FY2026 Results and New Feasibility Study Presentation
Released
Released
Announcement PDF
FY26ResultsandNew
FeasibilityStudyPresentation
27August2026
ASX:BOE
OTCQX:BQSSF
Aglobal multi-mine Uranium producer. bossenergy.com
Disclaimer and Important Notices
Boss makes no representations as to the accuracy or completeness of any forward-looking statements or projections or that any forecasts will be achieved.
Additionally Boss makes no representation or warranty, express or implied, in relation to, and (to the maximum extent permitted by law) no responsibilityor
liability (whether for negligence, under statute or otherwise) is or will be accepted by Boss or by any of its officers, directors, shareholders, partners, employees,
or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions ormatters (express or implied) arising out of, contained
in or derived from this Presentation or any omission from this Presentation.
Boss does not undertake or accept any obligation or undertaking to release publicly any updates or revisionsto any forward-looking statements to reflect any
change in Boss’s expectations or any change in events, conditionsor circumstances on which any such statement is based, except as required by law.
Mineral Resource estimates are necessarily imprecise and depend on interpretations and geological assumptions, minerals prices, cost assumptions and
statistical inferences (and assumptions concerning other factors, including mining, processing, metallurgical, infrastructure, economic, marketing, legal,
environmental, social and governmental factors) which may ultimately prove to be incorrect or unreliable.
Mineral Resource estimates are regularly revised based on actual exploration or production experience or new information and could therefore be subject to
change. In addition, there are risks associated with such estimates, including (among other risks) that minerals mined may be of a different grade or tonnage
from those in the estimates and the ability to economically extract and process the minerals may become compromised or not eventuate.
Accordingly, this is another reason why no assurances can be given of whether the production guidance, financial forecasts or other forecasts or other forward-
looking statements or information in this Presentation will be achieved.
EFFECT OF ROUNDING
All dollar amounts are in Australian dollars unless otherwise indicated. A number of figures, amounts, percentages, estimates, calculations of value and
fractions in this Presentation are subject to the effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this
Presentation.
MINERAL RESOURCE ESTIMATES
The information in this Presentation that relates to the Mineral Resource estimate for the Honeymoon Deposit was reported in an announcement by the
Company dated 27 August 2026 titled “Honeymoon NFS confirms continued economic production”.
The information in this Presentation that relates to the Mineral Resource Estimate for Gould’s Dam and the Jasons Deposit was reported in an announcement by
the Company dated 19 March 2026 titled “Gould’s Dam and Jasons Deposit Mineral Resource and Permitting Update.”
The Company confirms that it is not aware of any new information or data that materially affects the information included in the originalmarket announcements
referred to above and that all material assumptions and technical parameters underpinning the Honeymoon Deposit, Gould’s Dam and Jasons Deposit Mineral
Resource estimates in the original market announcements referred to above continue to apply and have not materially changed.
PRODUCTION TARGET ANDFORECAST FINANCIALINFORMATION
The information in this Presentation that relates to the production target (and forecast financial information derived from the production target) for the
Honeymoon Deposit was reported in an announcement by the Company dated 27 August 2026 titled “Honeymoon NFS confirms continued economic
production.”
The Company confirms that all the material assumptions underpinningthe production target and forecast financial information derived from the production
target in that announcement continue to apply and have not materially changed.
The production target and forecast financial information for the Honeymoon Deposit referred to in this Presentation is based on 65% Indicated Mineral
Resources and 35% Inferred Mineral Resources over the 9-year life of mine. The first 4 years of the production target is underpinned by 89% Indicated Mineral
Resources and 11% Inferred Mineral Resources. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no
certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target will be realised.
The Company believes that it has a reasonable basis for providing the production target and forward-looking statementsin this Presentation announcement as
the Inferred Mineral Resources are not the determining factor in project viability (noting, most significantly that Honeymoon is already in production). Refer to
Section 12 of the New Feasibility Study (attached to the Company’s announcement dated 27 August 2026 titled “Honeymoon NFS confirms continued economic
production.”) for the material assumptions underpinning the production target and forecast financial information.
This investor presentation (“Presentation”)has been prepared by Boss Energy Limited (ACN 116 834 336) (“Boss Energy” or“Company”).
NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
CorporationsAct 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the recipient’s
investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent assessment and
investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should not rely on any
statement or the adequacy and accuracy of any information. This Presentation is in summary form and is not exhaustive. This Presentation
should be read in conjunction with BossEnergy’s periodic and continuous disclosure announcements lodged with the Australian
Securities Exchange, which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of the
information contained in this Presentation. Boss Energy and its directors, employees, agents and consultants shall have no liability
(including liability to any person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters
(express or implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute
that can not be excluded.
PAST PERFORMANCE
Past performance information, including past share price performance of Boss and past Honeymoon Project information, given in this
Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss’s (or anyone else’s)
views on Boss’s future activities, guidance or financial performance or condition. Past performance of Boss cannot be relied upon as an
indicator of (and provides no guidance as to) the future performance of Boss.
FORWARD LOOKING STATEMENTS
This Presentation contains certain forward-looking statements provided by or on behalf of Boss with respect to potential future matters.
Forward-lookinginformation may include, without limitation, statements regarding plans, strategies and objectives of Boss, production
and financial guidance, financial forecasts, estimates of project milestones and timing and expected costs or production outputs. In some
cases, forward-lookinginformation can be identified by terms such as “may”, “will”, “should”, “expect”, “plan”, “anticipate”, “believe”,
“intend”, “estimate”, “predict”, “potential”, “continue” or other similar expressions concerning matters that are not historical facts.
Guidance as to production, unit costs and capital expenditure is based on assumptions, budgets and estimates existing at the time of
assessment which may change over time impacting the accuracy of those estimates. These estimates are developed in the context of an
uncertain operating environment including in respect of inflationary macroeconomic conditions, and uncertainties surrounding the risks
associated with mining which may impact production and have a flow on effect on sales. Actual results may therefore vary significantly
depending on these risks and the timing required to address them.
Forward-lookingstatements reflect Boss’s expectations at the date of this Presentation, however they are not guarantees or predictions of
future performance or statements of fact. Forward-looking information involves known and unknown risks, uncertainties and other factors
(many of which are beyond the control of Boss and its directors and management) which may cause the actual results, performance or
achievements of Boss and its business to be materially different from any future results, performance or achievements expressed or
implied by the forward-lookinginformation. Accordingly, undue reliance should not be placed on forward-looking information.
The forward-lookingstatements in this Presentation reflect various assumptions by or on behalf of Boss (which assumptions may prove to
be inaccurate). Accordingly, this is another reason why such statements are subject to significant business, technical, legal, economic
and competitive and other uncertainties and contingencies and other factors which may be beyond the control of Boss which could cause
actual results or trends to differ materially from the forward-looking statementsin this Presentation, including but not limited to
differences or inaccuracies arising from price and currency fluctuations, geotechnical factors, geological and mining factors, estimated
continuity of mineralised horizons, metallurgical and processing factors, sales factors, drilling and production results, development
progress, operating results, mineral resource estimates, legal issues, legislative, fiscal and regulatory developments, economic and
financial market conditions in various countries, approvals and cost estimates, environmental risks, ability to meet funding requirements,
share price volatility, uranium markets and other matters.
Accordingly, there can be no assurance that such forward-looking statements and projections will be realised.
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 2
Boss Energy – Major Achievements
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 3
FY26 Financial
Results
Doubled revenue,
recordedpositive
cashflowand
strengthenedour debt-
freebalancesheet
despitebeinga capital-
intensiveyear
1
New Feasibility
Study
Honeymoon NFS
confirmscontinued
economicuranium
production,underpinned
by Boss’ world-classISR
capability,operating
experienceand
advancedmodelling
2
FY27
Guidance
FY27 transitionbuildsthe
foundationsfor
Honeymoon’sproduction
ramp-upandlong-term
value
3
Boss enters FY27 with a strong balance sheet, an economically robust plan for Honeymoon, a platform for
growth and significant leverage to a strengthening uranium market
FY26 Results
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 4
FY26 Results
Ayearofsignificantoperationalandtechnical progress, withastrong,debt-freebalancesheet
Net Profit After Tax
$2.5M net profit after
tax, a $36.7M
improvement on the
FY25 loss
*
Uranium Inventory
1.581Mlbsof
uraniuminventoryon
hand,worth
approximately
$195M at spot
BalanceSheet
$207.3M in cash and
liquidassets,and
debtfree
Reinvestment
$65.9M invested at
Honeymoon in
infrastructure and
technical work to
underpin a
sustainable
pathway
Sales Revenue
$151.1M in sales
revenue,doubled
from $75.6M in
FY25, at an average
realisedpriceof
$111/lb
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 5
FY26 – Results Highlights
FINANCIAL
Revenue
FY26 $151 M
FY25 $76 M
Profit / (loss) after tax
FY26 $3 M
FY25 ($34 M)
Operating cashflow
FY26 $74 M
FY25 $17 M
Cash and liquid assets
FY26 $207 M
FY25 $224 M
OPERATIONS
Production
FY26 1,407 klbs
FY25 872 klbs
Realised price
FY26 US$74 /lbs
FY25 US$78 /lbs
C1 cost
FY26 $39 /lbs
FY25 $35 /lbs
Inventory (drummed U3O8)
FY26 1,581 klbs
FY25 1,409 klbs
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 6
Netprofitfortheyearwhilemaintainingastrongbalancesheet
Revenuedoubled, areturntoprofitandastrongdebt-free balancesheet
7
. Aglobal multi-mine Uranium producer
BossEnergy FY26 Results / Feasibility Presentation
• Revenue doubled to $151.1 million on the sale of 1,400klbs of U₃O₈ at an
average realised price of $111/lb, delivering a net profit of $2.5 million – a
$36.7 million turnaround.
• Operating cash flow of $73.6 million funded $66.7 million of mine
development, with cash increasing by $13.1 million to $49.7 million.
• Balance sheet remains strong at $207.3 million of cash and liquid assets
with no debt, including uranium inventory of $116.3 million, at book value.
• Inventory grew to 1.581Mlbs, which has a potential market value that is
higher than the book value – approximately $195 million at spot price1 –
Boss remains deliberately under-contracted.
• FY2026 C1 cost of $39/lb (US$26/lb), AISC of $61/lb (US$41/lb) and
Honeymoon capital expenditure of $65.9 million were all within revised
guidance.
7
$000’s FY2026 FY2025
Profit & loss
Revenue 151,072 75,596
Operating costs (122,033) (87,636)
Other expenses and income tax (26,495) (22,128)
Net profit / (loss) after tax 2,544 (34,168)
Cash flow
Opening cash 36,531 67,122
Net cash from operating activities 73,636 17,384
Net cash used in investing activities (56,757) (48,205)
Financing, FX and other movements (3,739) 230
Closing cash 49,671 36,531
Financial position
Cash and liquid assets 207,312 224,334
Other assets 334,539 303,881
Total liabilities (64,238) (44,536)
Total net assets 477,613 483,679
FY2026 Financial Summary
11.581Mlbs at UxC spot rate on 29 June 2026 of US$84.75and AUD:USD of 0.6869
New Feasibility
Study (NFS)
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 8
Economicproduction
confirmed`
Wide-spaced ISR wellfield
design supports production
to at least FY34 with planned
drummed U3O8 of 13.8Mlbs1
Wider spacing lowers
costs
Life-of-mine AISC reduced
by around A$30/lb on a
like-for-like basis
Favourable deposit
characteristics
High permeability, aquifer
confinow groundwater flow
velocity and acid demand
Benchmarked
globally
Design and operating
parameters in line
with established ISR
operations
World-classmine
planning
Reactivetransport
modellingcalibrated
againstoperating
data
HoneymoonNFSconfirmseconomicproduction
World-classISRcapability,operatingexperienceandadvancedmodellingunderpinthepathway
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 9
Wider well spacing establishes a lower-cost, capital-efficient life-of-mine plan and a robust pathway to long-term
uranium production.
Capital-lightfacilities
spend
Only $58M of additional
facilities capital, phased
over the life-of-mine
1Refer to cautionary statement regarding the production target on Page 2.
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 10
1Refer to ASX announcement dated 18 December 2025, ‘Honeymoon Update’.
01
THE CHALLENGE1
The EFS design assumptions no
longer reflected the orebody
Higher-grade mineralisation discontinuous
Mineralisation hosted in clays
Less overlap across stacked horizons
Smaller productive wellfields
Increasing AISC
02
THE COST RESET
Incremental savings could not
unlock the lower-grade resource
Extensive low-grade mineralisation
EFS approach would have lifted capital and
cost per pound
A fundamental change in cost structure is
required
03
THE PATHWAY FORWARD
Wider spacing changes the
economics of wellfield development
Fewer wells and less infrastructure
Longer lixiviant residence time
Higher PLS grades and a lower cut-off
TECHNICAL FOUNDATION
Honeymoon's deposit characteristics support the
wider-spaced design
Strong
hydraulic
connectivity
High
permeability
Favourable
mineralogy
Low
groundwater
flow velocity
Continuous low-
grade
mineralisation
Wider-spaced wellfield design addresses the cost challenge
Honeymoon Review to NFS Pathway
The Honeymoon NFS Journey
Resource redefinition and the pathway to a wide-spaced wellfield design
PROBLEM IDENTIFIED HONEYMOON REVIEW NEW FEASIBILITY STUDY
JUL 2025
Deviation flagged
FY26 guidance notes
delineation drilling at East
Kalkaroo showing less
continuity of mineralised
horizons than assumed in the
2020 FS and 2021 EFS.
SEP 2025
Review and drilling underway
Honeymoon Review
commences alongside an
accelerated delineation
drilling program at East
Kalkaroo and Brooks Dam.
DEC 2025
EFS withdrawn, new
study initiated
Review confirms a material
deviation from EFS assumptions.
The EFS is withdrawn and a New
Feasibility Study is initiated on a
wide-spaced wellfield design.
Q1 CY26
Resource and growth
work programs
Initial update delivered, with an
updated Gould’s Dam and
Jasons Deposit Mineral Resource
estimate and permitting update
released in March 2026.
Captures some understandings
from Honeymoon.
Q2 CY26
Progressed directly to
Feasibility Study
Progressed directly to
Feasibility (versus Scoping)
Study and transitioned to
wide-spaced wellfield design.
Q3 CY26
New Feasibility Study
delivered
Updated Mineral Resource of
20.8 Mlbs U₃O₈1 and the
completed New Feasibility
Study set the basis for wide-
spaced wellfield development.
A defined pathway forward
Twelve months of drilling, operating data and independent review have replaced the withdrawn EFS with a materially improved understanding of Honeymoon.The
quality and integrity of the NFS is underpinned by current production outcomes, particularly on lixiviant and processing plant performance; Significantly more and
closer spaced drilling to inform MRE; Benchmarking against best practice ISR globally.
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 11
1Refer to page 13 for further detail on Mineral Resource Classification for the Honeymoon Deposit
MineralResource
EstimateUpdate
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 12
FY26 /
Results Feasibility Presentation 13
Mineral Resource Estimate
HoneymoonDepositUpdatedMineralResourceEstimate
Notes
• The Mineral Resource estimate is classified in accordance with the JORC Code (2012).
• The Mineral Resource database has a cut-off date of 31 December 2025.
• The effective date of the Mineral Resource estimate is 30 June 2026.
• The Mineral Resource estimate is reported at an in-situ cut-off of 100 ppm U3O8. A grade-thickness(GT) cut-off of GT≥400 m.ppm U3O8 was applied selectively in
border areas of the MRE.
• Only the recoverable portion of blocks ≥100 ppm U3O8 is reported.
• The Mineral Resource is constrained to an ISR-amenable permeability threshold of KSDR≥100mD.
• The Mineral Resource is mainly based on equivalent U3O8 (eU3O8), without adjusting for localised radiometric disequilibrium effects.
• The Mineral Resource estimate is reported net of depletion from the Honeymoonin-situ recovery (ISR) extraction of 3.3 Mlbs U3O8 (1.5 Kt U3O8) as of 30 June
2026 by subtraction of extracted metal tonnes from Indicated Resource metal tonnes.
• The Mineral Resource estimate is reported on an in-situ tonnes basis.
• The Mineral Resource estimate is rounded to reflect the level of confidence in the estimate at the time of reporting.
• Totals may vary due to rounding.
• The Mineral Resource estimate is reported both within the HoneymoonML6109licence and outside in EL6081 licence.
BossEnergy. Aglobal multi-mine Uranium producer
FY26 Results / Feasibility Presentation
Resource Classification Mt
Grade
(ppm U3O8)
Metal
(Kt U3O8)
Metal
(Mlbs U3O8)
Indicated 12.1 510 6.2 13.7
Inferred 9.3 350 3.2 7.1
TOTAL 21.4 440 9.4 20.8
Honeymoon Project Mineral Resource Estimate — effective date 30 June 2026, reported net of ISR depletion of 3.3 Mlbs U3O8 to 30 June 2026.
20.8 Mlbs U3O8
Of metal at 440 ppm — 66% Indicated and 34% Inferred
65.9 Mlbs U3O8
Total Mineral Resource across the Honeymoon Catchment, including 45.1
Mlbs at Goulds Dam and Jasons1
Change of cut-off to 100ppm U3O8
Change of cut-of-grade from 250ppm to 100ppm U3O8
All MREs Updated in CY26
Boss has updated all MREs during CY26, capturing improved understandings
gained from Honeymoon
FY26 Results / Feasibility Presentation 13
RSC
Completed by RSC, with Competent Person Guillaume Lorilleux (PhD), ex-
Orano
Updated Mineral Resource foundation The NFS is underpinned by an updated MRE incorporating substantially increased drilling density, revised geological interpretations, operating
permeability data and experience gained since production recommenced — enabling a materially enhanced understanding of mineralisation grade and distribution, geology and permeability.
1Refer to Appendix 1 for further details of Mineral Resource classification for Gould’s Dam and Jasons Deposit
Datarichenvironment
2026MineralResourceEstimate
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 14
86,670 additional metres
685 additional drillholes for 86,670 m of drilling within the MRE model area — a 34%
increase in drill metres since 2019
97% rotary mud
of the MRE dataset, with diamond core, sonic drilling completing the database
Increased drill density
5–40 m at Honeymoon, 10–60 m East Kalkaroo,20–100 m Central Kalkaroo and 20–
40 m Brooks Dam (main portion)
Gamma and PFN
calibrated downhole gamma (eU3O8) with quality-ranked PFN validated against
sonic core assays; ~99% equivalent grades precludes classification as Measured
resources
Deposit-wide nuclear magnetic resonance (NMR)
permeability models define ISR-amenable domains,calibrated against commercial
ISR production performance
Figure: Drilling completed since 2019(Red) informing the new Mineral Resource. Honeymoonis a sandstone-hosted palaeovalley uranium deposit, with mineralisation
in permeable Eyre Formationsands at 80–120 m depth, controlled by redox interfaces, permeability contrastsand palaeovalley geometry.
Mineral Resource Estimate
HoneymoonDepositUpdatedMineralResource
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 15
6-km strike length - mineralisation extends along the
palaeovalley, up to 650 m wide, at depths of approximately 80 m to
120 m below surface.
Continuous mineralisation - reaching thicknesses of up to
34 m at a 100-ppm U₃O₈ cut-off within permeable lithologies.
Four estimation domains - East Kalkaroo, Central
Kalkaroo, Honeymoon and Brooks Dam.
Basal aquifer of the Eyre Formation - hosts most
mineralisation, concentrated in the lower sand units across the
Honeymoon and East Kalkaroo domains. Brooks Dam
mineralisation is primarily hosted in the upper portion of the
sequence.
ISR extractability and RPEEE - mineralisation has been
excluded from the MRE where these criteria are not met, primarily
reflecting permeability constraints within portions of the deposit.
Figure: Plan view of the HoneymoonDeposit showingthe deposit grade-thicknessdistribution of Resource blocks at 100 ppm U3O8 cut-off with continuous
mineralisationover a 6-km strike length, and geographical domains.
What has changed
More drilling and data
716 holes for 90,651 m drilled since the 2019 MRE — a 34% increase in drill metres
ISR permeability screen
Only permeable reservoir sands (KSDR ≥100 mD) included; uranium hosted in clay excluded
Tighter domaining and RPEEE
Revised Eyre Formation and grade domains
Depletion since 2019
2.5 Mlbs U₃O₈ extracted to 30 June 2026 (3.3 Mlbs total depletion)
Lower cut-off grade
250 ppm to 100 ppm considering the wide-spaced wellfield design, adding low-grade
resource
Changeagainstthe2019MineralResource
2026MineralResourceEstimate
U₃O₈ Metal (Mlbs, depleted pre-2019)
2019 MRE 35.9
2026 MRE 20.8
A decrease of 15.1 Mlbs U₃O₈ (42%) with the 2026 MRE depleted for extraction post 2019 (2.5Mlbs to 30
June 2026) at a cut-off grade of 100ppm eU3O8 and the 2019 MRE not depleted for extraction post 2019
and reported at a cut-off grade of 250ppm eU3O8.
U₃O₈ Metal (Mlbs, undepleted @ 250ppm cut-off)
2019 MRE
2026 MRE 13.6
A decrease of 23.1Mlbs U₃O₈ (-63%) with both the 2019 and 2026 MRE undepleted for all extraction and
reported at a cut-off grade of 250ppm eU3O8 for both MRE
36.7
−42%
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 16
Consistent with the Honeymoon Review The updated MRE confirms the key findings of the Honeymoon Review announced on 18 December
2025 — particularly the importance of permeability and extractability considerations, along with less continuity of higher-grade mineralisation
above a 250 ppm cut-off.
Add back depletion
−63%
−35%
Wellfields
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 17
HoneymoonDepositCharacteristics
Depositcharacteristicsthatenablewide-spacedwellfielddesign
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 18
High permeability and
flow capacity
Operating data confirms high
hydraulic conductivity
Sustained flow rates over
greater distances give the
hydraulic basis for wider
injector-to-producer spacing.
40 m/day basal sand K
0.30 effective porosity
≥100 mD KSDR threshold
Clayey sand – limited flow
Coarse sand – fast efficient
flow
Strong lateral
hydraulic conductivity
Interconnected sand bodies
form a continuous flow system
The aquifer is laterally
connected, allowing pressure
and flow to propagate
efficiently between wider-
spaced wells.
~6 km continuous strike
49 m injector to extractor
~32 m³/h average well flow
Disconnected sand bodies —
poor well communication
Continuous sand channels –
strong well to well
communication
Laterally extensive
mineralisation
Discontinuous high-grade zones
occur within a continuous low-
grade envelop
The continuous mineralised
envelope links discontinuous
high-grade zones, allowing
wider-spaced patterns to
intercept mineralisation reliably.
100 ppm U₃O₈ resource cut-off
600 m.ppm pattern GT minimum
Continuous low-grade
envelope – reliable pattern
coverage
Favourable vertical
continuity
Mineralisation extends
across a substantial vertical
interval
Vertically continuous low-
grade mineralisation, with
locally continuous high-
grade lenses, supports
effective sweep across
wider-spaced patterns.
3 stacked horizons (at a lower cut-off
grade
1–3 levels per pattern
4 m of minimumvertical continuity
Thicker ore behind the
screen
Favourable mineralogy
Low reagent demand; limited
carbonate and reactive clay
The lixiviant remains effective
over longer flow paths.
Moderate oxidant demand
and minimal carbonate / clay
buffering promote rapid
uranium dissolution.
~6 kg/t acid consumed (based on
commercial production data)
~1.8% reactive smectite
~20% kaolinite, non-reactive
Low-buffering sand — acid
remains effective
Effective confinement
and hydraulic control
The Namba Formation provides
effective vertical confinement
Combined with the low
natural groundwater-flow
velocity, this limits dilution
and enables controlled
circulation at wider spacing.
0.0001 m/day Namba vertical K
up to 40 m clay confining unit
50–55 m standing water level
Flow remains within the ore
bearing aquifer
Clay & carbonate rich sand – pH
front retarded
pH
pH
Advanced ISR Mine Planning
RTMlinkstheresourcemodeldirectlytowellfieldperformanceand
thelife-of-mineschedule
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 19
3D RESOURCE
Grade, thickness and uranium
inventory
HYDROGEOLOGY
Permeability, porosity and
connectivity
GEOCHEMISTRY
Mineralogy, acid and oxidant
demand
OPERATIONS
Spacing, flow, screens and
lixiviant chemistry
RECOVERY
Timing and cumulative extraction
PLS CHEMISTRY
Uranium tenor, pH and redox
REAGENTS
Acid and oxidant consumption
MINE PLAN
Wellfield curves and production
schedule
REACTIVE
TRANSPORT
MODEL
HYTEC + Boss
workflow
Every future wellfield receives a production response reflecting its local geology, permeability, hydraulic connectivity and geochemistry.
A time-dependent, three-dimensional framework replaces generic
recovery factors with wellfield-specific production responses.
Preferredbalance
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 20
The wider-spaced wellfields are a more appropriate design based on the Honeymoon Deposit characteristics
Sub-optimal
Rapid breakthrough; high development
intensity; Sub-optimal recovery
Improved residence time & leaching efficiency
with controlled operability
Slower recovery and greater dependence on
hydraulic continuity
Preferred balance
Diminishing benefit
Uranium Dissolution Efficiency curve is based on the Damköhler number. It relates the
chemical reaction timescale (reaction rate) to the transportphenomena rate. The NFS
baseline is selected before the response reaches the diminishing-return region
BossEnergy. Aglobal multi-mine Uranium producer FY26 Results / Feasibility Presentation 21
RTMquantifiesthespacingtrade-off
Wider spacing lifts recovery and cuts development intensity
The analysis tested spacing, geometry, flow and kinetics across the full planned wellfield inventory.
35 m
HISTORICAL
Wells (injection and extraction)
Wellfields (8-pattern) 116
Average PLS tenor 29 mg/L
2,480
R