Significant production potential at Gould's Dam
Released
Released
Announcement PDF
ASX Release 26 June 2024
Honeymoon Uranium Project, South Australia
Strong intercepts confirm significant
production potential at Gould’s Dam
Latest results support Boss’ strategy to significantly increase Honeymoon’s
annual production capacity and mine life
Highlights
•
Gould’s Dam is located ~80km northwest of the Honeymoon Mine and currently contains a
JORC-compliant resource of 25Mlbs of indicated and inferred U308
•
The results highlight the potential for Gould’s Dam to help lift Honeymoon’s production rate
from the current nameplate capacity of 2.45M lbs a year to the Export Permit limit of 3.3M lbs
a year and/or extend the mine’s useful life
•
The latest drilling is targeting three key areas within the inferred resource envelope at Gould’s
Dam – Sunrise, Billeroo and Beulah; The program will assist with wellfield planning and other
pre-development work
•
Infill and step-out drilling at Sunrise and Billeroo targets is almost complete. A total of 96 mud
rotary holes have been drilled to date for 12,911m, with uranium mineralisation highlights
including (PFN results, ppm pU3O8):
o 4.00m @ 2,925ppm pU3O8
GT 11,700
o 4.25m @ 2,230ppm pU3O8
GT 9,478
o 3.25m @ 1,406ppm pU3O8
GT 4,570
o 5.25m @ 800ppm pU3O8
GT 4,200
o 2.25m @ 1,717ppm pU3O8
GT 3,863
o 1.25m @ 2,877ppm pU3O8
GT 3,596
o 1.75m @ 1,990ppm pU3O8
GT 3,483
o 3.75m @ 773ppm pU3O8
GT 2,899
o 1.50m @ 1,855ppm pU3O8
GT 2,783
o 4.50m @ 545ppm pU3O8
GT 2,453
o 4.75m @ 506ppm pU3O8
GT 2,404
o 4.75m @ 484ppm pU3O8
GT 2,299
➢ plus 1.75m @ 1,294ppm pU3O8 GT 2,265
o 3.00m @ 756ppm pU3O8
GT 2,268
(WRM0151 from 122.75m)
(WRM0109 from 120.75m)
(WRM0128 from 123.75m)
(WRM0099 from 117.00m)
(WRM0159 from 121.75m)
(WRM0114 from 124.50m)
(WRM0142 from 120.25m)
(WRM0130 from 123.75m)
(WRM0121 from 120.25m)
(WRM0140 from 103.25m)
(WRM0157 from 122.50m)
(WRM0143 from 123.00m)
(WRM0143 from 128.50m)
(WRM0084 from 118.50m)
•
Exploration will now focus on the Beulah satellite deposit where 40 holes are planned to better
define the mineralisation and geological characteristics of this region
•
Ongoing detailed geological and mineralisation modelling will support further development
work and preparation for an ISR Mining Lease proposal at Gould’s Dam
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Duncan Craib - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Paul Armstrong – Public Relations
+61 (08) 9388 1474
www.bossenergy.com
@Boss_Energy
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) is pleased to announce high-grade drill results on the
Gould’s Dam satellite deposit.
These results support the Company’s strategy to increase the nameplate production rate and mine life at
its 100 per cent-owned Honeymoon Uranium Mine in South Australia.
In light of these strong results, work has commenced on accelerating the development of Gould’s Dam,
which is an important satellite project to the nearby Honeymoon Mine.
The current delineation program provides important data which will be used in wellfield planning and
other advanced pre-development activity.
It will also enable Boss to complete detailed geological and mineralisation models which will support the
ongoing development work and preparation for an ISR Mining Lease proposal for Gould’s Dam.
This will lead into the next phase of mine plan development, including pump testing of the mineralised
aquifer within the Gould’s Dam Indicated resource (utilising monitoring wells installed during the 2023
drilling campaign) and core sample test work. This will provide important baseline hydrogeological and
metallurgical characteristics of the mineralised aquifers.
Figure 1: Overview of Boss Energy tenure in South Australia.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Resource Infill Drilling Program
Three key areas within the current Inferred resource envelope at Gould’s Dam were targeted as part of
this infill drilling program – namely the Sunrise, Billeroo and Beulah targets (Figure 2). Holes were logged
with the Boss Energy in-house PFN tools for uranium grade characterisation, and Borehole Magnetic
Resonance (BMR) tools for lithological determination.
Figure 2: Overview of drilling completed in 2023 within the Inferred Resource at the Gould’s Dam project.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Billeroo area drill results
The Billeroo area is located within the “Inferred” resource envelope between ~1.2km - 3km north of the
Gould’s Dam deposit. The area is characterised by a significant deepening of the Billeroo Palaeovalley and
the deposition of thick sequences of sand within the lower Eyre Formation. A total of 59 mud rotary drill
holes for 8,080m have been completed so far, comprising a series of largely east-west oriented infill drill
lines and step-out holes along a strike length of ~1.5km (Figure 3).
The program to date has produced excellent results, including the best uranium intercepts to date outside
of the Gould’s Dam Indicated Resource within the Western project area. Uranium mineralisation
highlights include the following (PFN results, ppm pU3O8):
o 4.00m @ 2,925ppm pU3O8
GT 11,700
o 4.25m @ 2,230ppm pU3O8
GT 9,478
o 3.25m @ 1,406ppm pU3O8
GT 4,570
o 2.25m @ 1,717ppm pU3O8
GT 3,863
o 1.25m @ 2,877ppm pU3O8
GT 3,596
o 1.75m @ 1,990ppm pU3O8
GT 3,483
o 3.75m @ 773ppm pU3O8
GT 2,899
o 1.50m @ 1,855ppm pU3O8
GT 2,783
o 4.50m @ 545ppm pU3O8
GT 2,453
o 4.75m @ 506ppm pU3O8
GT 2,404
o 4.75m @ 484ppm pU3O8
GT 2,299
➢ plus 1.75m @ 1,294ppm pU3O8 GT 2,265
o 3.25m @ 689ppm pU3O8
GT 2,239
o 1.75m @ 1,222ppm pU3O8
GT 2,139
o 3.25m @ 655ppm pU3O8
GT 2,129
o 2.50m @ 757ppm pU3O8
GT 1,893
➢ plus 2.00m @ 548ppm pU3O8 GT 1,096
o 3.00m @ 601ppm pU3O8
GT 1,803
(WRM0151 from 122.75m)
(WRM0109 from 120.75m)
(WRM0128 from 123.75m)
(WRM0159 from 121.75m)
(WRM0114 from 124.50m)
(WRM0142 from 120.25m)
(WRM0130 from 123.75m)
(WRM0121 from 120.25m)
(WRM0140 from 103.25m)
(WRM0157 from 122.50m)
(WRM0143 from 123.00m)
(WRM0143 from 128.50m)
(WRM0145 from 121.50m)
(WRM0111 from 122.00m)
(WRM0116 from 121.00m)
(WRM0136 from 120.25m)
(WRM0136 from 126.50m)
(WRM0132 from 125.75m)
Mineralisation is typically hosted within a thick basal sand package within the lower Eyre Formation,
associated directly below a well-defined redox boundary between relatively clean, variably oxidised sands
and more reduced “dirty” sands beneath (Figure 4). These lower sands sit above the underlying basement
and are often coarser grained, with higher proportions of interstitial fine silt and organic material and
occasionally pyrite. Importantly, BMR data obtained throughout the program to date indicates that the
mineralisation at Billeroo should be amenable to ISR mining.
The average uranium grades encountered have largely exceeded expectations, with several “pods” of
high-grade uranium over often significant thicknesses occurring throughout the Billeroo area. Upon
conclusion of the current round of drilling, the average spacing between drill holes and drill lines will be
between ~80-100m which highlights the potential for identifying additional high-grade mineralisation
with further delineation drilling.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Figure 3: Overview of results from the current drilling campaign to date at Billeroo.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Redox boundary
& ore zone
Basement
Figure 4: Example of mineralized zone within lower Eyre Formation at Billeroo (hole WRM0109).
Sunrise area drill results
The Sunrise area is predominantly located within the “Inferred” resource envelope and is located
~800m east of the Gould’s Dam “Indicated” resource. A review of limited historic drilling results
suggested a similar geological setting to the Billeroo area, with well-developed lower Eyre Formation
sands along with uranium mineralisation encountered below a redox boundary within these sands. A
limited number of holes were drilled during the 2023 campaign to try and validate the historic work,
with several very promising intercepts identified (PFN results, ppm pU3O8):
o 3.75m @ 868ppm pU3O8
o 4.00m @ 536ppm pU3O8
o 4.50m @ 440ppm pU3O8
o 5.50m @ 330ppm pU3O8
➢ plus 2.00m @ 639ppm pU3O8
GT 3,255
GT 2,144
GT 1,980
GT 1,815
GT 1,278
(WRM0051 from 116.50m)
(WRM0052 from 116.75m)
(WRM0055 from 118.75m)
(WRM0056 from 122.00m)
(WRM0056 from 102.50m)
The aim of the 2024 drilling campaign at Sunrise was to infill and step out in these promising areas to try
and establish potential continuity of mineralisation and geological/hydrogeological characteristics of the
mineralized zone. Highlights from the latest drilling include (Gamma-derived ppm eU3O8 & PFN-derived
ppm pU3O8):
o 5.25m @ 800ppm pU3O8
o 3.00m @ 756ppm pU3O8
➢ plus 1.25m @ 393ppm pU3O8
o 2.75m @ 432ppm eU3O8
o 1.25m @ 769ppm pU3O8
o 0.50m @ 1,086ppm pU3O8
➢ plus 1.25m @ 720ppm pU3O8
o 0.50m @ 1,340ppm pU3O8
➢ plus 2.25m @ 418ppm pU3O8
o 1.25m @ 478ppm pU3O8
➢ plus 2.50m @ 356ppm pU3O8
GT 4,200
GT 2,268
GT 491
GT 1,188
GT 961
GT 543
GT 900
GT 670
GT 941
GT 598
GT 890
(WRM0099 from 117.00m)
(WRM0084 from 118.50m)
(WRM0084 from 123.50m)
(WRM0091 from 119.25m)
(WRM0082 from 120.75m)
(WRM0076 from 120.75m)
(WRM0076 from 124.25m)
(WRM0096 from 125.00m)
(WRM0096 from 126.75m)
(WRM0077 from 118.75m)
(WRM0077 from 122.25m)
A total of 37 mud rotary holes for 4,831m were completed (Figure 5), with the results suggesting that
economic intercepts tend to be relatively isolated and surrounded by lower grade sub-economic
mineralisation.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Figure 5: Overview of results from the current drilling campaign at Sunrise.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Beulah Target Area
The current drill program is ongoing with the drill rig now due to move north to the Beulah area, where
up to 40 holes are planned to better define the extent of uranium mineralisation and geological
characteristics of this area.
The Beulah target is located ~6.5km north of the Gould’s Dam Indicated Resource within the Billeroo
Palaeovalley and has been subject to sporadic drilling campaigns between the late 1970’s and 2006 (Figure
2). Available geological data from the historic drilling indicates a potentially favourable geological
environment similar to the Billeroo area, with thick lower Eyre Formation sands and uranium
mineralisation associated with a redox boundary developed within these sands. Highlights from historic
drilling in this area includes (PFN-derived pU3O8 & gamma-derived eU3O8):
o 2.25m @ 1,542ppm pU3O8
o 5.25m @ 575ppm pU3O8
o 7.40m @ 349ppm eU3O8
o 1.25m @ 1,725ppm pU3O8
o 7.20m @ 288ppm eU3O8
o 4.10m @ 468ppm eU3O8
GT 3,470
GT 3,019
GT 2,583
GT 2,156
GT 2,074
GT 1,919
(GLD129 from 118.00m)
(GLD142 from 121.25m)
(BW116 from 108.80m)
(GLD149 from 114.50m)
(BW003 from 121.50m)
(BW122A from 123.20m)
Historic drilling within this area is limited and relatively sporadic, therefore the aim of the proposed drilling
program is to complete infill and step out drilling and test several interesting geological targets. Results
of this initial first pass drilling program will then be interpreted to determine the scope for further work
in this area.
Gould’s Dam deposit
The Gould’s Dam deposit is located ~80km northwest of the Honeymoon Mine and currently contains
a JORC-compliant resource (Table 1) of 4.4Mt @ 650ppm U308 for 6.3Mlbs contained U308 (Indicated)
and 17.7Mt @ 480ppm U308for 18.7Mlbs contained U308 (Inferred).
Table 1: Summary of Mineral Resource for satellite deposit of Gould’s Dam
Resource
Classification
Tonnage
(Million Tonnes)
Average Grade
(ppm U3O8)
Contained Metal
(Kt, U3O8)
Contained Metal
(Mlb, U3O8)
Gould’s Dam (April 2016) 1
Indicated
4.4
650
2.9
6.3
Inferred
17.7
480
8.5
18.7
Honeymoon Project Mineral Resource
The global Honeymoon Mineral Resource stands at 71.6Mlbs (52.4Mt) with an average grade of
620ppm U308, using a cut-off grade of 250ppm, as summarised in Table 2.
The current Honeymoon restart feasibility studies utilise only a portion of Honeymoon’s JORC
resource, excluding 36Mlbs of JORC resource outside the HRA, which could expand the mine life, and
Boss’ defined exploration target could potentially extend the mine life beyond the initial 11 years and
increase the production profile. Honeymoon’s Federal EPIP Act approvals allow export of more than
3Mlbs/annum U308 equivalent.
1
Refer to ASX: BOE Announcement dated 8 April 2016
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
In addition to the global Mineral Resource, the Honeymoon Uranium Project also has an Exploration
Target range of 28Mt to 133Mt of mineralisation at a grade of 340ppm to 1,080ppm U308 for a
contained 58Mlbs to 190Mlbs U308 (26,300 to 86,160 tonnes of contained U308), using a cut-off of
250ppm2. Note the potential quantity and grade of the Exploration Target range is conceptual in
nature. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain
whether future exploration will result in the definition of a Mineral Resource.
Table 2: Summary of Mineral Resource for satellite deposits of Gould’s Dam and Jason’s
Resource
Classification
Tonnage
(Million Tonnes)
Average Grade
(ppm U3O8)
Contained Metal
(Kt, U3O8)
Contained Metal
(Mlb, U3O8)
4.9
10.7
Jason’s (March 2017)3
Inferred
6.2
790
Gould’s Dam (April 2016) 4
Indicated
4.4
650
2.9
6.3
Inferred
17.7
480
8.5
18.7
Honeymoon Restart Area (January 2019)
Measured
3.1
1,100
3.4
7.6
Indicated
14
610
8.7
19
Inferred
7.0
590
4.1
9.1
GLOBAL HONEYMOON URANIUM PROJECT
Measured
3.1
1,100
3.4
7.6
Indicated
18.4
630
12.0
25.3
Inferred
30.9
570
18.0
38.5
Total
52.4
620
32.5
71.6
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Duncan Craib
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
2 Refer to ASX: BOE announcement dated 25 March 2019.
3 Refer to ASX: BOE announcement dated 15 March 2017.
4 Refer to ASX: BOE announcement dated 8 April 2016.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Competent Person’s Statement
The information contained in this announcement that relates to exploration results is provided by Mr
Jason Cherry, who is a Member of the Australasian Institute of Geoscientists (AIG). Mr Cherry has
sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration, and to the activity being undertaken to qualify as a Competent Person, as defined in the
JORC 2012 edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr
Cherry has 17 years’ experience and is a full-time employee as Geology Manager for Boss Energy Ltd. Mr
Cherry consents to the inclusion in this report of the matters based on this information in the form and
context in which they appear.
Reference to previous ASX announcements
In relation to the results of the Feasibility Study announced 21 January 2020, the Company confirms that
all material assumptions underpinning the production target and forecast financial information included
in that announcement continue to apply and have not materially changed. Nothing in this announcement
pre-empts the findings of the Enhanced Feasibility Study currently being undertaken.
In relation to the Mineral Resource announced on 8 April 2016, 25 February 2019 and the Exploration
Targets announced on 25 March 2019, the Company confirms that it is not aware of any new information
or data that materially affects the information included in the original market announcement and that all
material assumptions and technical parameters underpinning the estimates in that market
announcement continue to apply and have not materially changed.
Forward-Looking Statements
This announcement includes forward-looking statements. These forward-looking statements are based
on the Company’s expectations and beliefs concerning future events. Forward-looking statements are
necessarily subject to risks, uncertainties, and other factors, many of which are outside the control of Boss
Energy, which could cause actual results to differ materially from such statements. Boss Energy makes no
undertaking to subsequently update or revise the forward-looking statements made in this
announcement, to reflect the circumstances or events after the date of this announcement.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
APPENDIX 1 – Table 1: Historical drill results
In accordance with ASX Listing Rule 5.7.2, the Company provides the following information:
Hole ID
Easting
Northing
MGA94, z54
RL
EOH
From
To
Width
eU3O8
(m)
(m)
(m)
121.54
102.10
108.79
96.44
111.40
118.40
123.10
130.60
120.50
118.00
(m)
128.74
105.10
116.19
96.94
114.30
120.30
127.30
131.70
126.50
120.25
(m)
7.20
3.00
7.40
0.50
2.90
1.90
4.20
1.10
6.00
2.25
(ppm)
288
1,040
349
967
254
1,121
468
261
358
1,542
Grade
Thickness
(m.ppm)
2,074
3,120
2,583
483
737
2186
1,966
287
2,148
3,470
121.25
105.20
114.50
126.50
109.20
115.75
5.25
4.00
1.25
575
380
1,725
3,019
1,520
2,156
BW003
401329
6523464
71
145
BW016
401964
6524019
71
133
BW122A
401396
6524659
70
139
BW123
GLD129 *
401305
401763
6525125
6524085
69
75
139
150
GLD142 *
401929
6524778
75
138
GLD149 *
402442
6523679
73
132
All results reported as gamma-derived eU3O8 in the above table unless otherwise indicated.
* indicates PFN-derived equivalent pU3O8.
Values are reported above the nominal 250ppm eU3O8 cutoff grade, 0.5m minimum interval thickness
and maximum 1m internal dilution.
All holes were drilled vertically (-90˚ inclination and 0˚ azimuth).
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
APPENDIX 1 – Table 2: Current drill results (Billeroo area)
Hole ID
WRM0104
WRM0105
WRM0106
WRM0107
WRM0108
WRM0109
WRM0110
WRM0111
WRM0112
WRM0113
WRM0114
WRM0115
WRM0116
WRM0117
WRM0118
WRM0119
WRM0120
WRM0121
WRM0122
Easting
Northing
RL
EOH
From
To
Width
pU3O8
Grade Thickness
MGA94, z54
400295
6519524
400456
6519603
400537
6519604
plus
400558
6519679
400610
6519680
400496
6519757
plus
400578
6519757
400659
6519760
(m)
75.2
75.4
75.4
(m)
139
139
139
75.2
75.1
74.9
133
139
139
74.9
75.1
139
139
400500
6519844
plus
74.8
139
400598
400662
400743
400504
400507
400671
6519838
6519837
6519842
6519942
6519942
6519943
plus
6520019
6520013
plus
74.8
75.0
75.4
74.8
74.7
75.3
139
139
139
139
139
139
(m)
123.50
107.25
123.00
126.00
126.75
125.50
109.75
120.75
122.00
120.00
124.25
124.50
122.25
121.00
(m)
124.00
107.75
124.50
126.50
127.25
126.25
110.50
125.00
123.75
120.50
124.75
125.75
123.25
124.25
(m)
0.50
0.50
1.50
0.50
0.50
0.75
0.75
4.25
1.75
0.50
0.50
1.25
1.00
3.25
(ppm)
477
637
1,054
325
397
331
1,306
2,230
1,222
1,048
464
2,877
316
655
(m.ppm)
239
319
1,581
163
199
248
980
9,478
2,139
524
232
3,596
316
2,129
74.8
74.4
139
139
123.00
127.50
127.00
122.25
126.00
124.75
128.25
127.75
122.75
127.00
1.75
0.75
0.75
0.50
1.00
537
500
268
1,267
307
940
375
201
634
307
6520028
plus
6520048
plus
6520018
plus
plus
6520019
6520088
plus
6520099
6,520,157
74.4
139
74.4
139
74.7
139
75.1
74.9
139
139
74.8
74.8
139
139
120.25
124.50
121.25
127.50
120.75
123.25
125.50
121.00
123.50
126.25
123.50
121.75
121.75
125.50
123.50
128.00
121.25
123.75
126.50
123.25
125.50
127.25
127.50
122.75
1.50
1.00
2.25
0.50
0.50
0.50
1.00
2.25
2.00
1.00
4.00
1.00
1,855
324
297
312
607
750
545
515
394
1,038
365
668
2,783
324
668
156
304
375
545
1,159
788
1,038
1,460
668
124.25
123.75
127.75
122.50
125.25
123.75
125.75
127.00
129.00
124.75
125.75
127.50
1.50
3.25
1.25
2.25
0.50
3.75
352
1,406
503
361
382
773
528
4,570
629
812
191
2,899
130.75
122.50
125.50
131.50
123.50
126.50
0.75
1.00
1.00
293
694
631
220
694
631
400504
400418
400588
400602
400663
WRM0123
WRM0124
WRM0125
WRM0126
WRM0127
WRM0128
WRM0129
WRM0130
WRM0131
ASX: BOE
400743
400672
400484
400,658
400668
400581
400545
400747
plus
6520192
plus
6520203
plus
6520094
plus
6519943
plus
OTCQX: BQSSF
74.6
139
74.2
139
74.3
139
75.4
139
www.bossenergy.com
@Boss_Energy
Hole ID
WRM0132
WRM0133
WRM0134
WRM0135
WRM0136
WRM0137
WRM0138
WRM0139
WRM0140
WRM0141
WRM0142
WRM0143
WRM0144
WRM0145
WRM0146
WRM0147*
WRM0148
WRM0149
WRM0150
ASX: BOE
Easting
Northing
MGA94, z54
400484
6520210
400,416
6,520,282
plus
plus
400,512
6,520,278
plus
plus
400,612
6,520,278
plus
plus
400712
6520278
plus
400799
6520276
400866
6520275
plus
plus
400934
6520361
401016
6520385
plus
plus
400772
6520364
plus
400669
6520337
plus
400480
6520362
plus
plus
400474
6520445
plus
plus
plus
400622
6520395
plus
400675
6520447
plus
400933
6520443
plus
plus
400806
6520449
plus
400913
6520532
plus
plus
400840
6520531
plus
plus
OTCQX: BQSSF
RL
(m)
74.0
74.3
EOH
(m)
139
139
73.7
139
74.6
139
74.6
139
75.3
75.3
139
139
75.1
75.0
133
139
74.6
139
74.9
139
74.5
139
74.5
139
74.8
139
74.2
139
76.1
139
74.8
139
76.4
139
75.1
139
From
(m)
To
(m)
125.75
106.50
121.75
131.25
121.00
124.50
129.25
120.00
123.75
125.75
120.25
126.50
127.25
120.25
126.75
129.25
128.75
3.00
601
107.50
1.00
719
122.50
0.75
616
131.75
0.50
528
122.00
1.00
1,534
125.75
1.25
376
129.75
0.50
430
120.75
0.75
367
124.75
1.00
634
126.25
0.50
608
122.75
2.50
757
128.50
2.00
548
127.75
0.50
1,361
121.25
1.00
638
127.50
0.75
2,681
129.75
0.50
317
Hole collapsed - no logs obtained
107.75
4.50
545
126.00
0.50
361
131.00
1.75
275
124.25
2.50
295
128.75
3.25
516
122.00
1.75
1,990
125.50
0.50
294
122.25
1.00
480
127.75
4.75
484
130.25
1.75
1,294
107.25
2.25
329
125.25
3.75
373
129.25
2.75
280
132.75
2.25
298
124.75
3.25
689
129.00
1.00
668
108.75
0.50
390
125.50
1.25
497
123.75
1.25
890
129.00
2.50
337
131.75
0.75
1,052
107.00
0.50
290
124.50
1.75
400
108.25
0.50
357
123.25
1.50
483
133.00
1.25
369
125.25
0.50
916
129.25
1.25
606
133.00
0.50
347
103.25
125.50
129.25
121.75
125.50
120.25
125.00
121.25
123.00
128.50
105.00
121.50
126.50
130.50
121.50
128.00
108.25
124.25
122.50
126.50
131.00
106.50
122.75
107.75
121.75
131.75
124.75
128.00
132.50
www.bossenergy.com
Width
(m)
pU3O8
(ppm)
Grade Thickness
(m.ppm)
1,803
719
462
264
1,534
470
215
275
634
304
1,893
1,096
681
638
2,011
159
2,453
181
481
738
1,677
3,483
147
480
2,299
2,265
740
1,399
770
671
2,239
668
195
621
1,113
843
789
145
700
179
725
461
458
758
174
@Boss_Energy
Hole ID
WRM0151
WRM0152
WRM0153
WRM0154
WRM0155
WRM0156
WRM0157
WRM0158
WRM0159
WRM0160
WRM0161
WRM0162
Easting
Northing
MGA94, z54
400997
6520634
plus
401054
6520702
401156
6520635
plus
400886
6520636
plus
plus
400754
6520672
plus
plus
400482
6520528
400566
6520522
400767
6520221
400929
6520314
400675
6520447
400429
6519935
400409
6519775
RL
(m)
75.7
EOH
(m)
139
76.3
75.7
30
139
75.0
139
74.0
139
74.2
74.7
74.2
74.4
74.2
74.8
74.9
139
139
139
139
139
139
139
From
(m)
122.75
131.25
112.25
128.25
109.75
123.50
130.00
109.25
128.25
130.75
123.25
122.50
125.00
121.75
128.00
118.00
-
To
Width
pU3O8 Grade Thickness
(m)
(m)
(ppm)
(m.ppm)
126.75
4.00
2,925
11,700
132.25
1.00
276
276
Hole collapsed - no logs obtained
113.00
0.75
334
251
129.25
1.00
986
986
110.50
0.75
402
302
125.25
1.75
326
571
130.50
0.50
355
178
110.50
1.25
296
370
129.25
1.00
311
311
131.25
0.50
304
152
124.25
1.00
746
746
127.25
4.75
506
2,404
126.50
1.50
327
491
124.00
2.25
1,717
3,863
128.50
0.50
563
282
120.00
2.00
519
1,038
-
Values are reported above the nominal 250ppm pU3O8 cutoff grade, 0.5m minimum interval thickness
and maximum 1m internal dilution. All results reported as PFN-derived pU3O8 in the above table unless
otherwise indicated.
All holes were drilled vertically (-90˚ inclination and 0˚ azimuth).
* Denotes drill hole result reported as calibrated gamma derived equivalent U3O8 (eU3O8).
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
APPENDIX 1 – Table 3: Current drill results (Sunrise area)
Hole ID
WRM0068
WRM0069
WRM0070
WRM0171
WRM0072
WRM0073
WRM0074
WRM0075
WRM0076
WRM0077
WRM0078
WRM0079
WRM0080
WRM0081
WRM0082
WRM0083
WRM0084
WRM0085
WRM0086
WRM0087
WRM0088
WRM0089
WRM0090
WRM0091*
WRM0092
WRM0093
WRM0094
WRM0095R
WRM0096
ASX: BOE
Easting
Northing
MGA94, z54
401317
6516916
plus
401316
6516839
401361
6516720
plus
401238
6516718
plus
401233
6516837
401151
6516838
401152
6516995
401236
6516994
401320
6516996
plus
401323
6517110
plus
401156
6517110
401037
6517109
400916
6517110
400797
6517110
plus
401239
6517188
401160
6517190
plus
plus
plus
401098
6517312
plus
401327
6517480
401327
6517602
401246
6517563
401162
6517563
401070
6517565
400917
6517564
plus
400764
6517564
400683.1 6517621.9
plus
400600.9 6517563.5
plus
400522.5 6517565.5
plus
400674
6517499.8
400679
6517369
plus
OTCQX: BQSSF
RL
(m)
81.3
EOH
(m)
133
81.4
80.7
137
131
81.3
137
81.1
80.9
80.4
81.0
81.2
138
83
137
138
137
80.7
137
80.1
80.0
80.3
79.9
137
138
138
137
80.4
80.2
131
137
79.3
137
79.0
78.7
78.3
78.3
78.4
78.5
131
131
131
131
84
138
78.8
78.6
138
133
78.6
133
78.3
133
78.9
79.1
139
139
From
(m)
120.25
125.25
125.00
103.50
123.75
121.00
123.25
126.00
123.75
121.75
120.75
124.25
118.75
122.25
119.25
125.25
102.00
123.75
120.75
115.00
118.00
121.25
124.50
118.50
123.50
102.00
116.25
119.25
117.25
120.50
118.50
121.50
103.75
125.00
113.00
120.00
125.00
To
Width
pU3O8 Grade Thickness
(m)
(m)
(ppm)
(m.ppm)
121.50
1.25
522
653
125.75
0.50
377
189
126.00
1.00
381
381
104.00
0.50
481
241
124.25
0.50
712
356
121.50
0.50
1,089
545
123.75
0.50
717
359
126.50
0.50
523
262
Hole collapsed - no logs obtained
125.25
1.50
258
387
123.00
1.25
429
536
121.25
0.50
1,086
543
125.50
1.25
720
900
120.00
1.25
478
598
124.75
2.50
356
890
119.75
0.50
1,230
615
Hole collapsed - no logs obtained
125.75
0.50
423
212
102.50
0.50
386
193
124.50
0.75
327
245
122.00
1.25
769
961
115.75
0.75
366
275
119.00
1.00
296
296
122.50
1.25
270
338
125.00
0.50
339
170
121.50
3.00
756
2,268
124.75
1.25
393
491
Hole collapsed - no logs obtained
Hole collapsed - no logs obtained
102.75
0.75
251
188
117.00
0.75
258
194
122.00
2.75
432
1,188
119.25
2.00
409
818
121.00
0.50
444
222
119.50
1.00
808
808
122.50
1.00
420
420
104.50
0.75
649
487
125.50
0.50
992
496
114.25
1.25
384
480
120.75
0.75
394
296
125.50
0.50
1,340
670
www.bossenergy.com
@Boss_Energy
Hole ID
WRM0097
WRM0098
WRM0099
WRM0100
WRM0101
WRM0102
WRM0103
Easting
Northing
MGA94, z54
plus
400764.7 6517309.4
plus
plus
400846.3 6517310.6
plus
400684.2 6517227.8
plus
400604.4 6517309.4
400846
6517431
plus
plus
400765
6517430
400598
6517431
RL
(m)
EOH
(m)
79.5
139
79.4
139
79.8
139
79.0
78.8
139
139
78.7
78.9
139
139
From
(m)
126.75
118.50
120.50
123.00
118.25
125.00
117.00
126.00
101.50
121.25
125.25
128.25
To
(m)
129.00
119.25
121.00
123.50
119.75
125.50
122.25
126.50
102.00
121.75
125.75
128.75
Width
(m)
2.25
0.75
0.50
0.50
1.50
0.50
5.25
0.50
0.50
0.50
0.50
0.50
pU3O8
(ppm)
418
698
500
339
529
315
800
379
816
445
494
473
Grade Thickness
(m.ppm)
941
524
250
170
794
158
4,200
190
408
223
247
237
Values are reported above the nominal 250ppm pU3O8 cutoff grade, 0.5m minimum interval thickness
and maximum 1m internal dilution. All results reported as PFN-derived pU3O8 in the above table unless
otherwise indicated.
All holes were drilled vertically (-90˚ inclination and 0˚ azimuth).
* Denotes drill hole result reported as calibrated gamma derived equivalent U3O8 (eU3O8).
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
JORC Code, 2012 Edition – Table 1
Section 1 – Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.
• The latest WRM series drill holes have been geophysically logged upon
completion with a combination of Prompt Fission Neutron (PFN), Borehole
Magnetic Resonance (BMR), calibrated gamma and induction tools. Data is
collected at 1cm intervals and incorporated in the Boss Energy drilling
database.
• The GLD series holes were drilled in during 2005 – 2006 by Uranium One
Australia. Drill holes were logged Prompt Fission Neutron (PFN) where
available, along with calibrated gamma and induction tools. Data was
collected at 1cm and 5cm intervals.
• Historic uranium grade data from the BW series drilling (completed in the
1970’s and early 1980’s) was digitised from paper logs by Southern Cross
Resources.
• All natural gamma and Prompt Fission Neutron (PFN) tools used during the
current drilling program were calibrated at the PIRSA calibration facility in
Adelaide prior to the program commencing.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
Share your feedback
Discover