Boss Energy 2026 Sustainability Report
Released
Released
Announcement PDF
ASX Release 28 October 2026
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Matthew Dusci - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
2026 Sustainability Report
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) has today released its 2026 Sustainability Report.
The 2026 Sustainability Report can be downloaded from the Boss Energy website:
www.bossenergy.com/sustainability
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Matthew Dusci
Managing Director
P: +61 (8) 6263 4494
E: boss@bossenergy.com
Sustainability
Report
2026
Sustainability Report 2026 BOSS ENERGY 1
Scan the code to learn
more about Boss Energy
Acknowledgement of Country
Boss Energy Limited’s (Boss Energy)
South Australian mining and exploration
tenure is located on the traditional lands
of the Adnyamathanha, Ngadjuri and
Wilyakali peoples.
Boss Energy acknowledges the Traditional
Owners and custodians of these lands
and waters and recognises their enduring
connection to Country, culture and
community.
We pay our respects to Elders past and
present of the Adnyamathanha, Ngadjuri
and Wilyakali peoples, and extend that
respect to all Aboriginal and Torres Strait
Islander peoples.
Guided by The Boss Way, our ambition is to build a business that
creates lasting value through the responsible production of uranium.
Disciplined in-situ recovery.
Responsible uranium production.
Sustainability Report 2026 BOSS ENERGY 3
2 BOSS ENERGY Sustainability Report 2026
IMPORTANT NOTICES
Status and scope of this report
This FY2026 Sustainability Report is
a voluntary corporate report covering
the period from 1 July 2025 to 30 June
2026. Unless expressly stated otherwise,
information contained in this report has
not been subject to independent external
assurance. Unless otherwise stated, it
reports on Boss Energy’s operated Australian
activities only.
Certain market, industry and economic data
contained in this report has been obtained
from publicly available sources that Boss
Energy considers to be reliable as at the date
of publication. While reasonable care has
been taken in compiling such information,
Boss Energy does not represent that third-
party information is complete, accurate or
current.
This Sustainability Report should be read
together with Boss Energy’s FY2026
Annual Report, financial statements,
Corporate Governance Statement and ASX
announcements. Information contained in
this report should be read subject to any
subsequent announcements released to the
ASX by Boss Energy, which may update the
information contained in this report.
The information in this report that relates
to the Mineral Resource Estimates for the
Honeymoon Deposit, Gould’s Dam, and
Jason’s Deposit was reported in accordance
with the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’ (the
JORC Code) and is extracted from the
following public market announcements:
• the announcement entitled Honeymoon
NFS confirms continued economic
production released on 27 August
2026 (Competent Person: Mr Guillaume
Lorilleux); and
• the announcement entitled Gould’s Dam
and Jason’s Deposit Mineral Resource
and Permitting Update released on 19
March 2026 (Competent Person: Mr Ingvar
Kirchner).
These announcements are available
to view on the company’s website at
www.bossenergy.com and on the ASX
announcements platform.
Boss Energy confirms that it is not aware of
any new information or data that materially
affects the information included in the original
market announcements and that all material
assumptions and technical parameters
underpinning the estimates in the relevant
market announcements continue to apply
and have not materially changed. Boss
Energy confirms that the form and context in
which the Competent Persons’ findings are
presented have not been materially modified
from the original market announcements.
Mineral Resource estimates are imprecise
and depend on interpretations, geological
assumptions and statistical inferences.
Actual quantities, grades, continuity and
recoverability may differ as further drilling,
technical assessment and operating
information become available.
This report does not replace or amend Boss
Energy’s continuous disclosure obligations
under the ASX Listing Rules.
Forward-looking statements
This report contains forward-looking
statements concerning Boss Energy’s
plans, priorities, objectives, strategies
and expectations, including development,
production, wellfield performance,
implementation of the New Feasibility Study
and life-of-mine plan, potential development
of satellite deposits, environmental
management, rehabilitation and closure,
climate-related work and future reporting.
Forward-looking statements may be identified
by words such as “aim”, “expect”, “intend”,
“may”, “plan”, “potential”, “target” and similar
expressions, although not all forward-looking
statements contain these terms.
These statements reflect information
available and assumptions Boss Energy
considers reasonable at the date of
publication. They are not guarantees or
predictions of future performance. Actual
outcomes may differ materially as a
result of risks, uncertainties and changes
in circumstances, including geological
and hydrogeological conditions, Mineral
Resource estimates, wellfield and operating
performance, uranium recovery, regulatory
approvals, development timing, market
conditions, commodity prices, infrastructure
and supply-chain availability, weather and
climate events, workforce availability and
changes in law or regulation.
Except as required by law or the ASX Listing
Rules, Boss Energy does not undertake to
publicly update or revise forward-looking
statements after the date of this report.
Non-financial information,
estimates and uncertainty
Non-financial information is drawn from
operational and corporate systems, statutory
reports, controlled spreadsheets, workforce
records, environmental and radiation
databases, finance records and other
supporting sources.
Some measures involve estimates,
assumptions, modelling or professional
judgement. Material assumptions,
limitations and estimation uncertainty are
identified where relevant to interpretation.
Comparative information may be restated
where boundaries, source data or calculation
methods change, with material changes
explained where applicable.
Figures may be rounded and totals may
therefore not sum exactly. Maps, diagrams
and process illustrations are schematic unless
expressly stated otherwise.
Climate-related information
Climate-related information included in this
report has been prepared for the purposes
of this voluntary Sustainability Report and
should be considered in that context.
Climate risk assessment, scenario analysis,
greenhouse gas measurement and estimates
of future effects involve uncertainty;
scenarios are analytical tools rather than
forecasts or predictions.
Unless expressly stated, this Sustainability
Report has not been prepared in accordance
with the Australian mandatory climate-related
financial reporting framework or as an AASB
S2-compliant sustainability report. Climate-
related disclosures will continue to evolve as
Boss Energy develops its governance, data,
methodologies and reporting processes.
Mineral Resource information
The information in this report relating to
the Mineral Resource Estimates for Gould’s
Dam and Jason’s Deposit, and the updated
Honeymoon Mineral Resource Estimate,
is extracted from Boss Energy’s relevant
ASX announcements, for which Competent
Persons’ consents were obtained. Boss
Energy confirms that it is not aware of any
new information or data that materially
affects the information included in those
announcements and that all material
assumptions and technical parameters
underpinning the Mineral Resource Estimates
continue to apply and have not materially
changed.
Mineral Resource estimates are estimates
and actual quantities, grades, continuity
and recoverability may differ as further
drilling, technical assessment and operating
information become available.
Non-operated and third-party
information
Information relating to non-operated interests
and strategic investments including the
30% interest in the Alta Mesa Uranium
Project and the 19.9% shareholding in
Laramide Resources Ltd, is based solely on
information published or provided by the
respective operator or entity and is identified
separately. While Boss Energy reviews such
information against publicly available source
material where considered appropriate, it
does not control the underlying operational,
environmental or corporate reporting systems
used in its preparation.
No offer or financial product advice
This report is provided for general information
and does not constitute financial product
advice, personal investment advice, an offer,
invitation, solicitation or recommendation
to acquire, hold or dispose of Boss Energy
securities.
The report does not take into account the
investment objectives, financial situation or
particular needs of any person. Investors
should consider this report together with
Boss Energy’s other public disclosures and
obtain professional advice appropriate to their
circumstances before making an investment
decision.
CONTENTS
About Boss Energy 4
FY2026 snapshot 14
CEO message 16
Our sustainability framework 18
FY2026 sustainability performance 30
Protecting our people and building capability 34
Environmental stewardship 40
Respecting culture and strengthening communities 47
Responsible growth and operational resilience 51
Operating with integrity 57
Reporting basis 62
Appendices 65
This report describes Boss Energy’s
management and performance on material
sustainability matters for the year ended
30 June 2026. Unless stated otherwise,
sustainability performance data relates to
Boss Energy’s operated Australian activities
only. The reporting boundary and approach
are summarised in the table below.
More detailed information on
methodologies, estimates, boundaries and
limitations is provided in the Reporting basis
section at the end of this report.
ABOUT THIS REPORT
Item Reporting position
Reporting period 1 July 2025 to 30 June 2026
Reporting frequency Annual
Primary reporting boundary Boss Energy-operated Australian activities
Principal operation Honeymoon Uranium Operation, South Australia
Non-operated interest 30% interest in the producing Alta Mesa Uranium Project, Texas, which is managed by enCore Energy Corp.; excluded
from Boss Energy’s consolidated operational sustainability metrics and identified separately where referenced
Strategic investment 19.9% shareholding in Laramide Resources Ltd; outside Boss Energy’s operated asset base and excluded from
consolidated operational sustainability metrics
Reporting approach Prepared with reference to selected GRI Standards. This report has not been prepared in accordance with the GRI
Standards.
GRI standards used GRI 1: Foundation 2021; selected disclosures from GRI 2: General Disclosures 2021, GRI 3: Material Topics 2021 and
relevant GRI Topic Standards. GRI 14: Mining Sector 2024 was used as a sector reference in reviewing Boss Energy’s
material sustainability topics and associated disclosures.
Sustainable
Development Goals
Selected United Nations Sustainable Development Goals (SDGs) and targets are referenced where Boss Energy’s material
topics, activities and reported evidence have a clear and supportable connection.
Board approval Approved by the Board of Boss Energy on 26 October 2026
Sustainability reporting
enquiries
Please contact kwalker@bossenergy.com with sustainability reporting enquiries.
Sustainability Report 2026 BOSS ENERGY 5
4 BOSS ENERGY Sustainability Report 2026
About Boss Energy
Who are we
Boss Energy is an ASX-listed uranium
producer with producing interests in
Australia and the United States. Our flagship
asset is the 100%-owned Honeymoon
Uranium Operation in South Australia, where
we use in-situ recovery (ISR) to produce
uranium oxide concentrate (U₃O₈). During
FY2026, Honeymoon produced 1.41 million
pounds of drummed U₃O₈.
During the year, we deepened our
understanding of Honeymoon through
operating experience and technical studies.
Following the reporting period, we completed
a New Feasibility Study and updated Mineral
Resource Estimate (as announced to the ASX
on 27 August 2026), establishing a revised
life-of-mine development pathway based on
a wide-spaced wellfield design.
We are advancing technical studies,
permitting and environmental assessments
for Gould’s Dam and Jason’s Deposit to
evaluate their potential development as
additional production sources. Development
remains subject to the completion of
required studies, regulatory approvals and
investment decisions.
Our people, our values and The Boss Way
underpin how we operate. They guide how
we work together, make decisions and
take responsibility for our actions—from
protecting the safety and wellbeing of
our people to caring for the environment
and building respectful relationships with
Traditional Owners and local communities.
Together with our uranium operating
experience and specialist technical
expertise, they provide the foundation for
responsible operations and long-term value
creation.
Boss Energy also holds a 30% non-operated
interest in the producing Alta Mesa Uranium
Project in Texas, operated by enCore Energy
Corp., and a 19.9% strategic shareholding
in Laramide Resources Ltd. These interests
fall outside the operated Australian activities
covered by this Sustainability Report and are
identified separately where relevant.
Our values
The Boss Way is our statement of values and the behaviours we expect of everyone working at Boss Energy, including employees and contractors.
It sets a common standard for how we plan and carry out work, make decisions, raise concerns and hold ourselves accountable. In a year of rapid
growth and change at Honeymoon, it has provided a consistent foundation for how we operate. The Boss Way is built on five values.
Scan the code to learn
more about Boss Energy
Do What’s Right
Respect for everyone.
Integrity in every call.
Care in action.
All In Together
We share the load,
share the goal, and
share the win.
Own, Deliver & Celebrate
We aim high, own the outcome,
and when we hit the mark, we
celebrate it.
Break New Ground
Standing still isn’t in
our DNA. Every day we
push to be better than
yesterday.
Think Big, Act Bold
We back our
convictions, take the
brave step, and lift our
eyes to what’s next.
BOSS ENERGY IS A MULTI-MINE URANIUM PRODUCER, WITH THE 100% OWNED
HONEYMOON URANIUM OPERATION IN SOUTH AUSTRALIA AND A 30% INTEREST
IN THE ALTA MESA URANIUM PROJECT IN SOUTH TEXAS.
Sustainability Report 2026 BOSS ENERGY 7
6 BOSS ENERGY Sustainability Report 2026
Operating uranium project
Legend
Australia
North America
Our operating footprint
South Australia
Australia
Located approximately 80 km north-west of Broken Hill in South Australia, the Honeymoon Uranium
Operation is Boss Energy’s flagship producing asset. Since operations recommenced in April 2024,
Honeymoon has produced over 2.3 Mlb of U₃O₈. The operation utilises in-situ recovery (ISR) mining
to produce uranium oxide concentrate (U₃O₈) and comprises wellfields, a central processing plant and
supporting infrastructure. Boss is currently progressing the transition to a wide-spaced wellfield design,
which is expected to enhance operational efficiency and support future production.
Gould’s Dam and Jason’s Deposit are proximal satellite deposits to Honeymoon, with studies and
permitting now being advanced. These deposits will leverage Honeymoon’s existing infrastructure
and operating capabilities. Together, these deposits contain a combined JORC Mineral Resource of
approximately 45 Mlbs U₃O₈, providing a significant opportunity to extend mine life and support future
production growth.
South Texas
North America
The Alta Mesa Operation is a 30/70
joint venture, with enCore Energy Corp
(TSX.V:EU; NYSE:EU) (enCore) acting
as the manager, in-situ recovery (ISR)
operation in South Texas. The Operation
hosts a fully licensed and constructed
Central Processing Plant with operational
wellfields and associated exploration
projects. This Operation is currently
focused on permitting and bringing on
new wellfields to increase production.
AUSTRALIA’S ONLY ASX-LISTED PURE-PLAY URANIUM
PRODUCER WITH DOMESTIC PRODUCTION.
The Company’s focus is on safe, reliable production in South Australia through its existing operations at Honeymoon while also
bringing its satellite deposits into production.
South Australia
Jason’s Deposit
• 100%
• Satellite deposit
• 12.0 Mlbs U₃O₈
South Australia
Gould’s Dam
• 100%
• Satellite deposit
• 33.1 Mlbs U₃O₈
South Australia
Honeymoon
• 100%
• Producing Mine – 2.3Mlbs drummed
U₃O₈ since April 2024
• 20.8 Mlbs U₃O₈
Adelaide
Operating uranium project
Corporate / technical office
Satellite deposit
Legend
Perth
8 BOSS ENERGY Sustainability Report 2026
Our role in a
changing energy
system
Meeting growing electricity demand while
reducing greenhouse gas emissions is a
central challenge for the global energy
system. The International Energy Agency’s
Global Energy Review 2026i
reports that
global electricity demand increased by
approximately 3% in 2025 — around 2.3
times faster than total energy demand
— driven by growth across buildings and
industry, electrification and increasing
demand from data centres and other
digital infrastructure.
Nuclear power plays an important role in
the global electricity system, providing
reliable, low-emissions electricity
alongside renewable generation. Global
nuclear generation reached a record level
in 2025. Together, renewables and nuclear
provided more additional electricity than
the total increase in global generation
during the year, while electricity
generation from fossil fuels declined
slightly.
Investment in new nuclear capacity is also
continuing. The IEA reports that 78 GW
of nuclear capacity is under construction
across 15 countries — one of the highest
levels seen in the past 30 years. Bringing
this capacity into operation will require
successful project delivery and reliable
supply across the nuclear fuel cycle,
including uranium production.
Boss Energy contributes to this supply
chain through the production of uranium,
the raw material subsequently processed
into fuel for nuclear electricity generation.
Responsible and reliable uranium
production supports the broader fuel cycle
required for nuclear power to contribute to
meeting electricity demand while reducing
greenhouse gas emissions.
The following graphic places Boss
Energy within the nuclear fuel cycle,
distinguishing our direct activities from
downstream processing, fuel manufacture
and electricity generation undertaken by
others.
Sustainability Report 2026 BOSS ENERGY 9
Where Boss Energy sits in the nuclear fuel cycle
Responsibilities across the value chain
Electricity generation
Nuclear fuel is used to
generate electricity.
Illustrative
Fuel fabrication
Enriched uranium is
manufactured into
nuclear fuel.
Enrichment
The proportion of
uranium-235 is
increased for use in
nuclear fuel.
Conversion
U₃O₈ is converted into
a form suitable for
enrichment.
Downstream activity
Downstream nuclear fuel cycle undertaken
by other organisations
Boss Energy operational boundary-direct
operational responsibility
Boss Energy’s direct responsibilities Downstream activities
Direct operational accountability.
Outside Boss Energy’s operational control;
separate regulatory frameworks.
Methodology
Based on 1.41 Mlb of U₃O₈ produced and drummed during FY2026, equivalent to approximately 638 tonnes of U₃O₈ and approximately 541
tonnes of contained uranium. The estimate applies an illustrative generation factor of 44 GWh per tonne of natural uranium. Not a measure of
greenhouse gas emissions avoided by Boss Energy. Source: World Nuclear Association.
Boss Energy
FY2026 production
• Safe and reliable uranium recovery,
processing and product handling
• Controls over radiation, groundwater,
well integrity, process fluids and
waste
• Meeting regulatory requirements,
progressive rehabilitation and closure
planning
• Conversion, enrichment and fuel
fabrication
• Nuclear electricity generation
• Used-fuel and radioactive-waste
management
≈24 TWh
Illustrative electricity-generation
potential associated with Boss Energy’s
FY2026 uranium production.
BOSS ENERGY’S ROLE IN THE NUCLEAR FUEL CYCLE
Boss Energy produces uranium oxide concentrate. Subsequent conversion, enrichment, fuel fabrication and electricity generation are undertaken
by other organisations.
Uranium mining and recovery
Honeymoon Uranium Operation
South Australia
1.41 Mlb U3
O8
Boss Energy operational responsibility
Downstream activity Downstream activity Downstream activity
Scan the code to learn
more about Boss Energy
i International Energy Agency (IEA) (2026), Global
Energy Review 2026, IEA, Paris, pp. 9, 28–29 and 34.
Sustainability Report 2026 BOSS ENERGY 11
10 BOSS ENERGY Sustainability Report 2026
No open pit or underground mine
No waste rock dumps or conventional
tailings storage facility
Groundwater, well integrity and
process-fluid containment are actively
monitored and managed
HOW IN-SITU RECOVERY WORKS
Growth in nuclear generation would require corresponding investment across the nuclear fuel cycle, including uranium
mining, conversion, enrichment and fuel fabrication.
1
Conditioned solution
Uranium-bearing solution
Numbered steps show the
circulation loops (1-5)
Hydraulic control
Extraction is managed so arrows converge on the extraction wells - recovering the solution and
keeping it within the production zone.
Confining layer
Confining layer
Production Zone
Uranium-bearing sands
(mineralised formation)
The circulation loop
Conditioned solution injected into the sands
Uranium dissolves as solution moves through the formation
Uranium-bearing solution recovered to surface
Pumped to the processing plant
Conditioned solution returned to the wellfield
1
2
3
4
5
3 1
5
4
Monitoring well
groundwater checked beyond
the production zone
Uranium
product
2
Processing plant
Uranium recovery
& solution
conditioning
How ISR works at
Honeymoon
In-situ recovery (ISR) extracts uranium
from permeable, uranium-bearing
geological formations using a network
of injection and extraction wells. A
controlled mining solution, or lixiviant,
is injected into the mineralised zone
through injection wells, where it
mobilises uranium into solution. The
uranium-bearing solution is then
recovered through extraction wells and
transferred to the processing plant.
Uranium is removed from the solution,
which is conditioned and returned to
the wellfield for reuse.
ISR recovers uranium without
excavating the host rock. This avoids
the need for bulk excavation, waste
rock dumps and a conventional
tailings storage facility. The process
nevertheless requires careful
management of groundwater, well
integrity, process solutions, radiation
and residues, together with planning
for rehabilitation and closure.
Our approach to groundwater
protection, well integrity, process-fluid
containment, waste management and
closure is described in Environmental
stewardship. Radiation protection is
addressed in Protecting our people and
building capability.
A CONTROLLED SOLUTION RECOVERS URANIUM WITHOUT
EXCAVATING THE HOST ROCK.
Scan the code to learn
more about Boss Energy
Sustainability Report 2026 BOSS ENERGY 13
12 BOSS ENERGY Sustainability Report 2026
Our strategy
Boss Energy’s strategy is to build a
reliable, lower-cost, long-life uranium
business, underpinned by safe and
reliable operations, specialist ISR
capability and responsible development
of our resource base. Our people, our
values and The Boss Way guide delivery,
supported by disciplined wellfield
development, resilient infrastructure and
effective environmental and radiation
management.
Following year end, the Honeymoon
New Feasibility Study established a
revised life-of-mine pathway based
on a wide-spaced wellfield design.
Implementation and ongoing optimisation
will draw on production performance,
drilling, geological and hydrogeological
information, reactive-transport modelling
and operating experience.
We are also progressing studies
and permitting for Gould’s Dam and
Jason’s Deposit as potential additional
production sources for Honeymoon. This
approach provides an opportunity to use
established infrastructure to support
growth, with environmental assessment
and stakeholder engagement informing
development planning. Future investment
remains subject to technical and
economic assessment, environmental
and safety requirements, regulatory
approvals, funding, market conditions
and Board approval.
BUSINESS STRATEGY
Honeymoon - An organic pipeline of deposits with established infrastructure
Beyond Honeymoon
GROW THE RESOURCE &
DISCOVERY PIPELINE
BUILD THE REGIONAL
PRODUCTION HUB
DELIVER AND OPTIMISE
HONEYMOON
Safe, reliable and predictable production from the wide-spaced wellfield
design, underpinned by operational excellence.
Produce from Jason’s Deposit and Gould’s Dam, leveraging Honeymoon’s
installed processing infrastructure — three deposits, one plant.
Increase the known Mineral Resource and systematically explore for new
ISR-amenable deposits across the region to further leverage established
infrastructure.
MAXIMISE AND OPTIMISE
THE EXISTING PORTFOLIO
Ensure other assets in the portfolio achieve an acceptable return on capital.
Key enablers Our People Our Culture
Our Technical & Operational Expertise
A RELIABLE, LOWER-COST, LONG-LIFE URANIUM BUSINESS, UNDERPINNED
BY SAFE AND RELIABLE OPERATIONS, SPECIALIST ISR CAPABILITY AND
RESPONSIBLE DEVELOPMENT OF OUR RESOURCE BASE.
Scan the code to learn
more about Boss Energy
Sustainability Report 2026 BOSS ENERGY 15
FY2026 snapshot
FY2026 performance
Production — U₃O₈ drummed
1.41 Mlb U3
O8
+61% on FY2025
Approximately 638 tonnes of uranium oxide concentrate was drummed at Honeymoon as
production ramp-up and wellfield development continued.
FY2025 → FY2026 drummed
FY2025
FY2026
Mlb U₃O₈ drummed.
0.87 Mlb · ≈395 t
1.41 Mlb · ≈638 t
Environmental stewardship
Wellfield water circulation
FY2025: 4,768 ML extracted · 4,743 ML reinjected
FY2026: 10,027 ML extracted · 10,020 ML reinjected
FY2025 - FY2026 (ML)
10,027 ML
Extracted through
production wells
10,020 ML
Reinjected
Protecting our people and building capability
Safety performance
19.66
9 0
6 ≈1,150
TRIFR1
Total recordable injury frequency rate
FY2025: 12.8
Total recordable injuries Fatalities
Emergency exercises
and drills
Hours of emergency response
and first-aid training
FY2026 results reinforce the focus on field execution, contractor integration
and verification of critical controls.
Protecting our people and building capability
Workforce
140 Direct employees2
At 30 June 2026
Building specialist capability and broader participation remains important as
Honeymoon develops.
17.9% Women in the workforce
4.3% Aboriginal and/or Torres Strait Islander employees3
60% Women on the Board (3 of 5)
Honeymoon site 7.4% Adelaide and Perth offices 53.1%
At 30 June 2026
Protecting our people and building capability
Building technical capability
Technical qualifications and ISR experience support wellfield, processing and environmental management as Honeymoon develops.
22% 35% 88%
Hold a technical
degree
of direct employees
Prior ISR or uranium
experience
Based in South
Australia
1 Frequency rates per one million employee and contractor hours worked. FY2026 hours worked: 457,777.
2 Employee measures are at 30 June 2026 and exclude non-executive directors unless stated otherwise.
3 Based on voluntary self-identification. FY2025: 1.6%
1 Applicable Honeymoon statutory compliance reporting period.
2 Scope 2 emissions are location-based.
2
Whistleblower reports
received; neither
substantiated
Nil
Substantiated bribery
or corruption matters
Operating with integrity
During FY2026, Boss Energy refreshed its whistleblower, anti-
bribery and corruption, securities dealing and continuous disclosure
frameworks, and established a Human Rights Policy.
Responsible growth and operational resilience
Scope 1 and scope 2 emissions
CO2
5,585
t CO₂-e
Scope 1
Scope 22
1,796 t CO₂-e · 32%
3,789 t CO₂-e · 68%
Environmental stewardship
Land & rehabilitation
No unauthorised native vegetation clearance was identified.
Progressive rehabilitation included completed exploration drill sites and
other smaller disturbed areas no longer required for operations.
22.82 ha
Native vegetation cleared
under approved arrangements1
3.40 ha
Land rehabilitated or
stabilised
Supplier and contractor expenditure across Boss
Energy’s operated Australian activities
Respecting culture and strengthening communities
Regional participation and value
$132.7million
No unauthorised disturbance to Aboriginal heritage
was recorded during the reporting period.
$132.7m
Total supplier and contractor spend
$113.1m
Australian suppliers
$44.6m
South Australian suppliers
$8.6m
Within approx. 200 km of Broken Hill (42 accounts)
Responsible growth and operational resilience
Emissions and energy intensity
78,263 GJ 122.7 GJ/t
8.8
Scope 1 and 2 emissions intensity
Energy consumed Energy intensity per tonne of U₃O₈
14 BOSS ENERGY Sustainability Report 2026
t CO2
-e / t U3
O8
Sustainability Report 2026 BOSS ENERGY 17
16 BOSS ENERGY Sustainability Report 2026
FY2026 was a year of progress, learning
and significant change for Boss Energy.
We increased production at Honeymoon,
strengthened our people and technical
capability, and made important decisions to
establish a more robust foundation for the
operation’s future.
Our ambition is to build a business that
creates lasting value through the responsible
production of uranium. Achieving this
depends on safe and reliable operations,
care for the environm
Share your feedback
Discover