Quarterly Activities Report - September 2023
Released
Released
Announcement PDF
ASX Release October 25, 2023
September 2023 Quarterly Report
Boss set to become only ASX-listed
pure play Australian uranium
producer
Imminent start-up at Honeymoon Project in South Australia positions Boss to
capitalise on demand for uranium from Tier-1 locations
Quarterly Highlights
•
Honeymoon continues to run on time and on budget with project execution proceeding to plan
•
Mining operations started, paving way for first production in the December quarter, 2023
•
Wellfield pre-conditioning underway as final step before start of uranium extraction
•
Gypsum repository completed; Water Treatment Plant and RO Plant being commissioned
•
Experienced wellfield personnel recruited and all positions filled
•
Boss won a competitive application to explore potential new uranium province just 130km from
Honeymoon
•
Strong infill drilling results at Gould’s Dam satellite deposit support plan to grow mine life and
production rates,
•
In light of the strong results, Boss is now preparing for technical and economic studies on
developing Gould’s Dam as an additional production source
•
Highly successful scout drilling at the Billeroo and Sunrise satellite prospects reveals significant
potential for more resources close to Honeymoon
•
These two new target areas, along with the known satellite deposits of Gould’s Dam and Jasons,
will form the basis of a study on increasing the forecast production rate to more than
3Mlb/annum U3O8 equivalent (from 2.45Mlb nameplate capacity) or an extension of mine life
•
The current life-of-mine plan at Honeymoon is based on just 50% of the existing JORC Resource
•
Major milestone achieved with the arrival onsite of the first set of NIMCIX loading and elution
columns for the new Ion Exchange (IX) circuit
•
The adoption of IX technology, which is central to the processing plant, will enable highly
efficient capture, concentration, and purification of the uranium from the wellfields
•
This will result in increased throughput, more production and lower costs than was possible
using the solvent extraction system previously employed at Honeymoon
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Duncan Craib - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Paul Armstrong – Public Relations
+61 (08) 9388 1474
www.bossenergy.com
@Boss_Energy
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) is pleased to report that another successful quarter at its
Honeymoon project has left it poised to become the only ASX-listed pure play Australian uranium
producer.
The Company is on track to start uranium production in the December quarter, 2023.
Boss Managing Director Duncan Craib said: “We have continued to implement our development strategy
in line with the budget and timetable.
“This highly successful execution has ensured we are set to start production this quarter as planned,
making Boss Australia’s third uranium producer and the only pure play Australian uranium producer on
the ASX.
“With the uranium price recently hitting a decade high of US$73 a pound, we are now perfectly positioned
to capitalise on this huge opportunity.
“Our position is further strengthened by the fact that we have no debt, cash on hand of $63 million1 and
a strategic uranium stockpile now worth $1442 million based on current spot prices”.
Key Achievements in September Quarter
Committed expenditure under the Honeymoon re-development program totals A$95M (or 90%) of the
budgeted ~A$106M CAPEX, excluding a A$7M contingency, with incurred costs amounting to A$66M.
All critical path items remain on track for delivery in line with the project schedule. More than 276
procurement packages have been issued. The packages awarded to date are in line with the front-end
engineering design (FEED) released to the ASX on 31 March 2022.
Infill drilling on satellite deposits to grow mine life and production rate
In July 2023, Boss announced the start of an infill drilling program targeting the Gould’s Dam and Jason’s
satellite deposits at Honeymoon.
The program was aimed at upgrading the resources at both deposits while improving the geological and
hydrogeological understanding of the uranium mineralisation.
Mr Craib said: “These satellite deposits have the potential to expand Honeymoon’s production profile and
extend the current mine life.
“Increases in the forecast production rate were not considered as part of the current Honeymoon restart
feasibility studies. But given the strong outlook for the uranium market, we want to unlock the substantial
value which would result from increasing the inventory and production rate”.
Boss completed detailed geological modelling and planning for resource upgrade drilling on Gould’s Dam
and Jasons deposits. These studies highlighted the opportunity to grow and upgrade the satellite JORC
resources.
It is envisaged that these new target areas will form the basis of a study to assess and define an increase
in the forecast production rate to more than 3Mlb/annum U308 equivalent or an extension of mine life.
1 As at 30 September 2023 (excluding 100% cash backed environmental bond of approximately A$9M)
2 Strategic uranium stockpile valued at A$144M based on a spot U O price of US$73/lb and an exchange rate of A$1:US$0.632
3 8
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
High-grade drilling results point to growth in mine life and production rates
In August 2023, Boss announced high-grade results from Resource extension and infill drilling at the
Gould’s Dam satellite deposit at Honeymoon.
Mr Craib said: “These strong drilling results are in line with our strategy to increase the inventory at
Honeymoon. This will in turn enable us to grow the mine life and production rate, increasing cashflow and
leveraging our existing infrastructure.
“The results from new drill holes within the resource surpass our expectations in both grade and thickness
of the mineralisation. This is demonstrated by the exceptional results from WRM0013 including 5.25m
width @ 3,744ppm pU3O8 (19,658 GT).
“To put it into perspective, our cut-off grade is 250ppm and while we could mine at lower grades, there
are numerous cost and operational benefits to leaching higher grade material from continuous
thicknesses. Primarily, less ore has to be leached to extract the same amount of contained uranium, which
typically results in lower operating costs and increased operating margins.
“The data also enables us to improve our exploration models for the region and strongly suggests that
future exploration programs have the potential to add to the existing Mineral Resource”.
Strong infill drilling results at Gould’s Dam satellite deposit support plan to grow mine life and
production rates
In September 2023, Boss announced more strong drilling results from within the Indicated Resource at
the Gould’s Dam deposit at Honeymoon.
The results are important because they support Boss’ strategy to grow the production rates and mine life
at Honeymoon.
Mr Craib said: “These latest infill drilling results demonstrate the quality of the Gould’s Dam deposit and
the strong potential for it to play an important role in the growth strategy at Honeymoon.
“In light of all the drilling results we have received, we have decided to start baseline technical and
economic studies on Gould’s Dam with the aim of moving it towards development. We will also undertake
scout drilling to potentially grow the overall Gould’s Dam Resource.
“This approach is consistent with our overall aim of growing Honeymoon’s production, which will in turn
enable us to capitalise fully on the infrastructure we are establishing at the project, in turn driving strong
financial returns”.
Boss achieves significant milestone with commencement of mining operations on Honeymoon
Subsequent to the end of the quarter, Boss announced the commencement of mining activities on
Honeymoon, with the first wellfield being pre-conditioned in the lead up to in-situ recovery (ISR) feeding
the processing plant with extracted uranium during Q4 2023.
Pre-conditioning effectively cleans the wellfields of unwanted chlorides and calcium prior to uranium
recovery being extracted. To achieve this milestone Boss has successfully completed major construction
activities including wellfield development, gypsum repository construction, water treatment and RO plant
commissioning. Completion of these milestones ensures Honeymoon remains on track for production in
the December quarter, 2023.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Drilling for base metals underway at Honeymoon
Subsequent to the end of the quarter, Boss announced that First Quantum Minerals (TSE:FM) (FQM) had
commenced a maiden diamond drilling program targeting basement-hosted base metal mineralisation
below the Yarramba Palaeovalley on Honeymoon’s tenements in South Australia.
The drilling program will cover three high-priority targets identified from extensive analysis and modelling
of geophysical and geochemical datasets, alongside geological logging of historic drill holes at the state
core library in Adelaide. The drilling will comprise at least five diamond core holes for a minimum of
1,800m drilling, with experienced drilling contractor DDH1 chosen to complete the program. The program
is expected to take 4-6 weeks, with geochemical assay results expected within 1-2 months of program
completion.
Boss Energy entered into an exploration earn-in agreement with FQM in February 2022. FQM is a
significant Canadian-listed group operating eight mines across four continents producing copper, nickel,
and gold with an additional three mines under development. With a proven track record in discovering
and developing deposits, Boss considers FQM an ideal partner in the exploration and potential
development of any base metal discoveries at Honeymoon.
Boss Managing Director Duncan Craib said: “This agreement is an outstanding opportunity for Boss and
our shareholders.
“We have a global leader in FQM funding base metals exploration at Honeymoon, giving Boss significant
exposure to their success at no cost to us while we focus on our goal of becoming Australia’s next uranium
producer”.
Image 1: Commencement of ISR mining operations underway on Honeymoon
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Image 2: RO and Water Treatment Plant being commissioned
Uranium Market Analysis
The spot price has risen from $56.20/lb at the end of June to $70/lb at the end of September. The quarter
had a slow start despite the coup in Niger and the news about delays to the start-up of new production.
The underlying fundamentals continue to improve with less uranium available in the spot market and
demand rising from the traditional as well as financial buyers. Much of the buying, in the spot market,
during this quarter has been from financial entities and traders while new entrants from the financial
sector continue to evaluate opportunities.
The YTD term market has been active and, based on volumes traded to date of 145M U3O8 lbs, volumes
have already exceeded those in 2022 of 120M lbs U3O8. The term price indicator at the end of September
was $61/lb, $10/lb higher than at the end of 2022, and the first time the term price indicator has been
above $60/lb since the end of 2012.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
The ongoing invasion of Ukraine by Russia, the Niger coup and the recent events in Israel have heightened
awareness of geopolitical tensions and the importance of security of supply. Contracts for supply to
utilities in this decade are being sourced from existing production, expansions, and new supply. Any
delays to startups or expansions will put more pressure on the spot and long-term prices.
The Honeymoon mine will be starting production in Q4 2023 and is currently on time and on budget and
debt free. As a new mine in a politically stable country and in a uranium friendly state it is well positioned
to offer stability in an uncertain market.
Strong Balance Sheet
As at September 30, 2023, the Company held unrestricted cash and cash equivalents of A$63M, which
excludes a fully cash-backed environmental bond of A$8.9M. Cash balances are being managed with a
term deposit program to take advantage of the higher interest rate environment.
The Company also holds inventory of 1.25Mlb of U3O8, which has a current spot market value of A$144M.
Combined with unrestricted cash, Boss has liquid assets of A$207M, no long-term debt obligations, leaving
it well-positioned to transform Honeymoon into production.
Appendix 5B disclosures
In line with its obligations under ASX Listing Rule 5.3.5, Boss notes that the only payments to related
parties of the Company, as disclosed in the Appendix 5B (Quarterly Cashflow Report) for the period ended
30 September 2023, consist of executive director, company secretary and chief financial officer salaries
and wages (including superannuation) and payment of non-executive director fees.
During the quarter ended 30 September 2023, the Company spent approximately $25.0M on project and
exploration activities relating to its Honeymoon Project. These activities included:
•
•
•
•
Technical studies costs
Construction equipment;
Wellfield drilling and development costs;
Engineering and construction expenses.
In addition to these activities the Company continued to incur costs relating to the ongoing maintenance
activities required at Honeymoon. The expenditure represents direct costs associated with these
activities as well as capitalised wages which can be directly attributable to Honeymoon.
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Duncan Craib
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
ASX: BOE
www.bossenergy.com
OTCQX: BQSSF
@Boss_Energy
Appendix One:
Schedule of Mining Tenements
The following information is provided pursuant to Listing Rule 5.3.3 for the quarter ended 30 September
2023.
Tenement Name
Location
Licence Number
Interest
Yarramba
South Australia
EL6510
100%
South Eagle
South Australia
EL6081
100%
Gould’s Dam
South Australia
EL6512
100%
Katchiwilleroo
South Australia
EL6511
100%
Ethiudna
South Australia
EL6020
100%
Gould’s Dam
South Australia
RL83-85
100%
Honeymoon Mine
South Australia
ML6109
100%
Prairie Dam
South Australia
ELA2023/00049
75%
Chalker Dam
South Australia
ELA2023/00051
75%
Oakvale
South Australia
ELA2023/00052
75%
Gairloch
South Australia
ELA2023/00053
75%
The Company was awarded four new Exploration Licence Applications (ELAs) in northwestern South
Australia approximately 130km south of the Honeymoon Mine during the quarter. There were no mining
tenement divestments during the quarter.
EL6512, 6511, 6020, 6510 and 6081 are subject to an earn-in agreement with First Quantum Minerals in
respect to the base and precious metal rights. Refer ASX release dated 10 February 2022 for further
information.
Honeymoon’s Mineral Resource (lower cut-off of 250 ppm U3O8)
Classification
Tonnage
(Million Tonnes)
Average Grade
(ppm U3O8)
Contained Metal
(Mkg, U3O8)
Contained Metal
(Mlb, U3O8)
Measured
3.1
1,100
3.4
7.6
Indicated
18.4
630
12.0
25.5
Inferred
30.9
570
18.0
38.5
Total
52.4
620
32.5
71.6
Reference to previous ASX announcements
In relation to the results of the Enhanced Feasibility Study announced on 21 June 2021, the Company
confirms that all material assumptions underpinning the production target and forecast financial
information included in that announcement continue to apply and have not materially changed.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
The mineral resource estimates in this announcement were reported by the Company in accordance with
listing rule 5.8 on 25 February 2019. The Company confirms it is not aware of any new information or data
that materially affects the information included in the previous announcement and that all material
assumptions and technical parameters underpinning the estimates in the previous announcement
continue to apply and have not materially changed.
Forward-Looking Statements
This announcement includes forward-looking statements. These forward-looking statements are based
on the Company’s expectations and beliefs concerning future events. Forward-looking statements are
necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Boss,
which could cause actual results to differ materially from such statements. Boss makes no undertaking to
subsequently update or revise the forward-looking statements made in this announcement, to reflect the
circumstances or events after the date of this announcement.