Logo
Boss Energy Ltd

Why invest in BOE

Uranium in the drum, and a cheaper plan to make more.

We give investors exposure to a producing Australian uranium mine with a new, lower cost mine plan, 65.9Mlbs of resource within reach of our plant, no debt, and most of our future pounds still open to the market price.

2.31Mlbs U₃O₈ drummed since April 2024

Already in production

Most uranium companies are still working out how to build a mine. Ours is running.

Honeymoon has been producing since April 2024. That changes which questions are left to answer. Here is how the three places a uranium company can start compare.

Starting point 1

Explorer

What is known

Radiometric anomalies and drill holes, perhaps a first resource.

The main question

Is there an economic deposit here at all?

Processing

No plant, and recovery untested beyond the laboratory.

Approvals

Exploration licences, many years from a mining lease and a licence to export.

Starting point 2

Developer

What is known

A resource and a study that says a mine could work.

The main question

Can it be funded, built and ramped up on budget?

Processing

A plant on paper, with construction and commissioning still ahead.

Approvals

Often still working through State and Commonwealth approvals.

Starting point 3 · Ours

Producer

What is known

2.31Mlbs drummed since April 2024, two years of operating data, and a resource rebuilt on that data.

The main question

How far can wider spacing cut our cost, and how much can the satellites add?

Processing

An operating ISR plant with five NIMCIX columns and up to 2.5Mlbs a year of processing capacity.

Approvals

Producing on Mining Lease ML6109, with permitting started for Jason’s and Gould’s Dam.

A general comparison of starting points, not of individual companies or their economics. Honeymoon figures are from our 2026 Market Day presentation of 15 September 2026.

Five reasons, one uranium district

We already make uranium. Now we are making it cheaper.

Everything that makes Boss worth owning starts at Honeymoon, our 100% owned operation in South Australia. Hover or tap a panel to see what each one means for us.

01

A producing mine

2.31 MlbsU3O8 drummed since April 2024

Honeymoon is one of only three producing uranium mines in Australia. We drummed 1,407klbs in FY26, up 61%, through an existing plant with up to 2.5Mlbs a year of processing capacity, and FY27 guidance is 1.25 to 1.30Mlbs.

02

A cheaper way to mine it

A$79/lbLife-of-mine AISC in our study, to 2034

Spacing wells 49m apart instead of about 35m means about 1,340 wells instead of 2,480, longer contact time in the sand and a richer solution to the plant. Our study puts life-of-mine C1 cost at A$50/lb and AISC A$30/lb lower than the old design.

03

Resources close to our plant

65.9 MlbsU3O8 at Honeymoon, Jason’s and Gould’s Dam

Honeymoon holds 20.8Mlbs. Jason’s, 13km north, and Gould’s Dam, about 80km west, add 45.1Mlbs that sit outside our study, with deposit characteristics similar to Honeymoon and permitting under way to bring them to our plant.

04

Balance sheet

A$207.3MCash and liquid assets at book value, 30 June 2026

We carry no debt. That figure includes uranium inventory of 1.581Mlbs at book value, worth about A$195M at the spot price on that date, and it funds the A$58M of additional enabling capital our study sets out.

05

Uranium exposure

73%Of inventory and planned production uncontracted

We are deliberately under-contracted and sell forward on a rolling basis, so more of our pounds meet the market price. We also hold 30% of the Alta Mesa ISR operation in Texas, run by enCore Energy, with a licensed central processing plant.

Figures are from our FY2026 results, New Feasibility Study and Mineral Resource update of 27 August 2026, our June 2026 quarterly report and our 2026 Market Day presentation of 15 September 2026. Study cost figures are life-of-mine averages to 2034 and rest on a production target based on 65% Indicated and 35% Inferred Mineral Resources; refer to the cautionary statement in our 27 August 2026 announcement. Jason’s and Gould’s Dam are not in the study and remain subject to studies, tenure and approvals. Uncontracted share is as stated in our Market Day presentation.

The margin in our plan

Our study costs US$55 a pound all in. It is priced at US$90.

  • US$55Life-of-mine all-in sustaining cost per pound in our New Feasibility Study, A$79/lb, averaged to 2034
  • US$74.4Our average realised price across the 1,400klbs we sold in FY26, which doubled sales revenue to A$151.1M
  • US$90The long-term uranium price our study assumes, at an AUD/USD rate of 0.70, for a margin over AISC of US$35 a pound
Bubble area is proportional to US dollars per pound of U₃O₈. The study price and AISC are assumptions and forecasts, not guarantees; the uranium price changes daily and our FY27 cost guidance is AISC of A$83 to 92/lb while the new wellfield design ramps up.

Sources: BOE ASX announcements of 27 August 2026 (Honeymoon New Feasibility Study and MRE Update; FY2026 Financial Results and FY2027 Guidance). The production target behind the study cost figures is based on 65% Indicated and 35% Inferred Mineral Resources; refer to the cautionary statement in that announcement.

Why invest now

The new design goes into the ground. Four catalysts land in the next three quarters.

Our New Feasibility Study is done and our first wide-spaced wellfield at East Kalkaroo is due online this quarter, while permitting starts for our satellite deposits. These are the catalysts we are working towards.

Latest price sensitive announcement · 27 August 2026 Honeymoon New Feasibility Study and MRE Update 13.8MlbsDrummed over nine years, production target A$79/lbLife-of-mine AISC to 2034, US$55/lb 20.8MlbsHoneymoon Mineral Resource, 66% Indicated Go to our announcements
  1. 01Under way

    Bring EKT1 online

    Our first wide-spaced trial wellfield at East Kalkaroo, with most patterns 58m apart, is due online in the December 2026 quarter. Against the old design for the same ground it uses 44 wells instead of 66.

    Could unlockProof of the lower cost design at commercial scale

  2. 02Under way

    Start permitting Jason’s

    Jason’s, 13km north of our plant, holds 12.0Mlbs. Its EPBC submission is due to be ready in the December 2026 quarter, with Gould’s Dam following by June 2027.

    Could unlockA second source of feed for the Honeymoon plant

  3. 03Next

    Update the Honeymoon resource

    A further 262 holes for 31,411m were drilled after the data cut-off for our new resource. They will go into the next Mineral Resource update.

    Could unlockGreater confidence across more of the deposit

  4. 04Next

    EKT2 and more water treatment

    EKT2 comes online and stage 1 of the water treatment plant upgrade completes by June 2027. Modelling indicates spacing of up to 70m may add further value, and field trials are planned.

    Could unlockFewer wells again, and a faster ramp-up

Catalysts reflect our current plans as set out in our ASX announcements of 19 March, 27 August and 15 September 2026 and are forward looking. Timing and outcomes may differ. The production target is based on 65% Indicated and 35% Inferred Mineral Resources; refer to the cautionary statement in our announcement of 27 August 2026. Jason’s and Gould’s Dam are subject to studies, tenure and approvals.

Sign up

The short version

A producing uranium mine, a lower cost plan to run it, and 45.1Mlbs more within reach of our plant.

Every production result and study update is announced to the ASX first. Follow it through our announcements, and see the ground it comes from on our projects page.