FQM commences drilling for base metals at Honeymoon
Released
Released
Announcement PDF
ASX Release 17 October 2023
Honeymoon Uranium Project, South Australia
Drilling for base metals
underway at Honeymoon
FQM conducting 1800m diamond drilling program as part of the earn-in agreement
which gives the global major base metals rights over five tenements at Honeymoon
Highlights
• The Boss-FQM agreement gives FQM the right to earn a 51% interest in Honeymoon’s base metal
endowment by spending $6m on exploration and a further 24% interest by sole-funding all base
metals expenditure up to a Decision to Mine
• The agreement enables Boss to remain fully-focused on its core business of uranium exploration,
development and production while having exposure at no cost to the significant potential of a base
metals exploration program led by a global major
• As part of the agreement, FQM has started an initial preliminary base metals exploration program;
Expenditure incurred beyond this initial program will then count towards the earn-in
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) is pleased to announce that First Quantum
Minerals (TSE:FM) (FQM) has commenced a maiden diamond drilling program targeting basementhosted base metal mineralisation below the Yarramba Palaeovalley on Honeymoon’s tenements in
South Australia.
The drilling program will cover three high-priority targets identified from extensive analysis and
modelling of geophysical and geochemical datasets, alongside geological logging of historic drill holes at
the state core library in Adelaide. The drilling will comprise at least five diamond core holes for a
minimum of 1,800m drilling, with experienced drilling contractor DDH1 chosen to complete the
program. The program is expected to take 4-6 weeks, with geochemical assay results expected within
1-2 months of program completion.
Boss Energy entered into an exploration earn-in agreement with FQM in February 2022. FQM is
a significant Canadian-listed group operating eight mines across four continents producing copper,
nickel, and gold with an additional three mines under development. With a proven track record in
discovering and developing deposits, Boss considers FQM an ideal partner in the exploration
and potential development of any base metal discoveries at Honeymoon.
Boss Managing Director Duncan Craib said: “This agreement is an outstanding opportunity for Boss
and our shareholders.
“We have a global leader in FQM funding base metals exploration at Honeymoon, giving Boss significant
exposure to their success at no cost to us while we focus on our goal of becoming Australia’s next
uranium producer”.
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Duncan Craib - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Paul Armstrong – Public Relations
+61 (08) 9388 1474
www.bossenergy.com
@ Boss_Energy
Earn-in and Joint Venture Principles
The Agreement relates to base metals rights over the following 5 tenements at Boss' Honeymoon
Uranium Project: EL 6512, EL 6511, EL 6020, EL 6510, EL 6081 (collectively referred to as the "JV Project".
Having completed the exploration targeting and due diligence program, FQM, through its subsidiary First
Quantum Minerals (Australia) Pty Ltd, has decided to proceed with the work program ("Work Program")
or withdraw from the JV Project. The Work Program will comprise target definition programs and 1,800m
of RC and diamond drilling and all associated geochemical analysis.
After completion of the Work Program, FQM may elect to earn a 51% interest in the JV Project by sole
funding $6M of expenditure within 5 years and maintaining minimum annual expenditure on the JV
Project of $500,000 ("First Earn-in"). At this point, the parties will enter into a joint venture agreement.
After completion of the First Earn-in, FQM may elect to earn an additional 24% interest in the JV Project
for a total interest of 75% by sole funding expenditure on the JV Project until a Decision to Mine within
5 years and maintaining minimum annual expenditure on the JV Project of $500,000 ("Second Earn-in").
FQM may extend the Second Earn-in up to 10 years by increasing minimum annual expenditure on the
JV Project to $1M.
After acquiring a 75% interest, FQM shall continue to sole fund required studies and programs up to
receipt of all permits for commencement of construction, after which Boss can maintain its project
interest of 25% by funding its share of project development costs or dilute.
If FQM does not complete the Second Earn-in, Boss' interest in the JV Project will revert to 51% with
FQM retaining a 49% interest.
Boss shall be the operator of the JV Project until FQM has acquired a 51% interest after which FQM can
opt to become the operator.
Boss retains the sole right to explore for and exploit all uranium discoveries on the JV Project (being
greater than 50% of the in-situ metal value being uranium). Boss will have a first right of offer in respect
of any uranium discoveries made by FQM within the Curnamona craton of South Australia.
FQM may withdraw from the JV Project at any point pursuant to 60 days' notice. If the withdrawal occurs
after FMQ has earned a 51% interest, but prior earning a 75% interest, Boss shall revert to a 51% interest.
Should either party's interest fall below 10%, its interest will convert to a 1% net smelter royalty.
Drilling program overview
First Quantum’s maiden drilling program will comprise at least five diamond drill holes for a minimum of
1,800m covering three high priority targets known as Atlas, Pandora and Yarramba. The objective of the
drilling program is to test for base and precious metals in the older bedrock below the sedimentary
sequences which locally host uranium, including that of the Honeymoon deposit. Target styles include
stratiform copper-gold and structurally-hosted mineralisation, with the Bimba Formation position
(regionally anomalous transition between major stratigraphic packages of the Willyama Supergroup and
host to the nearby Kalkaroo Cu-Au deposit) being targeted in almost all cases. All drill lines were cleared
during a recent heritage clearance with the NAWNTAC native title group in April 2023.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
“Atlas” drill target
The Atlas target consists of a distinctive ‘bulge’ in typically straight-tracking magnetic grain adjacent to a
Honeymoon Granite body, along strike from Hunter’s Dam Pb-Zn prospect. This is interpreted as a doublyplunging antiform (dome), approximately 4km long with likely preserved Bimba Formation position on the
north-western flank based on the strong contrast in aeromagnetic imagery and geochemical anomalism
present in historic shallow drill holes (Figure 1). At least two drill holes have been planned as a section
along one line at the Atlas target, with contingency for a third hole along strike if initial drilling produces
favourable result.
Figure 1: Location of planned holes at Atlas target, with aeromagnetic RTP res 1km greyscale image as background
overlaid by interpreted stratigraphy and anomalous geochemistry from historic RM/AC/RC drilling.
“Pandora” drill target
The Pandora target of a NNE-SSW trending strongly magnetic feature located between two Honeymoon
Granite bodies. Potentially a significant structure, the fault appears to bisect a regional synform, and may
form part of an array or wider fault zone along with other interpreted faults nearby, all of which are similar
in orientation to inferred early growth faults. The structure is highly magnetic and appears similar in
appearance to the Kalkaroo Fault - this may represent a fluid flow pathway with strong associated iron
alteration.
Two holes on two lines are planned at the Pandora target, with the northern of the two (Figure 2) testing
the potential for preserved Bimba Formation between the two granites, perhaps concealed within their
unusual magnetic rim’ and the interpreted intersection of the fault with this location.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Figure 2: Location of northern planned hole at Pandora target, in relation to historic RM/AC/RC drill section with
anomalous geochemistry and interpreted stratigraphy, 3D mag inversion (pink body) and 2D profile modelling of
the top of magnetic surface (grey polygon).
“Yarramba” drill target
The Yarramba target is a regional structural domal feature. A major ~NNW-SSE trending doubly plunging
magnetic antiform, inferred to be cored by magnetic Curnamona Group, and located adjacent to the
position of a potential syn-depositional growth fault. The dome remains untested, with only one historic
diamond hole located on the eastern flank of the dome structure outside of Boss Energy tenure.
Previous depth to source modelling indicated that deep drilling (~600m) would be required to reach the
magnetic anomaly which may represent the Curnamona Group & the base of the target Bimba Formation
(Figure 3). At this stage, one deep diamond drill hole is planned to test modelled magnetic anomalies
within the centre of the dome structure.
Figure 3: Yarramba Dome perspective view looking SW with a slight dip.
Yellow & teal bodies represent interpreted block model magnetic centres.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Next steps
Following the completion of the drilling program, downhole petrophysical logging will be completed for
all drill holes, with drill core samples submitted for geochemical assay. All geological and geophysical
information obtained will be used to update geological modelling and be used to guide future work
programs. Assay results are expected to be received ~1-2 months following the conclusion of the drilling
program.
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Duncan Craib
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
Competent Person’s Statement
The information contained in this announcement that relates to exploration results is provided by Mr
Jason Cherry, who is a Member of both the AusIMM and the Australasian Institute of Geoscientists (AIG).
Mr Cherry has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration, and to the activity being undertaken to qualify as a Competent Person, as defined in
the JORC 2012 edition of the “Australasian Code for Reporting of Mineral Resources and Ore
Reserves”. Mr Cherry has 17 years of experience and is a full-time employee as Geology Manager for Boss
Resources Ltd. Mr Cherry consents to the inclusion in this report of the matters based on this information
in the form and context in which they appear.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Share your feedback
Discover