Growth at Honeymoon with two new satellite prospects
Released
Released
Announcement PDF
ASX Release 28 September 2023
Honeymoon Uranium Project, South Australia
Boss eyes more growth at Honeymoon
with two new satellite prospects
Highly successful scout drilling at the Billeroo and Sunrise prospects reveals
significant potential for more resources close to Honeymoon plant
Highlights
•
A limited scout drilling program at the Billeroo and Sunrise prospects just ~80km from the
Honeymoon processing plant has revealed significant potential for additional uranium
resources
•
The latest results include (PFN results, ppm pU3O8):
o 3.50m @ 1,153ppm pU3O8
o 6.25m @ 561ppm pU3O8
o 3.75m @ 868ppm pU3O8
o 4.00m @ 613ppm pU3O8
o 4.00m @ 536ppm pU3O8
o 3.75m @ 560ppm pU3O8
o 4.50m @ 440ppm pU3O8
1
GT 4,036
GT 3,506
GT 3,255
GT 2,452
GT 2,144
GT 2,100
GT 1,980
(WRM0064 from 123.00m)
(WRM0062 from 121.50m)
(WRM0051 from 116.50m)
(WRM0066 from 125.25m)
(WRM0052 from 116.75m)
(WRM0065 from 124.75m)
(WRM0055 from 118.75m)
•
Drilling on the Billeroo deposit confirms uranium mineralisation along a strike length of ~1.5km
associated with a deepening of the Billeroo Palaeovalley
•
Mineralisation at the Sunrise prospect remains open to the south and east
•
Given the wide spacing of the drilling to date, both satellite prospects represent a highly
promising opportunity to identify significant additional resource
•
The new prospects sit just 2.5km from Honeymoon’s Gould’s Dam deposit, which contains a
JORC Resource of 4.4Mt at 650ppm U308 for 6.3Mlbs contained U308 (Indicated) and 17.7Mt at
480ppm U308 for 18.7Mlbs contained U308 (Inferred)
•
These two new target areas, along with the known satellite deposits of Gould’s Dam and Jasons,
will form the basis of a study on increasing the forecast production rate to more than
3Mlb/annum U308 equivalent (from 2.45Mlb nameplate capacity) or an extension of mine life
•
Boss’ exploration strategy has already been highly successful, increasing the JORC Resource at
Honeymoon from 16.57Mlbs to 71.67Mlbs (~4.3x increase) since project acquisition in
December 20151
•
The current life-of-mine plan at Honeymoon is based on just 50% of the existing JORC Resource
Refer to ASX: BOE announcement dated 25 February 2019. Refer Appendix 1 for Honeymoon JORC 2012 Resource.
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Duncan Craib - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Paul Armstrong – Public Relations
+61 (08) 9388 1474
www.bossenergy.com
@Boss_Energy
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) is pleased to announce that its strategy to grow the
inventory, mine life and production rate at its Honeymoon uranium project continues to deliver strong
results, with scout drilling confirming two new satellite prospects close to the Honeymoon production
plant.
The results show that the Billeroo and Sunrise prospects have significant potential to add further uranium
resources to Honeymoon.
Boss Managing Director Duncan Craib said: “We have abundant exploration upside at Honeymoon, as
shown by these results and the recent success at Gould’s Dam.
“We intend to drive exploration hard with the aim of unlocking this value. This will enable us to continue
growing the inventory which will in turn underpin increases in the mine life and production rates.
“Organic growth of this nature will generate strong financial returns because we can leverage the
infrastructure we are now establishing at Honeymoon.
“With first production on track for the coming quarter, a strong pipeline of growth and an extremely
bullish outlook for the uranium market, Boss is ideally positioned to continue delivering superior returns
for shareholders”.
Figure 1: Honeymoon Uranium Project’s 100% held tenements.
Scout Drilling Program
A limited scout drilling program comprising 19 rotary mud holes for 2,520m has been completed at two
new prospects proximal to the Gould’s Dam deposit – the Billeroo prospect located ~1.2km to the north
and the Sunrise prospect ~1km to the east (Figure 2). Both prospects have very limited historical drilling,
the bulk of which was completed in the 1970s and early 1980s.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
The purpose of this program was to follow up on some highly encouraging historic results across these
prospects and identify new areas of potentially significant uranium mineralisation within the Inferred
resource envelope for future upgrade drilling.
It is envisaged that these two new target areas, in addition to the known satellite deposits of Gould’s Dam
and Jasons, will form the basis of a study to assess and define an increase in the forecast production rate
to more than 3Mlb/annum U308 equivalent or an extension of mine life.
Figure 2: Location of the Billeroo and Sunrise prospects, Gould’s Dam Project.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Billeroo Prospect
The Billeroo prospect is located within the “Inferred” resource envelope between ~1.2km - 3km
downstream to the north of the Gould’s Dam deposit. Based on limited historical drilling and geophysical
data, the area is characterised by a significant deepening of the Billeroo Palaeovalley and the deposition
of thick sequences of sand within the lower Eyre Formation (Figure 3). Historic drilling in the area is limited
to several drilling traverses ranging from ~200-250m apart – the majority of which were completed in the
early-mid 1970’s by MinAd Teton Australia. A total of 7 rotary mud drill holes for 954m were completed
as part of the recent scout drilling program, including a mix of historical hole twins and step-out drilling.
Figure 3: Results of recent scout drilling at the Billeroo prospect.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Several historic holes drilled in the early-mid 1970’s within the Billeroo prospect identified wide intervals
of uranium mineralisation associated with redox boundaries in the lower Eyre Formation sands, with
highly encouraging results including (gamma-derived, ppm eU3O8):
o 6.35m @ 375ppm eU3O8
o 6.15m @ 484ppm eU3O8
o 7.50m @ 459ppm eU3O8
GT 2,381
GT 2,977
GT 3,443
(BW111 from 121.60m)
(BW103 from 120.80m)
(BW142 from 120.70m)
Several holes drilled as part of the recent scout drilling program were designed to confirm the geology
and uranium mineralisation identified in the historic holes described above, with new drill holes
WRM0062 (twin of BW111), WRM0063 (twin of BW103) and WRM0064 (twin of BW142) allocated to this
task. These twin holes proved to be highly successful in not only confirming the highly favourable
geological setting but also for the most part upgrading the historic uranium intercepts. All three holes
intercepted thick sands within the lower Eyre Formation, with uranium mineralisation associated with a
well-developed redox boundary within these sands. Uranium mineralisation highlights from these new
twin holes include (PFN results, ppm pU3O8):
o 6.25m @ 561ppm pU3O8
o 3.75m @ 481ppm pU3O8
o 3.50m @ 1,153ppm pU3O8
GT 3,506
GT 1,804
GT 4,036
(WRM0062 from 121.50m)
(WRM0063 from 120.25m)
(WRM0064 from 123.00m)
In addition to the twin drilling, a handful of infill and step-out holes were completed to test for
continuation of mineralisation along strike. These holes for the most part continued to identify the main
ore zone associated with the lower Eyre Formation sands, with highlights including (PFN results, ppm
pU3O8):
o 4.00m @ 613ppm pU3O8
o 3.75m @ 560ppm pU3O8
o 2.25m @ 543ppm pU3O8
GT 2,452
GT 2,100
GT 1,224
(WRM0066 from 125.25m)
(WRM0065 from 124.75m)
(WRM0067 from 129.50m)
The recently completed scout drilling at the Billeroo prospect has confirmed uranium mineralisation along
a strike length of ~1.5km associated with a deepening of the Billeroo Palaeovalley, with significant gaps
of up to 250m between drilling along strike. Like the Sunrise prospect, the Billeroo prospect represents
an exciting new opportunity to potentially identify significant additional uranium mineralisation for the
Gould’s Dam project as a whole. A comprehensive infill drilling program will be carried out across the
prospect in early 2024.
Sunrise Prospect
The Sunrise prospect is located upstream of the Gould’s Dam deposit on the eastern side of a major dogleg
within the Billeroo Palaeovalley and is characterised by the development of relatively thick middle and
lower Eyre Formation sands, with uranium mineralisation associated with redox boundaries between
oxidised sands and moderately-strongly reduced lower sand units. Historic drilling throughout this
prospect is limited to a handful of wide-spaced drilling traverses, with line spacing ranging from ~250m to
over 500m (Figure 4). A total of 12 scout holes were completed at Sunrise for 1,566m of drilling during
the recent program - 11 of which were step-out holes with one twin of historic hole BW324 (drilled by
Mines Administration Pty Ltd in 1980).
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Figure 4: Results of recent scout drilling at the Sunrise prospect.
Thick lower Eyre Formation sands and a well-developed redox boundary were reported from historic hole
BW324, with associated uranium mineralisation including 3.70m @ 612ppm eU3O8 from 118.29m (GT =
2,264 m.ppm) across the redox boundary. New hole WRM0048 was drilled as a twin of BW324 and was
successful in replicating the geology and mineralised zone, returning 3.00m @ 538ppm pU3O8 from 118m
(GT = 1,614 m.ppm) along with an additional mineralised zone deeper in the sands which returned 0.75m
@ 1,400ppm pU3O8 from 125m (GT = 1,050 m.ppm).
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
The remainder of new scout holes comprised three wide-spaced step-out traverses across the prospect,
with hole spacing ranging from ~160m to 200m, with the aim of establishing the geological setting and
mineralisation potential of the prospect. This drilling was highly successful, with a number of wide
mineralised zones intercepted associated with well-developed redox boundaries within the lower Eyre
Formation sands. Highlights of this drilling include (PFN results, ppm pU3O8):
o 3.75m @ 868ppm pU3O8
o 4.00m @ 536ppm pU3O8
o 4.50m @ 440ppm pU3O8
o 5.50m @ 330ppm pU3O8
➢ plus 2.00m @ 639ppm pU3O8
GT 3,255
GT 2,144
GT 1,980
GT 1,815
GT 1,278
(WRM0051 from 116.50m)
(WRM0052 from 116.75m)
(WRM0055 from 118.75m)
(WRM0056 from 122.00m)
(WRM0056 from 102.50m)
Mineralisation at the Sunrise prospect remains open to the south and east (towards the Gould’s Dam
deposit) and given the wide spacing of the drilling to date the prospect represents an exciting opportunity
to identify potentially significant additional resource proximal to the Gould’s Dam deposit. This prospect
will be targeted with a significant infill drilling program in early 2024 in line with Boss’ plans to progress
the Gould’s Dam project.
Next steps
The final stage of the current work program at Gould’s Dam includes the installation of six groundwater
monitoring wells within the Gould’s Dam deposit to facilitate the commencement of baseline
groundwater studies, and the completion of two sonic core holes within Gould’s Dam for geochemical,
bulk density and metallurgical test work. The well installation and sonic drilling will be completed by the
end of September, with test work on the core samples to commence soon after.
The newly acquired data from the scout drilling programs described above will be used to update the
regional geological model, which will facilitate drill targeting for a comprehensive infill program at the
Billeroo and Sunrise prospects in early 2024. This work will then feed into a MRE update for these satellite
prospects proximal to the Gould’s Dam deposit once the drilling is completed.
In addition to this, there are a number of other highly prospective prospects within ~10km of the Gould’s
Dam deposit which will also be tested with exploration drilling in 2024.
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Duncan Craib
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
ASX: BOE
www.bossenergy.com
OTCQX: BQSSF
@Boss_Energy
Competent Person’s Statement
The information contained in this announcement that relates to exploration results is provided by Mr
Jason Cherry, who is a Member of the Australasian Institute of Geoscientists (AIG). Mr Cherry has
sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration, and to the activity being undertaken to qualify as a Competent Person, as defined in the
JORC 2012 edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr
Cherry has 17 years’ experience and is a full-time employee as Geology Manager for Boss Energy Ltd. Mr
Cherry consents to the inclusion in this report of the matters based on this information in the form and
context in which they appear.
Reference to previous ASX announcements
In relation to the results of the Feasibility Study announced 21 January 2020, the Company confirms that
all material assumptions underpinning the production target and forecast financial information included
in that announcement continue to apply and have not materially changed. Nothing in this announcement
pre-empts the findings of the Enhanced Feasibility Study currently being undertaken.
In relation to the Mineral Resource announced on 8 April 2016, 25 February 2019 and the Exploration
Targets announced on 25 March 2019, the Company confirms that it is not aware of any new information
or data that materially affects the information included in the original market announcement and that all
material assumptions and technical parameters underpinning the estimates in that market
announcement continue to apply and have not materially changed.
Forward-Looking Statements
This announcement includes forward-looking statements. These forward-looking statements are based
on the Company’s expectations and beliefs concerning future events. Forward-looking statements are
necessarily subject to risks, uncertainties, and other factors, many of which are outside the control of Boss
Energy, which could cause actual results to differ materially from such statements. Boss Energy makes no
undertaking to subsequently update or revise the forward-looking statements made in this
announcement, to reflect the circumstances or events after the date of this announcement.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
APPENDIX 1 – Table 1: Historical drill results
In accordance with ASX Listing Rule 5.7.2, the Company provides the following information:
Table 1: Summary of historical drill holes listed within this report.
All holes were drilled vertically (-90˚ inclination and 0˚ azimuth).
Northing
RL
EOH
From
To
Width
eU3O8*
MGA94, z54
400556
6519884
400496
6519681
400617
6520092
(m)
75
75
75
(m)
133
133
136
(m)
120.79
121.59
120.69
(m)
126.94
127.94
128.19
(m)
6.15
6.35
7.50
(ppm)
484
375
459
Grade
Thickness
(m.ppm)
2,977
2,381
3,443
BW324
401232
6516916
81
128
118.29
121.99
* All results reported as gamma-derived equivalent eU3O8 in the above table.
3.70
612
2,264
Hole ID
BW103
BW111
BW142
Easting
Values are reported above the nominal 250ppm eU3O8 cutoff grade, 0.5m minimum interval thickness
and maximum 1m internal dilution.
Table 2: Summary of results to date from the Gould’s Dam drilling program.
All holes were drilled vertically (-90˚ inclination and 0˚ azimuth).
Hole ID
WRM0048
WRM0049
WRM0050
WRM0051
Easting
Northing
RL
EOH
From
MGA94, z54
401232
6516912
plus
401362
6516906
(m)
81
(m)
133
81
133
(m)
118.00
125.00
122.50
401551
401263
6516917
6517107
plus
6517538
plus
6517787
plus
81
81
133
133
79
127
79
121
WRM0052
401327
WRM0053**
401347
WRM0054
400443
6517554
plus
78
133
WRM0055
WRM0056
400682
400671
79
84
133
133
WRM0057
WRM0058
WRM0059
401101
401244
401256
6517560
6517296
plus
plus
6516923
6517266
6517418
81
81
79
133
127
127
WRM0060
400119
78
133
WRM0061
WRM0062
400491
400491
77
75
127
136
WRM0063
400553
6517538
plus
6519521
6519679
plus
6519883
75
136
WRM0064
400614
6520090
75
138
ASX: BOE
OTCQX: BQSSF
116.50
123.25
103.00
116.75
101.75
115.00
101.75
117.75
118.75
102.50
118.25
122.00
124.25
0.00
To
Width
pU3O8*
(m)
(m)
(ppm)
121.00
3.00
538
125.75
0.75
1,400
123.75
1.25
673
Hole collapsed - no logs obtained
120.25
3.75
868
124.00
0.75
557
103.75
0.75
601
120.75
4.00
536
102.50
0.75
546
115.75
0.75
256
103.75
2.00
553
120.25
2.50
370
123.25
4.50
440
104.50
2.00
639
120.00
1.75
319
127.50
5.50
330
125.50
1.25
376
0.00
0.00
0
Grade
Thickness
(m.ppm)
1,614
1,050
841
3,255
418
451
2,144
410
192
1,106
925
1,980
1,278
558
1,815
471
0
121.75
102.75
116.75
0.00
118.25
121.50
123.25
105.25
118.75
0.00
119.75
127.75
1.50
2.50
2.00
0.00
1.50
6.25
259
610
1,100
0
330
561
389
1,525
2,200
0
495
3,506
120.25
123.00
124.00
126.50
3.75
3.50
481
1,153
1,804
4,036
www.bossenergy.com
@Boss_Energy
Hole ID
Easting
Northing
RL
EOH
From
To
Width
pU3O8*
Grade
Thickness
(m.ppm)
MGA94, z54
(m)
(m)
(m)
(m)
(m)
(ppm)
400849
6520358
76
139
120.25
122.00
1.75
319
558
plus
124.75
128.50
3.75
560
2,100
WRM0066
401078
6520618
76
139
107.75
108.25
0.50
375
188
plus
125.25
129.25
4.00
613
2,452
WRM0067
401077
6520762
76
139
108.00
109.25
1.25
451
564
plus
129.50
131.75
2.25
543
1,222
* All results reported as PFN-derived pU3O8 in the above table unless otherwise indicated.
**Drill holes WRM0053 could not be logged with the PFN tool and is therefore reported as calibrated gamma
derived equivalent U3O8 (eU3O8).
WRM0065
Values are reported above the nominal 250ppm pU3O8 cutoff grade, 0.5m minimum interval thickness
and maximum 1m internal dilution.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
JORC Code, 2012 Edition – Table 1
Section 1 – Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core
is oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample recovery and ensure representative
nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
• The latest WRM series drill holes have been geophysically logged upon
completion with a combination of Prompt Fission Neutron (PFN),
Borehole Magnetic Resonance (BMR), calibrated gamma, neutron
porosity, formation density, induction and magnetic deviation tools.
Data is collected at 1cm intervals and incorporated in the Boss Energy
drilling database.
• Historic uranium grade data from the BW series drilling (completed in
the 1970’s and early 1980’s) was digitised from paper logs by Southern
Cross Resources.
• All natural gamma and Prompt Fission Neutron (PFN) tools used during
this drilling program were calibrated at the PIRSA calibration facility in
Adelaide prior to the program commencing.
Drilling
techniques
Drill sample
recovery
ASX: BOE
OTCQX: BQSSF
• The drilling technique used for all holes was the Rotary Mud, with all
drilling completed by highly experienced contractor Watson Drilling.
Drill cuttings were collected at 1m intervals for geological logging.
• Drill chips were collected for geological logging purposes only, with
good to very good sample recoveries.
www.bossenergy.com
@Boss_Energy
Criteria
JORC Code explanation
Commentary
Logging
• Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/secondhalf sampling.
• Whether sample sizes are appropriate to the grain size of the material being
sampled.
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• All WRM series drill holes have been geologically logged and
incorporated into the Boss Energy database.
Sub-sampling
techniques and
sample
preparation
Quality of
assay data and
laboratory
tests
Verification of
sampling and
assaying
ASX: BOE
OTCQX: BQSSF
• The PFN tool has a depth of investigation radius of approximately 2540 cm around the borehole. This provides an accurate measurement of
epithermal/thermal neutron ratios for the calculation of pU3O8.
• No chemical assay sampling was carried out for the drill holes in
question.
• Given the historic nature of the BW series holes, it is not possible to
comment on the gamma logging carried out at the time.
• All PFN and gamma tools being used as part of the current drilling
campaign have been calibrated at the PIRSA calibration facility in
Adelaide by both Boss Energy and logging contractor Borehole Wireline
prior to the program commencing.
• Given the historic nature of the BW series holes, it is not possible to
comment on the calibration of gamma logging tools carried out at the
time.
• A number of twin holes are being drilled as part of the current
campaign. The PFN and calibrated gamma results from this drilling will
be used to verify previous PFN results and also to verify/upgrade the
historic gamma logging from the 1970’s/1980’s.
• Natural gamma logs are used to depth match all geophysical tool runs
to ensure accuracy.
www.bossenergy.com
@Boss_Energy
Criteria
JORC Code explanation
Commentary
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and downhole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
• Whether sample compositing has been applied.
• The current WRM series drill holes have been pegged using a Trimble
TDC600 high accuracy DGPS with a nominal accuracy of ~0.1m.
Coordinates are cited in MGA94 grid, z54.
• Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit
type.
• If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
• The measures taken to ensure sample security.
• All new & historical holes were drilled vertically which provides an
accurate intersection of the flat laying mineralised bodies.
• The results of any audits or reviews of sampling techniques and data.
• All information and data used in this report have been reviewed by the
Boss Energy Competent Person. Multiple PFN tools are being run on
several of the new WRM series holes for validation and comparison
purposes.
Data spacing
and
distribution
Orientation of
data in relation
to geological
structure
Sample
security
Audits or
reviews
ASX: BOE
OTCQX: BQSSF
• The Competent Person has reviewed all available data and, based on
their knowledge and experience with the various exploration
techniques employed, is satisfied that the historical drilling data
included here is of sufficient quality and accuracy to provide a
reasonable, if indicative, basis for the mineralisation reported herein.
• The current WRM series drill hole spacing ranges from 40m to ~200m
within the Indicated portion of the deposit.
• All PFN and gamma-derived eU3O8 data (both new and historic) has
been composited to 25cm intervals where possible.
• All new data from the current campaign is processed and verified on
site and then incorporated directly into the Boss Energy database.
www.bossenergy.com
@Boss_Energy
Section 2 – Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
• Acknowledgment and appraisal of exploration by other parties.
• The Project consists of 1 granted Mining Lease, 5 granted Exploration
Licenses, 3 Retention Leases and 2 Miscellaneous Purpose Licenses.
• Deposit type, geological setting and style of mineralisation.
Palaeovalley-type, sand-hosted, tabular style uranium of the following
model:
• Narrower, mineralised, palaeochannels within a broader palaeovalley
system,
• Underlying basement faults reactivated sporadically, greatly
influencing the shape and formation of the overlying fluvial system,
creating uplifted ridges of basement and the meandering narrow
palaeochannels described above;
• REDOX interfaces from the vertical and lateral movement of
uraniferous (oxidised) fluids from south (granitic source rocks in the
Olary Ranges) to north (towards Lake Frome);
• Organic/sulphide-rich horizons and possible hydrocarbon fluids, the
latter seeping upwards along the basement faults. Organic- and
sulphide-rich material formed within shallow channel embankments
and ledges.
Exploration
done by other
parties
Geology
ASX: BOE
OTCQX: BQSSF
• The Gould’s Dam region and surrounding areas of the Billeroo and
Curnamona Palaeovalley’s have been systematically explored and
drilled starting from 1969.
www.bossenergy.com
@Boss_Energy
Criteria
JORC Code explanation
Commentary
Drill hole
Information
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
• In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detai
Share your feedback