Strong drilling results support Honeymoon growth strategy
Released
Released
Announcement PDF
ASX Release 23 January 2024
Honeymoon Uranium Project, South Australia
More strong drilling results highlight scope for
growth in production, mine life and cashflow
The latest exploration results from the Jason’s deposit support Boss’ strategy to leverage
the Honeymoon infrastructure and increase exposure to the strong uranium market
Highlights
•
The Jason’s deposit is located ~13km north of the Honeymoon mine and contains a JORC
Resource 6.2Mt at 790ppm U308 for 10.7Mlbs contained U308 (Inferred).
•
The latest drilling program has returned strong assays including:
o 3.00m @ 3,221ppm pU3O8
o 6.00m @ 1,278ppm pU3O8
o 3.25m @ 1,509ppm pU3O8
plus 2.75m @ 475ppm pU3O8
o 4.50m @ 1,010ppm pU3O8
plus 1.75m @ 670ppm pU3O8
o 2.75m @ 1,439ppm pU3O8
o 1.25m @ 3,092ppm pU3O8
o 4.25m @ 801ppm pU3O8
o 2.75m @ 1,128ppm pU3O8
plus 3.00m @ 679ppm pU3O8
plus 3.50m @ 551ppm pU3O8
o 3.00m @ 889ppm pU3O8
1
GT 9,663
GT 7,668
GT 4,904
GT 1,306
GT 4,545
GT 1,173
GT 3,957
GT 3,865
GT 3,404
GT 3,102
GT 2,037
GT 1,929
GT 2,667
(BMR183 from 105.50m)
(BMR176 from 100.50m)
(BMR186 from 104.50m)
(BMR186 from 85.50m)
(BMR191 from 108.25m)
(BMR191 from 90.25m)
(BMR185 from 102.50m)
(BMR171 from 108.50m)
(BMR188 from 106.25m)
(BMR179 from 95.25m)
(BMR179 from 99.75m)
(BMR179 from 89.75m)
(BMR184 from 103.00m)
•
Study to commence on increasing the forecast production rate to more than 3Mlb/annum U308
equivalent (from 2.45Mlb nameplate capacity) or an extension of mine life
•
Jason’s, along with the known satellite deposits of Gould’s Dam, Billeroo and Sunrise, are
included in this study
•
These results will be used to update the satellite geological models in 1H 2024, which will then
feed into a Resource update 2H 2024. This work will form the basis of further step-out and infill
drilling leading to potential Resource upgrade in 2025
•
Boss’ exploration strategy has already been highly successful, increasing the JORC Resource at
Honeymoon from 16.57Mlbs to 71.67Mlbs (~4.3x increase) since project acquisition in
December 2015 1
•
The current life-of-mine plan at Honeymoon is based on just 50% of the existing JORC Resource
Refer to ASX: BOE announcement dated 25 February 2019. Refer Appendix 1 for Honeymoon JORC 2012 Resource.
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Duncan Craib - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Paul Armstrong – Public Relations
+61 (08) 9388 1474
www.bossenergy.com
@Boss_Energy
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) is pleased to announce strong results from drilling at the
Jason’s deposit, located ~13km north of the Honeymoon Mine (Figure 1).
Boss Managing Director Duncan Craib said: “We have a twin-pronged strategy at Honeymoon to drive
shareholder value by successfully ramping up production while increasing the inventory in preparation
for our next round of growth.
“This is aimed at generating strong cashflow while laying the foundations for increases in Honeymoon’s
production, which will in turn drive further growth in cashflow while also enabling us to leverage existing
infrastructure.
“These latest drilling results provide more evidence that the Jason’s deposit can play an important role in
that growth strategy and help Boss increase its exposure to the uranium market as it continues to benefit
from the highly favourable supply and demand fundamentals”.
Figure 1: Location of the Jason’s satellite deposit.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Infill drilling Program
The completed Jason’s drilling program was designed to provide important geological and hydrogeological
information for the Eyre Formation sediments that host the uranium mineralisation, along with infill and
step-out coverage designed to establish continuity of mineralisation in key portions of the deposit.
The mud rotary drilling program commenced in mid-November and was completed in mid-December and
comprised a total of 38 holes for 4,175m. Holes were logged with Prompt Fission Neutron (PFN) by Boss
Energy, along with a combination of Borehole Magnetic Resonance (BMR), neutron porosity, formation
density and induction geophysical tools.
The program concentrated on the southeastern section of the deposit, where uranium mineralisation is
predominantly associated with sands of the lower Eyre Formation. Drilling demonstrated that uranium
mineralisation is continuous within the lower Eyre Formation along a strike length of ~1,000m (Figure 2),
which is still open to the southeast and southwest. Ore zone grade and thickness tends to vary along
strike, with several strongly mineralised “pods” within the lower Eyre Formation that are predominantly
hosted within lithologies that would be amenable to In-Situ Recovery (ISR) mining.
Highlights of new mineralisation encountered from the recent drilling include (pU3O8 = PFN derived, eU3O8
= gamma-derived):
o 2.75m @ 741ppm pU3O8
o 1.25m @ 3,092ppm pU3O8
o 2.75m @ 1,128ppm pU3O8
plus 3.00m @ 679ppm pU3O8
plus 3.50m @ 551ppm pU3O8
o 3.00m @ 889ppm eU3O8
o 2.75m @ 1,439ppm pU3O8
o 3.25m @ 1,509ppm pU3O8
o 4.50m @ 1,010ppm pU3O8
o 2.25m @ 963ppm pU3O8
ASX: BOE
OTCQX: BQSSF
GT 2,038
GT 3,865
GT 3,102
GT 2,037
GT 1,929
GT 2,667
GT 3,957
GT 4,904
GT 4,545
GT 2,167
(BMR170 from 84.25m)
(BMR171 from 108.50m)
(BMR179 from 95.25m)
(BMR179 from 99.75m)
(BMR179 from 89.75m)
(BMR184 from 103.00m)
(BMR185 from 102.50m)
(BMR186 from 104.50m)
(BMR191 from 108.25m)
(BMR192 from 106.75m)
www.bossenergy.com
@Boss_Energy
Figure 2: Highlights of latest drilling results at the Jason’s deposit.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Twin hole drilling
Six holes from previous drilling campaigns at Jason’s were also twinned to obtain detailed hydrogeological
information and to confirm uranium grades via BMR, PFN, and calibrated gamma logging. In this respect,
three holes from the 2017 drill campaign were twinned (BMW001, BMR043 and BMR050), along with
historic holes YAM040 (drilled by Southern Cross Resources in 2004), MTC131 (drilled by MinAd Teton in
1977) and 580_018 (drilled by Sedimentary Uranium NL in 1972). Historical intercepts from these holes
are presented below (pU3O8 = PFN derived, eU3O8 = gamma-derived):
GT 8,856
o 2.00m @ 4,428ppm pU3O8
plus 1.00m @ 1,610ppm pU3O8 GT 1,610
plus 1.75m @ 471ppm pU3O8 GT 824
o 4.00m @ 1,611ppm pU3O8
GT 6,444
plus 1.75m @ 523ppm pU3O8 GT 915
plus 1.25m @ 623ppm pU3O8 GT 779
o 5.50m @ 943ppm pU3O8
GT 5,186
plus 1.75m @ 335ppm pU3O8 GT 587
o 3.75m @ 2,473ppm pU3O8
GT 9,272
plus 3.50m @ 920ppm pU3O8 GT 3,220
plus 2.75m @ 833ppm pU3O8 GT 2,290
o 1.50m @ 1,457ppm eU3O8
GT 2,185
plus 0.50m @ 967ppm eU3O8 GT 483
o 3.00m @ 1,040ppm eU3O8
GT 3,120
plus 0.60m @ 700ppm eU3O8 GT 420
(BMR043 from 105.50m)
(BMR043 from 86.50m)
(BMR043 from 95.75m)
(BMW001 from 101.50m)
(BMW001 from 96.25m)
(BMW001 from 89.25m)
(BMR050 from 104.75m)
(BMR050 from 94.00m)
(YAM040 from 105.75m)
(YAM040 from 92.75m)
(YAM040 from 101.00m)
(MTC131 from 88.69m)
(MTC131 from 96.44m)
(580_018 from 102.10m)
(580_018 from 92.90m)
Results from the 2023 twin drilling campaign predominantly confirmed both the historical grade
intercepts and provided confirmation of suitable host lithologies for ISR mining. The exceptions were
BMR157 (twin of MTC131) and BMR177 (twin of YAM040). BMR194 unfortunately had to be abandoned
due to lost circulation & hole collapse. A summary of the twin drilling results is presented below (PFN
derived pU3O8):
BMR183 (twin of BMR043):
o 3.00m @ 3,221ppm pU3O8
plus 4.00m @ 372ppm pU3O8
plus 1.00m @ 994ppm pU3O8
plus 1.75m @ 541ppm pU3O8
GT 9,663
GT 1,488
GT 994
GT 947
(from 105.50m)
(from 95.25m)
(from 86.50m)
(from 109.50m)
o 6.00m @ 1,278ppm pU3O8
GT 7,668
plus 1.50m @ 1,440ppm pU3O8 GT 2,160
plus 2.75m @ 669ppm pU3O8 GT 1,840
(from 100.50m)
(from 90.00m)
(from 96.25m)
BMR176 (twin of BMW001):
BMR188 (twin of BMR050):
o 4.25m @ 801ppm pU3O8
plus 1.75m @ 397ppm pU3O8
plus 1.50m @ 407ppm pU3O8
ASX: BOE
OTCQX: BQSSF
GT 3,404
GT 695
GT 611
(from 106.25m)
(from 79.75m)
(from 95.00m)
www.bossenergy.com
@Boss_Energy
BMR177 (twin of YAM040):
o 0.75m @ 1,852ppm pU3O8
GT 1,389
plus 2.00m @ 598ppm pU3O8 GT 1,196
plus 0.75m @ 1,253ppm pU3O8 GT 940
plus 0.75m @ 442ppm pU3O8 GT 332
(from 91.00m)
(from 100.50m)
(from 107.50m)
(from 87.50m)
BMR157 (twin of MTC131):
o 1.00m @ 915ppm pU3O8
plus 0.75m @ 697ppm pU3O8
GT 915
GT 523
(from 83.75m)
(from 96.75m)
Next steps
Data from the recently completed drilling campaign will be used to update the geological model in 1H
2024 for the Jason’s deposit, which will then feed into an updated resource update in 2H 2024. This work
will form the basis for further step-out and infill drilling in the Jason’s region.
Jason’s deposit
The Jason’s deposit is located ~13km north of the Honeymoon Mine and currently contains a JORCcompliant resource (Table 1) 6.2Mt at 790ppm U308 for 10.7Mlbs contained U308 (Inferred).
Table 1: Summary of Mineral Resource for the Jason’s satellite deposit
Resource
Classification
Tonnage
(Million Tonnes)
Average Grade
(ppm U3O8)
Contained Metal
(Kt, U3O8)
Contained Metal
(Mlb, U3O8)
Jason’s deposit (March 2017) 2
Inferred
6.2
790
4.9
10.7
Honeymoon Project Mineral Resource
The global Honeymoon Mineral Resource stands at 71.6 Mlb (52.4Mt) with an average grade of 620ppm
U308, using a cut-off grade of 250ppm, as summarised in Table 2.
The current Honeymoon restart feasibility studies utilise only a portion of Honeymoon’s JORC resource,
excluding 36Mlb of JORC resource outside the HRA, which could expand the mine life, and Boss’ defined
exploration target could potentially extend the mine life beyond the initial 11 years and increase the
production profile. Honeymoon’s Federal EPIP Act approvals allow export of more than 3Mlbs/annum
U308 equivalent.
In addition to the global Mineral Resource, the Honeymoon Uranium Project also has an Exploration
Target range of 28 Mt to 133 Mt of mineralisation at a grade of 340 ppm to 1,080 ppm U308 for a contained
58 Mlbs to 190 Mlbs U308 (26,300 to 86,160 tonnes of contained U308), using a cut-off of 250ppm 3. Note
the potential quantity and grade of the Exploration Target range is conceptual in nature. There has been
insufficient exploration to estimate a Mineral Resource and it is uncertain whether future exploration will
result in the definition of a Mineral Resource.
2 Refer to ASX: BOE announcement dated 15 March 2017.
3 Refer to ASX: BOE announcement dated 25 March 2019.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Table 2: Summary of Mineral Resource for satellite deposits of Gould’s Dam and Jason’s
Resource
Classification
Tonnage
(Million Tonnes)
Average Grade
(ppm U3O8)
Contained Metal
(Kt, U3O8)
Contained Metal
(Mlb, U3O8)
4.9
10.7
Jason’s (March 2017) 4
Inferred
6.2
790
Gould’s Dam (April 2016) 5
Indicated
4.4
650
2.9
6.3
Inferred
17.7
480
8.5
18.7
Honeymoon Restart Area (January 2019)
Measured
3.1
1,100
3.4
7.6
Indicated
14
610
8.7
19
Inferred
7.0
590
4.1
9.1
GLOBAL HONEYMOON URANIUM PROJECT
Measured
3.1
1,100
3.4
7.6
Indicated
18.4
630
12.0
25.3
Inferred
30.9
570
18.0
38.5
Total
52.4
620
32.5
71.6
About Boss Energy
Honeymoon is on track for first drum of produced uranium in the March quarter, 2024. The mine is
increasing the production profile to 2.45 Mlb/annum over a plus-10 year mine life but utilising only 36Mlbs
of the Project’s global JORC Resource of 71.6Mlbs. This means there is substantial scope to extend the
mine life and increase the EFS production nameplate capacity of 2.45Mlb/annum from the remaining
identified JORC Resource. There are also significant resource growth opportunities from the Company’s
satellite deposits and significant defined Exploration Target 6.
The Company anticipates the satellite resources to allow both an increase in the overall production profile
with minimal disturbance to operations and extend the mine life of the Honeymoon Project. Boss holds
high expectations that its exploration activities will continue to deliver increase Resources. The Company
has grown the global JORC resource from 16.6Mlbs to 71.6Mlbs (~4.3x increase) since acquiring
Honeymoon in December 2015.
4 Refer to ASX: BOE announcement dated 15 March 2017.
5 Refer to ASX: BOE announcement dated 8 April 2016.
6 Refer to ASX: BOE announcement dated 25 March 2019.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Duncan Craib
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
Competent Person’s Statement
The information contained in this announcement that relates to exploration results is provided by Mr
Jason Cherry, who is a Member of the Australasian Institute of Geoscientists (AIG). Mr Cherry has
sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration, and to the activity being undertaken to qualify as a Competent Person, as defined in the
JORC 2012 edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr
Cherry has 17 years’ experience and is a full-time employee as Geology Manager for Boss Energy Ltd. Mr
Cherry consents to the inclusion in this report of the matters based on this information in the form and
context in which they appear.
Reference to previous ASX announcements
In relation to the results of the Feasibility Study announced 21 January 2020, the Company confirms that
all material assumptions underpinning the production target and forecast financial information included
in that announcement continue to apply and have not materially changed. Nothing in this announcement
pre-empts the findings of the Enhanced Feasibility Study currently being undertaken.
In relation to the Mineral Resource announced on 8 April 2016, 25 February 2019 and the Exploration
Targets announced on 25 March 2019, the Company confirms that it is not aware of any new information
or data that materially affects the information included in the original market announcement and that all
material assumptions and technical parameters underpinning the estimates in that market
announcement continue to apply and have not materially changed.
Forward-Looking Statements
This announcement includes forward-looking statements. These forward-looking statements are based
on the Company’s expectations and beliefs concerning future events. Forward-looking statements are
necessarily subject to risks, uncertainties, and other factors, many of which are outside the control of Boss
Energy, which could cause actual results to differ materially from such statements. Boss Energy makes no
undertaking to subsequently update or revise the forward-looking statements made in this
announcement, to reflect the circumstances or events after the date of this announcement.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
APPENDIX 1 – Table 1: Historical drill results
In accordance with ASX Listing Rule 5.7.2, the Company provides the following information:
Table 1: Summary of historical drill holes listed within this report.
All holes were drilled vertically (-90˚ inclination and 0˚ azimuth).
Hole ID
Easting
Northing
MGA94, z54
RL
EOH
From
To
Width
pU3O8
(m)
(m)
(m)
92.90
102.10
88.69
96.44
92.75
101.00
(m)
93.50
105.10
90.19
96.94
96.25
103.75
(m)
0.60
3.00
1.50
0.50
3.50
2.75
(ppm)
700
1,040
1,457
967
920
833
Grade
Thickness
(m.ppm)
420
3,120
2,185
483
3,220
2,290
105.75
89.25
96.25
101.5
94.00
104.75
109.50
90.50
98.00
105.5
95.75
110.25
3.75
1.25
1.75
4.00
1.75
5.50
2,473
623
523
1,611
335
943
9,272
779
915
6,444
587
5,186
86.50
95.75
105.50
87.50
97.50
107.50
1.00
1.75
2.00
1,610
471
4,428
1,610
824
8,856
580_018 *
467,531
6,500,114
97
112
MTC131 *
465,953
6,501,615
95
111
YAM040
467,592
6,500,808
96
128
BMW001
467,544
6,500,777
96
115
BMR050
467,993
6,500,364
96
114
BMR043
467,738
6,500,637
96
114
All results reported as PFN-derived pU3O8 in the above table unless otherwise indicated.
* indicates gamma-derived equivalent eU3O8.
Values are reported above the nominal 250ppm eU3O8 cutoff grade, 0.5m minimum interval thickness and
maximum 1m internal dilution.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Table 2: Summary of new drilling results from the 2023 program.
All holes were drilled vertically (-90˚ inclination and 0˚ azimuth).
Hole ID
Easting
RL
EOH
From
To
Width
Avg
pU3O8
Grade
Thickness
(m)
(m)
(m)
(m)
(m)
(ppm)
(m.ppm)
6,501,615
plus
6,501,472
plus
plus
6,501,995
93
115
94
114
83.75
96.75
86.00
89.75
94.50
93
60
6,502,050
plus
6,502,079
6,502,078
6,501,803
6,501,901
92
114
93
93
92
93
120
114
115
115
6,502,162
plus
6,501,998
6,501,474
plus
6,500,935
93
115
93
95
114
115
95
115
6,500,794
plus
plus
6,500,980
plus
6,501,269
plus
95
115
94
115
93
115
Northing
MGA94, z54
BMR157
465,948
466,082
BMR158
BMR159
BMR160
BMR161
BMR162
BMR163
BMR164
BMR165
BMR166
BMR167 *
BMR168
466,302
466,449
466,532
466,656
466,804
466,898
466,502
466,300
466,202
466,080
467,051
BMR169
BMR170
467,112
467,153
BMR171
BMR172
467,462
467,375
BMR173
467,379
BMR174
467,464
BMR175
467,546
BMR176
ASX: BOE
OTCQX: BQSSF
plus
plus
plus
6,501,388
6,500,882
plus
plus
6,500,706
plus
plus
6,500,668
plus
plus
6,500,781
plus
plus
115
115
94
112
94
111
114
93.75
100.50
90.25
106.00
94
94
95
94.25
99.25
84.75
1.00
915
915
97.50
0.75
697
523
88.00
2.00
320
640
91.50
1.75
350
613
96.25
1.75
502
879
Hole abandoned due to lost circulation
95.00
0.75
353
99.75
0.50
750
No significant intercepts
94.75
1.00
2,816
102.25
1.75
953
No significant intercepts
265
375
2,816
1,668
91.75
1.50
852
108.75
2.75
534
No uranium grade data available
90.75
1.25
780
96.25
0.50
662
No significant intercepts
1,278
1,469
79.00
88.50
103.75
84.00
89.75
77.00
81.00
80.50
89.75
104.75
86.75
90.50
78.50
82.00
1.50
1.25
1.00
2.75
0.75
1.50
1.00
332
789
287
741
1,417
289
392
498
986
287
2,038
1,063
434
392
88.00
95.25
108.50
88.50
85.00
86.75
91.00
96.50
109.75
89.25
85.50
88.25
3.00
1.25
1.25
0.75
0.50
1.50
346
286
3,092
387
1,127
1,273
1,038
358
3,865
290
564
1,910
94.75
82.00
86.00
95.50
87.50
94.00
96.00
82.50
87.50
97.00
88.50
94.75
1.25
0.50
1.50
1.50
1.00
0.75
486
640
578
363
367
313
608
320
867
545
367
235
99.50
76.50
90.00
96.25
100.25
78.25
91.50
99.00
0.75
1.75
1.50
2.75
349
266
1,440
669
262
466
2,160
1,840
89.50
95.75
www.bossenergy.com
975
331
@Boss_Energy
Hole ID
Easting
Northing
MGA94, z54
467,578
BMR177
467,529
BMR178
467,471
BMR179
467,675
BMR180 *
467,633
BMR181
467,593
BMR182 *
467,740
BMR183
BMR184 *
467,806
467,752
BMR185
BMR186
BMR187
467,915
467,938
467,993
BMR188
468,040
BMR189
BMR190
BMR191
ASX: BOE
468,126
468,292
OTCQX: BQSSF
plus
6,500,804
plus
plus
plus
6,500,886
plus
plus
plus
6,500,828
plus
plus
6,500,754
plus
plus
plus
6,500,678
plus
plus
plus
6,500,613
plus
plus
RL
EOH
From
To
Width
Avg
pU3O8
Grade
Thickness
(m)
(m)
(m)
(m)
(m)
(ppm)
(m.ppm)
100.50
87.50
91.00
100.50
107.50
106.50
88.25
91.75
102.50
108.25
6.00
0.75
0.75
2.00
0.75
1,278
442
1,852
598
1,253
7,668
332
1,389
1,196
940
78.00
94.25
100.00
104.00
89.75
95.25
79.75
96.25
100.75
107.25
93.25
98.00
1.75
2.00
0.75
3.25
3.50
2.75
381
710
561
532
551
1,128
667
1,420
421
1,729
1,929
3,102
99.75
83.75
91.25
93.75
102.75
80.50
102.75
85.25
92.50
95.25
107.00
81.25
3.00
1.50
1.25
1.50
4.25
0.75
679
1,492
1,594
547
353
474
2,037
2,238
1,993
821
1,500
356
87.50
95.50
106.25
79.50
86.75
104.50
88.50
98.75
107.75
81.75
88.00
106.75
1.00
3.25
1.50
2.25
1.25
2.25
688
272
775
454
1,940
473
688
884
1,163
1,022
2,425
1,064
86.50
95.25
105.50
109.50
94.50
103.00
87.50
99.25
108.50
111.25
96.00
106.00
1.00
4.00
3.00
1.75
1.50
3.00
994
372
3,221
541
499
889
994
1,488
9,663
947
749
2,667
79.50
93.25
102.50
85.50
104.50
104.50
80.50
94.75
105.25
88.25
107.75
105.75
1.00
1.50
2.75
2.75
3.25
1.25
274
417
1,439
475
1,509
1,074
274
626
3,957
1,306
4,904
1,343
79.75
95.00
106.25
88.25
94.00
110.50
81.50
96.50
110.50
91.75
96.50
111.75
1.75
1.50
4.25
3.50
2.50
1.25
397
407
801
466
306
515
695
611
3,404
1,631
765
644
94
115
96
115
95
115
95
115
95
115
95
115
6,500,635
plus
plus
plus
6,500,548
plus
94
115
95
115
6,500,453
plus
plus
6,500,378
plus
6,500,427
95
112
95
115
95
115
6,500,362
plus
plus
6,500,277
plus
plus
94
115
96
115
6,500,256
6,500,276
95
97
64
115
Hole abandoned due to lost circulation
90.25
92.00
1.75
670
1,173
www.bossenergy.com
@Boss_Energy
Hole ID
Easting
Northing
MGA94, z54
EOH
From
To
Width
Avg
pU3O8
Grade
Thickness
(m)
(m)
(m)
(m)
(m)
(ppm)
(m.ppm)
105.50
108.25
86.75
96.25
106.75
106.75
112.75
88.00
97.00
109.00
1.25
4.50
1.25
0.75
2.25
360
1,010
465
301
963
450
4,545
581
226
2,167
468,024
plus
plus
6,500,148
plus
plus
95
115
468,142
467,532
6,500,128
6,500,120
96
95
115
36
BMR192
BMR193
BMR194
RL
94.25
96.00
1.75
392
686
Hole abandoned due to lost circulation
All results reported as PFN-derived pU3O8 in the above table unless otherwise indicated.
* indicates gamma-derived equivalent eU3O8.
Values are reported above the nominal 250ppm eU3O8 cutoff grade, 0.5m minimum interval thickness and
maximum 1m internal dilution.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
JORC Code, 2012 Edition – Table 1
Section 1 – Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may warrant
disclosure of detailed information.
• Historic uranium grade data from the 580 and MTC series drill holes
(completed during the 1970’s by Sedimentary Uranium N.L and MinAd Teton
Australia respectively) was digitised from paper logs by Southern Cross
Resources.
• The YAM series drill holes were completed by Southern Cross Resources in
2004 have been geophysically logged upon completion with a combination of
Prompt Fission Neutron (PFN), calibrated gamma, conductivity & guard tool.
Data is collected at 1cm intervals and incorporated in the Boss Energy drilling
database.
• The first round of BMR series (up to BMR091) and the BMW series holes were
completed by Boss Resources in 2016 and geophysically logged with PFN,
calibrated gamma, formation density, induction and dual laterolog tools by
external contractor Borehole Wireline. The recent BMR series holes
completed at Jason’s (BMR157 – BMR194) have been logged with PFN by
Boss Energy, along with a combination of Borehole Magnetic Resonance
(BMR), Neutron, Formation Density and Induction tools by external
contractor Borehole Wireline. Data was collected at 1cm intervals and
incorporated into the Boss Energy database.
• All natural gamma and PFN tools used during the most recent drilling program
were calibrated at the PIRSA calibration facility in Adelaide prior to the
program commencing.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core
is oriented and if so, by what method, etc).
• The drilling technique used for the recent BMR series holes was mud rotary,
with highly experienced drill contractor Watson Drilling carrying out the work.
Drill cuttings were collected at 1m intervals for geological logging.
• Given the historic nature of the 580 and MTC series drill holes, it is not
possible to provide further drilling details.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries and
results assessed.
• Measures taken to maximise sample recovery and ensure representative
nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
• Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/secondhalf sampling.
• Whether sample sizes are appropriate to the grain size of the material being
sampled.
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.
• Drill chips for the YAM, BMR and BMW series holes were collected and
photographed for geological logging purposes only, with good to very good
sample recoveries.
• Given the historic nature of the 580 and MTC series drill holes, it is not
possible to provide further comment on sample recoveries.
Logging
Sub-sampling
techniques and
sample
preparation
Quality of
assay data and
laboratory
tests
ASX: BOE
OTCQX: BQSSF
• All drill holes have been geologically logged and incorporated into the Boss
Energy database.
• The PFN tool has a depth of investigation radius of approximately 25-40 cm
around the borehole. This provides an accurate measurement of
epithermal/thermal neutron ratios for the calculation of pU3O8.
• No chemical assay sampling was carried out for the drill holes in question.
• Given the historic nature of the 580 and MTC series holes, it is not possible to
comment on the gamma logging carried out at the time.
• All PFN and gamma tools being used as part of the current drilling campaign
have been calibrated at the PIRSA calibration facility in Adelaide by both Boss
Energy and logging contractor Borehole Wireline prior to the program
commencing.
• Given the historic nature of the 580 and MTC series holes, it is not possible to
comment on the calibration of gamma logging tools carried out at the time.
www.bossenergy.com
@Boss_Energy
Criteria
JORC Code explanation
Commentary
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• A number of twin holes have been drilled as part of the current campaign.
The PFN and calibrated gamma results from this drilling will be used to verify
previous PFN results and also to verify the historic gamma logging from the
1970s.
• Natural gamma logs are used to depth match all geophysical tool runs to
ensure accuracy.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and downhole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• The historic YAM, BMR and BMW series drill holes were pegged using a handheld Garmin GPS with a nominal accuracy of ±5m. Coordinates are cited in
MGA94 grid, z54.
• The recent round of BMR drill collars have been picked up using a Trimble
TDC600 high accuracy DGPS with a nominal accuracy of ~0.1m.
• Given the historical nature of the 580 series drill holes, it is not possible to
comment further on the pegging method. In most cases, the collar locations
have been identified in the field and verified this way.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing
Share your feedback
Discover