Boss Energy Ltd

One producing uranium mine in South Australia.Two satellites to feed it, and a stake in Texas.

Our flagship is Honeymoon, 100% ours on Mining Lease ML6109 about 80km north-west of Broken Hill and producing since April 2024. Within reach of its plant sit Jason’s Deposit, 13km north, and Gould’s Dam, about 80km west. In South Texas we hold 30% of the Alta Mesa ISR operation.

Where we are

One uranium district in South Australia. One stake in Texas.

Honeymoon, its plant and both satellite deposits sit within about 80km of each other in the Lake Eyre Basin, north-west of Broken Hill. Hover or tap a marker to explore each site.

AUSTRALIA SA HONEYMOON DISTRICT, SA SA NSW Broken Hill 50km N TEXAS, USA

Locations are approximate and redrawn from our tenure and location maps. The plant and the Honeymoon wellfields sit within a few kilometres of each other, so their markers are pulled apart with leader lines. Resources are as reported on 19 March 2026 and 27 August 2026; Alta Mesa figures are from our 2026 Market Day presentation and enCore’s results we reported on 2 June 2026. The Texas photo is illustrative.

The portfolio at a glance

Three uranium deposits in one South Australian catchment, and a share of a Texas producer.

HoneymoonSouth Australia, ~80km NW of Broken Hill
100%, Mining Lease ML6109 and EL6081
21.4Mt @ 440ppm U₃O₈ for 20.8Mlbs, 66% Indicated (Jun 2026)
Producing. 1,407klbs drummed in FY26, 2.31Mlbs since April 2024
EKT1 online in the December 2026 quarter, EKT2 by June 2027; FY27 guidance 1.25 to 1.30Mlbs
Jason’s DepositSouth Australia, 13km north of Honeymoon
100%, EL6510
13.3Mt @ 410ppm U₃O₈ for 12.0Mlbs, 41% Indicated (Dec 2025)
Permitting. Best 2023 result 3.00m @ 3,221ppm pU₃O₈ from 105.5m in BMR183
EPBC submission ready in the December 2026 quarter; up to 115 holes in FY27
Gould’s DamSouth Australia, ~80km west of Honeymoon
100%, EL6512 and retention licences 83 to 85
38.7Mt @ 388ppm U₃O₈ for 33.1Mlbs, 23% Indicated (Dec 2025)
Options study under way, advancing to a Pre-Feasibility Study
EPBC submission ready by June 2027; up to 537 holes in FY27
Alta MesaSouth Texas, USA
30%, enCore Energy 70% and manager
Not reported by us
Producing ISR operation. We received 162klbs in FY26
enCore drilling at Alta Mesa East; state permitting for wellfields

Mineral Resources as reported in our announcements of 19 March 2026 (Jason’s and Gould’s Dam, effective 31 December 2025, 250ppm cut-off) and 27 August 2026 (Honeymoon, effective 30 June 2026, 100ppm cut-off); Indicated shares are by contained metal. Drilling results are from our announcement of 23 January 2024; pU₃O₈ is derived from prompt fission neutron logging and widths are downhole. There is no Ore Reserve on any of our projects. Plans and timing are from our 2026 Market Day presentation and are forward looking.

Alta Mesa, South Texas, USA

A second ISR operation, in Texas.Run by enCore, 30% ours.

We own 30% of the Alta Mesa Joint Venture in South Texas, managed by enCore Energy, which owns 70%. It is an in-situ recovery operation with a fully licensed and constructed Central Processing Plant, and we received 162klbs from it in FY26. Output fell to 45klbs on a 100% basis in the June 2026 quarter because of permitting delays at state level, and performance has not met initial expectations. enCore’s drilling in June 2026 extended uranium mineralisation more than 3,700 feet east of the nearest wellfield.

enCore Energy, manager ISR, licensed plant Image illustrative

Follow the ramp-up

EKT1 comes online at East Kalkaroo this quarter. Hear how it performs first.

Sign up and we will send you every ASX release the moment we lodge it, along with the context behind it.