Boss Energy Honeymoon Analyst Site Visit Presentation
Released
Released
Announcement PDF
ASX Release 26 March 2025
Boss Energy Honeymoon Analyst Site Visit Presentation
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) advises that today, on 26 March 2025, it is hosting a site
visit for 14 equity research analysts at the Honeymoon Uranium mine, South Australia. The following
presentation will be delivered at Honeymoon by site management.
This presentation includes an update on Honeymoon's quarterly production to date.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy.
For further information, contact:
Duncan Craib
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Duncan Craib - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Paul Armstrong – Public Relations
+61 (08) 9388 1474
www.bossenergy.com
@Boss_Energy
A global multi-mine Uranium producer
First mover advantage in a rising Uranium market
Honeymoon Analyst Site Visit
26 March 2025
ASX: BOE | OTCQX: BQSSF
bossenergy.com
Honeymoon Site Visit
1
Boss Energy | Honeymoon Analyst Site Visit
Production Results (3Q25)
2
Production Results
Honeymoon March Quarterly Production1
lbs
350,000
• Strong expected quarter on quarter growth in IX production and U3O8
drummed
300,000
Forecast production
250,000
• Remain on track to deliver 850k lbs U3O8 drummed for FY25
Forecast production
• U3O8 drummed exceeded IX production as a portion of the inventory
accumulated in previous quarters was processed through the drying and
packing stage.
200,000
150,000
• Challenges with the kiln and baghouse (which form a part of the drying and
packing stage) have resulted in some unplanned downtime during the
quarter. These issues continue to be resolved but are not expected to
impact ramp up targets.
100,000
50,000
0
4Q24
1Q25
IX Production
2Q25
3Q25
• Despite challenges noted above, annualised run rate of 3Q25 is forecast to
be ~1.18m lbs U3O8 drummed per annum, which positions Boss to continue
to ramp up beyond FY25.
U3O8 Drummed
Notes:
1. Actual production to 23 March 2025. Forecast production from 24 March 2025 to 31 March 2025
Boss Energy | Honeymoon Analyst Site Visit
3
Honeymoon Site Visit
2
Boss Energy | Honeymoon Analyst Site Visit
Wellfields
4
Honeymoon Wellfields
Gould’s Dam
25 Mlbs
510ppm
Goulds
Dam
~13km
Jason’s
11 Mlbs
790 ppm
Jasons
Honeymoon
36 Mlbs
660 ppm
Boss Energy | Honeymoon Analyst Site Visit
5
Honeymoon Current Wellfield Configuration
Brooks Dam
Honeymoon
East Kalkaroo
Boss Energy | Honeymoon Analyst Site Visit
6
Honeymoon Wellfield Development
Steps
Key Activity
Description
Indicative Timeframe
1
Resource
Delineation
Resource delineation drilling is completed on typical spacing of 40m x 40m. Key for
resource delineation drilling is the use of the BMR and PFN probe
Typical drilling rates are
~300m/day
Wellfield Design
Wellfield design is based on 5 –spot patterns with 30-40 m between extraction and
injection wells. Each wellfield is comprised of 16 extraction wells and ~20-30 injection
wells. Methodology is to put as much resource under leach as possible whilst remaining
above cut-off grades.
1 month
2
3
Wellfield Drilling
and installation
Well drilling comprised of: a) 1st stage drilling, b) geophysical logging, c) casing, d) 2nd
stage drilling, e) 2nd stage logging, f) airlifting, g) QAQC logging, h) integrity testing
2 days
(1st and 2nd stages not
completed straight after oneanother)
4
Wellfield
construction and
commissioning
Installation: a) Installation of submersible pumps (12 week lead time) b) trunk lines and
spider lines c) wellhouses d) filter skid e) connection f) electrical and instrumentation
g) commissioning
3 months
5
Flushing /
Conditioning
Acidified water injected into new wellfield and extracted groundwater sent to water
treatment plant. Wellfield is flushed with clean acidified to remove Ca and Cl prior to
brining on to production whilst also preparing ore for leaching
1-2 months
Wellfield available for production
Boss Energy | Honeymoon Analyst Site Visit
7
Honeymoon Wellfield Resource Delineation
Down Hole Probes
Prompt Fission Neutron (PFN)
Direct measurement of Uranium (235U)
Borehole Magnetic Resonance (BMR)
Total Porosity (mobile and bound fluid)
Primary lithological tool
Induction
Useful at picking lithological boundaries
Identifies sulphides
Resistivity
Useful at picking lithological boundaries
Gamma
Caliper
Deviation
Boss Energy | Honeymoon Analyst Site Visit
Indirect measurement of Uranium –
measures all radio nucleotides (K, Th, U,
214Bi, 214Pb)
Borehole size and QAQC
Borehole orientation
8
Honeymoon Wellfield Development
Honeymoon Lower Domain – Wellfields Design
Boss Energy | Honeymoon Analyst Site Visit
9
Honeymoon Wellfield Key Assumptions
1
2
3
Key Consideration
Description
Overall Recovery
Assumed from EFS of 70% overall
recovery of U3O8 equivalent from
all wellfields - B1 and B2
performing as expected
% Recovery per Pore
Volume Exchange
(PVE)
Forecast production rate is based
on the % recovery per PVE from a
wellfield. The EFS assumes a 70%
resource recovery over 70 PVE.
B1 – Tracking close to projected
recovery (B1 was partially leached
by Uranium One and why recovery
profile different to that of B2)
B2 – Recovery per PVE much
higher than forecasted leading to
quicker overall recovery
Flow Rates
Flow rates through wellfields also
drive how quickly the resource
can be recovered. Flow rates
through wellfields are in-line with
forecasted rates
Boss Energy | Honeymoon Analyst Site Visit
10
Honeymoon Wellfield Opportunities
Opportunity
1
Modular Wellhouse
2
Ferric Sulphate
3
First Fill Recovery/ Reuse
4
Centralise Filtration Plant
Boss Energy | Honeymoon Analyst Site Visit
Description
Currently in construction of V2.0 wellhouse
design (incl. VSDs) as a modular
unit fabricated offsite. Potential to adopt
‘modular construction model’
Use of ferric sulphate above planned dosing
concentrations increased uranium wellhouse
head-grade. There is an opportunity to use
ferric to increase grade as an option to extend
wellfield life (and total recovery)
First fill for the wellfields consists of ferric
sulphate and sulphuric acid. Work is in
progress on determining the optimal path in
regards to recovery of the first fill lixiviants
Commenced costing and studies on a
centralised filtration plant for B6 – B9 versus
individual filter skids at each wellhouse with
the aim of reducing cost and improved
productivity/operational efficiency
Outcome
Capital and operational cost
improvements
Quicker recovery and improved
cost per lb U3O8
Cost savings
Productivity and cost
improvements
11
Honeymoon Wellfield Resource Delineation
Wellfields
B1 & B2
Current Status
Currently in production
Scheduled Date for
Production
In production
B3
Available for production (flushing
completed)
4QFY25
B4
Currently refurbishing wellhouse with
poly and trunk line installation
scheduled to commence shortly.
Scheduled for commissioning
1QFY26
1QFY26
B5
Wellhouse in construction (offsite)
with poly and trunk line installation
scheduled to commence shortly.
Scheduled for commissioning
1QFY26
2QFY26
Well installation with purchasing of
long lead items. Trunk line installation
scheduled for commencement
4QFY25. Scheduled for
commissioning 2QFY26
3QFY26
B6 (Far East
Kallaroo)
Boss Energy | Honeymoon Analyst Site Visit
12
Honeymoon Site Visit
3
Boss Energy | Honeymoon Analyst Site Visit
Process Plant
13
Honeymoon Key Stages of Processing
Wellfield Insitu Leach
Filtered groundwater
with acid (sulphuric
acid), oxidant
(hydrogen peroxide)
and iron (ferric
sulphate) called the
Leaching Lixiviant is
injected into the
uranium hosted sand
orebody through a
series of injector wells.
The uranium is
dissolved and uranium
rich groundwater
(pregnant solution) is
pumped to surface
through a series of
extractor wells.
Boss Energy | Honeymoon Analyst Site Visit
Ion Exchange &
Stripping
NIMCIX continuous ion
exchange technology
uses synthetic resin
beads to purify and
concentrate the
uranium solution. In the
first stage, the uranium
from the pregnant
solution is absorbed on
the resin beads. In the
second stage, the
loaded resin is then
stripped of uranium as
part of the elution
process with saline
water.
Precipitation
Precipitation
Drying
Drying&&Calcination
Calcination
Packing
Drumming
& Packing
Logistics
Logistics
Precipitation of
uranium from solution
to convert back into
solid form.
Honeymoon uses
hydrogen peroxide
precipitation method
which produces a very
pure product Uranyl
Peroxide (Yellowcake)
in slurry form.
The Yellowcake is
washed and dewatered
through centrifuge
before calcination via
electric kilns to U3O8
(Blackcake).
U3O8 is placed
into steel drums before
being packed shipping
containers.
The containers are
road freighted from
Honeymoon for
shipping to conversion
facilities.
14
Technical Improvements since Uranium One
Key Area
Lixiviant
Stability
Seeing the
benefits from
the Technical
Improvements
since Uranium
One
Boss Energy
Improvements
Environmental
Proven Outcomes
Low Fe
High Fe (2g/l)
pH - 2
pH – 1.4
Large Bleed Treatment
Groundwater pre-treatment
Solvent Extraction
NIMCIX
Organic SX contamination
Eliminated via NIMCIX
Improved product safety
Iron contamination
Iron does not load on IX
Lower probability of product rejection
2 stage product re-pulp
Improved product wash efficiency
Operating Cost
Product Quality
Boss Energy | Honeymoon Analyst Site Visit
Uranium One
Low product washing
capability
Vacuum Dryer (UO4)
Calciner (U3O8)
Potential for solvent loss to
wellfield
Eliminated through IX
Improved leaching efficiency
Cost effective Ca/Cl removal
Enables higher throughput at lower unit
costs
Higher packing density
Improved customer acceptance
Lower environmental impact
15
Honeymoon Processing - Recovery
Process Area
EFS
(assumed)
Actual
(average)
Commentary
•
IX Recovery
98%
98%
•
•
•
Precipitation
Recovery
98%
99%
•
IX Adsorption and Elution Columns – A Train
Resin loading higher than EFS life-of-mine
assumption at an average of 35g/l
compared to 26.7-27.3g/l – resin
performing at higher head grades
Recovery achieved as per EFS
parameters, attributed to the optimisation
of the resin loading cycle times and resin
transfer rates
Important to note that IX Recovery loss is
reprocessed back through wellfields and
hence is not lost from total circuit
In the event of reduced recovery events in
the circuit, losses are mitigated by
redirecting thickener overflow to PLS pond
for recovery
Optimisation of reagent usage versus
recovery has not yet been completed
Top of IX Adsorption Column C
Achieving strong recovery performance to date even during ramp-up
and commissioning phases
Boss Energy | Honeymoon Analyst Site Visit
16
Honeymoon Key Milestones
Column 2 (Sep 25)
PLS feed to IX Column 2
Column 1 & Kiln 1
(Apr 24)
Wellfield B3
(Mar 25*)
Commenced
production from
Wellfield B3
Column 3 (Jan 25)
Installation of
Columns 4 to 6
(Jul 25)
PLS feed to IX Column 3
PLS feed to IX Column 1
and Kiln 1 with first drum
produced 21/04/2025
Column 5 & 6
(2QFY26*)
Commissioned and
first PLS feed to IX
Columns 5 & 6
Construction
FY24
FY25 (850klbs)
FY26 (1.6Mlbs)
Commissioning / Ramp-up / Operations
Kiln 1 (Jun 24)
Kiln 2 (Jan 25)
Final commissioning of
centrifuge and kiln 1
Kiln 2
commissioned
Commercial
Production (Jan 25)
* Forecast date
Boss Energy | Honeymoon Analyst Site Visit
Column 4
(1QFY26*)
Commissioned
and first PLS feed
to IX Column 4
Declaration of
Commercial Production
17
Honeymoon Site Visit
4
Boss Energy | Honeymoon Analyst Site Visit
Operating Costs
18
C1 Costs
Honeymoon C1 Cost Breakdown (2H25)1
5% 3%
17%
27%
1%
9%
7%
30%
Wellfield Costs
Labour
Maintenance
Site general and admin
Reagent
Proportion
Sourced
Use
Sodium Carbonate
31%
Adelaide
Water Treatment, Ion Exchange
Hydrogen Peroxide
16%
Sydney
Wellfield Lixiviant, Precipitation
Sodium Hydroxide
16%
Adelaide
Water Treatment, Precipitation
Ferric Sulphate
13%
Adelaide
Wellfield Lixiviant
Sulphuric Acid
10%
Port Pirie
Water Treatment, Wellfield
Lixiviant, Precipitation
Sodium Chloride
8%
Melbourne
Ion Exchange
Synthetic Resin
5%
International
Ion Exchange
Reagents and consumables
Power
Laboratory
Transportation
• C1 Costs continue to track in line with guidance of AU$37/lb – A$41 per pound for 2H25, based on 2H25 half to February 2025 results.
• Most cost types are materially in line with expectations with some small one-off (mainly site general and admin) savings being offset by some small one-off unexpected
additional commissioning costs (mainly labour).
• Further detail on financial performance will be provided as a part of the March quarterly report.
Boss Energy | Honeymoon Analyst Site Visit
19
Honeymoon Resource Tables
HONEYMOON JORC EXPLORATION TARGETS AND MINERAL RESOURCE
The information in this Presentation relating to the Enhanced Feasibility Study (EFS) is extracted from the announcement
entitled ‘Updated Feasibility Study identifies lower costs and increased financial returns’ dated 21st June 2021. Boss Energy
confirms that all the material assumptions underpinning the production targets, and forecast financial information derived
from the production targets, continue to apply and have not materially changed. As the EFS utilises a portion of Inferred
Mineral Resources, the ASX Listing Rules (Listing Rules) require a cautionary statement to be included in this Presentation. The
EFS is based on a Mineral Resources Estimate in accordance with the JORC 2012 guidelines (ASX: 149% Increase in Measured and
Indicated Resources at Honeymoon date 25 February 2019). The Company advises that the EFS uses a portion of Inferred
Resources; in the first 3 years (less than 1%), in the first 5 years (5%) and over the 11-year life of mine (19%). The Company
confirms that the use of Inferred Resources is not a determining factor to the Honeymoon Project’s economic viability. There
is a low level of geological confidence associated with Inferred Resources and there is no certainty that further exploration or
evaluation work will result in the determination of Indicated Resources or that the production targets reported in this
announcement will be realised.
The mineral resource estimate and exploration target in this Presentation were reported by the Company in accordance with
Listing Rules 5.8 and 5.7 (respectively) on 25 February 2019 and 25 March 2019, respectively. The Company confirms it is not
aware of any new information or data that materially affects the information included in the previous announcement and
that all material assumptions and technical parameters underpinning the estimates in the previous announcement continue
to apply and have not materially changed. In relation to the exploration target, this does not include areas of the existing
mineral resource and the potential quantity and grade reported are conceptual only in nature. Insufficient exploration has
been conducted to estimate a mineral resource and it is uncertain whether future exploration will lead to the estimation of
a mineral resource in the defined areas.
Tonnes (Mt)
Grade (%U3O8)
Contained U3O8
(Mlbs)
Measured
3.1
0.110
7.6
Indicated
18.4
0.063
25.5
Inferred
30.9
0.057
38.5
Total
52.4
0.062
71.6
Boss Energy | Honeymoon Analyst Site Visit
20
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (Boss Energy or
Company). NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the
recipient’s investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent
assessment and investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should
not rely on any statement or the adequacy and accuracy of any information. This Presentation is in summary form and does not
purpose to be exhaustive. This Presentation should be read in conjunction with Boss Energy’s periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of
the Information. Boss Energy and its directors, employees, agents and consultants shall have no liability (including liability to any
person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or
implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute that
can not be excluded.
FORWARD LOOKING STATEMENTS
All dollar amounts are in Australian dollars unless otherwise indicated. This announcement may contain certain statements and
projections provided by or on behalf of Boss Energy Limited with respect to the anticipated future undertakings. These forwardlooking statements reflect various assumptions by or on behalf of Boss Energy. Accordingly, these statements are subject to
significant business, economic and competitive uncertainties and contingencies associated with the mining industry which may be
beyond the control of Boss Energy which could cause actual results or trends to differ materially, including but not limited to price
and currency fluctuations, geotechnical factors, drilling and production results, development progress, operating results, reserve
estimates, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries, approvals
and cost estimates, environmental risks, ability to meet funding requirements, share price volatility. Accordingly, there can be no
assurance that such statements and projections will be realised. Boss Energy makes no representations as to the accuracy or
completeness of any such statement of projections or that any forecasts will be achieved. Additionally, Boss Energy makes no
representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under
statute or otherwise) is or will be accepted by Boss Energy or by any of their respective officers, directors, shareholders, partners,
employees, or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions or matters
(express or implied) arising out of, contained in or derived from this announcement or any omission from this announcement or of
any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In furnishing
this announcement, Boss Energy undertakes no obligation to provide any additional or updated information whether as a result of
new information, future events or results or otherwise. Nothing in this material should be construed as either an offer to sell or a
solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in isolation as a
basis to invest in Boss Energy.
The information in this document relating to the Enhanced Feasibility Study(“EFS”) is extracted from the announcement entitled
‘Updated Feasibility Study identifies lower costs and increased financial returns’ dated 21 June 2021. Boss Energy confirms that
all the material assumptions underpinning the production targets, and forecast financial information derived from the production
targets, continue to apply and have not materially changed.
The Company advises that the EFS uses a portion of Inferred Resources in the first 3 years (less than 1%), in the first 5 years(5%)
and over the 11-year life of mine(19%). The Company confirms that the use of Inferred Resources is not a determining factor to the
Honeymoon Project’s economic viability. There is a low level of geological confidence associated with Inferred Resources and there
is no certainty that further exploration or evaluation work will result in the determination of Indicated Resources or that the
production targets reported in this announcement will be realised.
REFERENCE TO PREVIOUS ASX ANNOUNCEMENTS
The mineral resource estimate and exploration target in this announcement were reported by the Company in accordance with
listing rules 5.8 and 5.7(respectively)on 25 February 2019 and 25 March 2019, respectively. The Company confirms it is not aware
of any new information or data that materially affects the information included in the previous announcement and that all material
assumptions and technical parameters underpinning the estimates in the previous announcement continue to apply and have not
materially changed.
In relation to the exploration target, this does not include areas of the existing mineral resource and the potential quantity and
grade reported are conceptual only in nature. Insufficient exploration has been conducted to estimate a mineral resource and it is
uncertain whether future exploration will lead to the estimation of a mineral resource in the defined areas.
EFFECT OF ROUNDING
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
PAST PERFORMANCE
Past performance information, including past share price performance of Boss Energy and pro forma financial information, given in
this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss Energy’s
(or anyone else’s) views on Boss Energy’s future financial performance or condition. Past performance of Boss Energy cannot be
relied upon as an indicator of (and provides no guidance as to) the future performance of Boss Energy. Nothing contained in this
Presentation nor any information made available to you is, or shall be relied upon as a promise, representation, warranty or
guarantee, whether as to the past, present or future.
JORC CODE
It is a requirement of the Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the Joint
Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves ("JORC Code"). Investors
outside Australia should note that while ore reserve and mineral resource estimates of the Company in this Presentation comply
with the JORC Code (such JORC Code-compliant ore reserves and mineral resources being "Ore Reserves" and "Mineral
Resources" respectively), they may not comply with the relevant guidelines in other countries and, in particular, do not comply
with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the
"Canadian NI 43-101 Standards"); or (ii) Item 1300 of Regulation S-K, which governs disclosures of mineral reserves in
registration statements filed with the SEC. Information contained in this document describing mineral deposits may not be
comparable to similar information made public by companies subject to the reporting and disclosure requirements of Canadian or
US securities laws.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy.
As the EFS utilises a portion of Inferred Mineral Resources, the ASX Listing Rules require a cautionary statement to be included in
this presentation. The EFS is based on a Mineral Resources Estimate in accordance with JORC guidelines 2012 (ASX:149% Increase
in Measured and Indicated Resources at Honeymoon dated 25 February 2019).
Boss Energy | Honeymoon Analyst Site Visit
21
Boss Energy Limited
Honeymoon Analyst Site
Visit Presentation
Keep in touch
+61 (8) 6263 4494
boss@bossenergy.com
ASX: BOE | OTCQX: BQSSF
Share your feedback
Discover