by the Namba Formation clay.
    • 6Wellfields online at 30 June 2026, feeding our existing plant.

    What comes next

    Wider spacing across the deposit, then the satellites.

    • 58mInjector to extractor in most of EKT1, our first wide-spaced wellfield, modelled at about 748lbs a day and due online in the December 2026 quarter.
    • 1,340Wells across 59 wellfields in our development plan, against about 2,480 under the old design.
    • 13.8MlbsDrummed over nine years in our production target, reaching 1.9Mlbs a year from FY30, inside a plant with up to 2.5Mlbs a year of capacity.
    • 12.0MlbsAt Jason’s Deposit, 13km north, with its EPBC submission due in the December 2026 quarter.
    1. Done · Apr 2024Production restartsHoneymoon restarted on the existing plant and trunklines.
    2. Done · Aug 2026New Feasibility StudyUpdated resource and a nine-year plan on wide-spaced wellfields.
    3. Now · Dec 2026 qtrEKT1 onlineFirst wide-spaced trial wellfield at East Kalkaroo.
    4. By Jun 2027EKT2 and water treatmentSecond trial wellfield and stage 1 of the water treatment upgrade.
    5. FY30Sixth NIMCIX columnLifts plant flow capacity by 20%, for 1.9Mlbs a year from FY30 to FY33.
    6. By 2030Mine Extension approvalsNeeded for Brooks Dam North, about 15% of forecast production.

    Legend

    • Grade-thickness, Boss’s scale (m.ppm U₃O₈), for the resource and for drill intercepts<5005001,0002,0004,0008,000+
    • Wellfields in production
    • Wide-spaced wellfields EKT1 to EKT3 and trial HMT1
    • Planned, on existing trunklines, FY27 on
    • Planned, Brooks Dam trunkline from Q1 FY28
    • Brooks Dam North, from 2030 with Mine Extension
    • Trunkline, solution to the plant
    • Uranium pods in the geology section
    • Mining Lease ML6109
    • Injector well (schematic)
    • Extractor well (schematic)
    • Quaternary cover
    • Namba Formation clay (seal)
    • Eyre Formation, upper sands
    • Eyre Formation, basal sands (host)
    • Weathered basement

    Schematic model. Two blocks drawn at true horizontal scale and position, Honeymoon and Jason’s Deposit 13km to its north, with depths exaggerated six times. The resource cells, wellfield outlines and planned wellfields are redrawn from Figures 2 and 6 of our New Feasibility Study announcement of 27 August 2026, coloured on its grade-thickness scale; the cells are 50m squares placed at the depth of the basal sands and are not the estimation model. Strata depths follow the study’s description of the deposit and are schematic away from the published sections. Resource blocks are drawn 50m square with heights scaled to their grade-thickness class, not to the estimation model. Well positions, trunkline routes and the plant layout are schematic, and the timing colours on the development plan are indicative groupings of the planned wellfields in Figure 6, not the company’s schedule. Plant capacity of up to 2.5Mlbs a year is from our 2026 Market Day presentation (15 September 2026); annual production figures are from Table 8 of the study.

    Drilling and resources. Jason’s holes are the 38 holes of our 2023 program and six historical holes, placed from the collar tables in our announcement of 23 January 2024 (MGA94 zone 54), drawn vertical from flat ground as reported, with every reported interval at its downhole depth. Grades are pU₃O₈ from prompt fission neutron logging, or eU₃O₈ from gamma logging where marked. Jason’s Mineral Resource of 13.3Mt at 410ppm for 12.0Mlbs (19 March 2026) has no published outline and is not drawn. Gould’s Dam, about 80km west, is not drawn. The production target is based on 65% Indicated and 35% Inferred Mineral Resources; there is a low level of geological confidence in Inferred Mineral Resources and no certainty the production target will be realised. There is no Ore Reserve.

    The investment case

    Three reasons to look closer at BOE.

    01

    A producing uranium mine

    1,407klbsDrummed in FY26, up 61%

    Honeymoon is one of only three producing uranium mines in Australia and one of two in-situ recovery mines. It has drummed 2.31Mlbs since we restarted it in April 2024, and FY27 guidance is 1.25 to 1.30Mlbs.

    02

    A lower cost way to mine it

    A$79/lbLife-of-mine AISC in our study, to 2034

    Wider-spaced wellfields reach more of the resource with about 1,340 wells instead of 2,480. Our study puts life-of-mine C1 cost at A$50/lb and AISC at A$79/lb, about A$30/lb below the old design applied to the same resource.

    03

    Growth, funded

    65.9 MlbsU3O8 resource across three deposits

    Jason’s and Gould’s Dam add 45.1Mlbs outside our study, near our plant. We hold A$207.3M in cash and liquid assets with no debt, 73% of inventory and planned production is uncontracted, and we own 30% of Alta Mesa in Texas.

    FY26 production and FY27 guidance are from our announcements of 30 July and 27 August 2026. Study figures are from our New Feasibility Study of 27 August 2026, whose production target is based on 65% Indicated and 35% Inferred Mineral Resources; there is a low level of geological confidence in Inferred Mineral Resources and no certainty the production target will be realised. Jason’s and Gould’s Dam are not in the study and remain subject to studies, tenure and approvals.

    Most of Honeymoon is lower grade sand. Wider spacing turns it into production.

    Higher grade uranium at Honeymoon sits in pods inside a broad, continuous envelope of lower grade mineralisation. Wider-spaced wellfields keep lixiviant in the sand for longer, which let us drop the cut-off from 250ppm to 100ppm and bring that envelope into the plan. Our study forecasts production 26% below the 2021 plan, even though the resource at the old cut-off fell 63%.

    Mining Lease ML6109 ~80km NW of Broken Hill One of two ISR mines in Australia

    How we got here, and what is next

    Restarted in 2024. Re-planned in 2026. Wide spacing goes in the ground now.

    1. Apr 2024Honeymoon restartsProduction restarts at Honeymoon, and Alta Mesa in Texas, where we hold 30%, starts production in June.
    2. Dec 2025Honeymoon ReviewDelineation drilling and operating data showed the EFS assumptions no longer fit the orebody. We withdrew it and started a new study.
    3. Jun 2026Output up 61%1,407klbs drummed, sales revenue doubled to A$151.1M and a net profit after tax of A$2.5M.
    4. Aug 2026New Feasibility StudyAn updated resource and a nine-year plan on wide-spaced wellfields, with life-of-mine AISC of A$79/lb.
    5. Oct to Dec 2026EKT1 and quarterly resultsSeptember quarter results on 28 October, our first wide-spaced wellfield online, and Jason’s EPBC submission ready.
    6. By Jun 2027EKT2 and water treatmentEKT2 online, stage 1 of the water treatment plant upgrade, and Gould’s Dam EPBC submission ready.

    Our share price, live

    Current price

    Volume

    Market Cap.

    Year low - high

    Market data chart (ASX:BOE)

    Volume traded

    Share price ()

    Share price
    Volume
    Announcements

    Last price

    Open price

    Day low - high

    Price change

    Percentage change

    Previous close

    Volume (no. of shares)

    Turnover

    Market cap

    Shares outstanding

    VWAP

    Bid / Ask

    52 week high

    52 week low

    Price/earnings ratio

    Earnings per share

    Our September quarter results land on 28 October.

    Then EKT1 comes online, our AGM follows in late November and Jason’s permitting moves forward. Join the investors we keep updated and you will hear it from us first.