Quarterly Activities Report - June 2024
Released
Released
Announcement PDF
ASX Release 24 July 2024
June 2024 Quarterly Report
Production ramp-up proceeding to plan with
technology proven at commercial scale
Honeymoon on track to meet FY25 production target of 850,000lbs of U308 as set out in
Feasibility Study; Construction of second and third NIMCIX production columns on schedule
Highlights
Honeymoon Uranium Project, South Australia
Operations
•
Successful commissioning, with Boss proving its lixiviant chemistry and ion exchange
technology at commercial scale
•
57,364lbs of uranium produced during the June quarter
•
Ramp-up to steady-state production proceeding to plan, with key production metrics meeting
Feasibility Study forecasts
•
Construction of NIMCIX columns 2 and 3 proceeding to plan and on target for commissioning
in Q3 and Q4, 2024 respectively
•
Preliminary updates on costs to be provided once NIMCIX columns 2 and 3 are commissioned
•
Boss expects production of at least 850,000lbs of U308 in FY25; This is in line with Feasibility
Study forecasts
Geology
•
Strong drilling intercepts confirm production potential of Gould’s Dam at Honeymoon
•
A further 96 mud rotary holes were drilled for 12,911m, with uranium mineralisation highlights
including (PFN results, ppm pU3O8):
o 4.00m @ 2,925ppm pU3O8
o 4.25m @ 2,230ppm pU3O8
o 3.25m @ 1,406ppm pU3O8
o 5.25m @ 800ppm pU3O8
o 2.25m @ 1,717ppm pU3O8
o 1.25m @ 2,877ppm pU3O8
o 1.75m @ 1,990ppm pU3O8
GT 11,700
GT 9,478
GT 4,570
GT 4,200
GT 3,863
GT 3,596
GT 3,483
(WRM0151 from 122.75m)
(WRM0109 from 120.75m)
(WRM0128 from 123.75m)
(WRM0099 from 117.00m)
(WRM0159 from 121.75m)
(WRM0114 from 124.50m)
(WRM0142 from 120.25m)
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Duncan Craib - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Paul Armstrong – Public Relations
+61 (08) 9388 1474
www.bossenergy.com
@Boss_Energy
Alta Mesa, South Texas (Boss 30%)
•
Successful production start-up announced 13 June 2024
•
Alta Mesa expected to reach full operational capacity of 1.5Mlbs a year by 2026. Boss’ share
of Alta Mesa production is 30 per cent (450,000lbs a year at nameplate capacity)
•
Alta Mesa has potential for further resource growth and additional drying capacity of
500,000lbs a year
Corporate
•
As at 30 June 2024, Boss held liquid assets of A$272.5M; Boss has no debt
•
Well positioned to benefit from rising uranium prices with most of Honeymoon Life of Mine
(LOM) production and all of Alta Mesa production uncontracted
•
Boss continues to strengthen its senior management team in line with the Company’s growing
status as a global uranium producer; Highly experienced uranium exploration geologist
Dr. Andy Wilde was appointed Chief Geologist
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) is pleased to report on the June 2024 quarter, during
which the Company achieved a number of milestones including first production at Honeymoon and at
its 30 per cent-owned Alta Mesa Project in South Texas.
Boss Managing Director Duncan Craib said:
“Putting cake in the can with our first production at Honeymoon was a significant milestone for Boss
which proved that our lixiviant chemistry and ion exchange technology works at commercial scale.
“The production ramp up at Honeymoon, including the key production metrics, is progressing in line with
our Feasibility Study forecasts and therefore we are on track to produce at least 850,000 pounds of U308
in FY25.
“This strong outlook is also supported by the progress being made in the construction of the second and
third NIMCIX columns which are scheduled to start operating, in line with the production ramp-up
timetable, by Q3 and Q4, 2024 respectively.
“With both Honeymoon and Alta Mesa producing, Boss has become the only multi-asset uranium
producer on the ASX.”
Executive Appointments
During the quarter, Boss appointed Dr. Andy Wilde as Chief Geologist.
Dr Wilde is a geologist with over 35 years industry experience, including 7 years as chief geologist for
uranium mining and exploration company Paladin Energy Ltd (ASX: PDN) during the previous uranium
bull cycle. In this role he was responsible for leading technical aspects of uranium exploration and
project assessment in Namibia, Malawi, Canada and Australia among others. More recently, he played
an important role in the discovery of Deep Yellow’s Barking Gecko and Iguana uranium deposits in
Namibia (ASX: DYL), following which he provided the technical basis for the ASX listing of 92 Energy Ltd
(ASX: 92E) and was pivotal in the discovery of that company’s GMZ uranium deposit in Saskatchewan,
Canada. For the past few years, he has run a successful consultancy, advising many companies on
uranium and rare earth exploration.
Dr Wilde holds a Bachelor of Science degree with first class honours from the University College of Wales
Aberystwyth and a PhD dealing with unconformity-type uranium deposits from Monash University in
Melbourne. He is a Fellow and Registered Professional Geoscientist (Mineral Exploration) of the
Australian Institute of Geoscientists and a Fellow of the Geological Society of Australia. He is also a
graduate of the Australian Institute of Company Directors.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
Page 2
Strong Balance Sheet
As at 30 June 2024, Boss has no debt and $272.5M of liquid assets (being cash, liquid investments and
physical uranium). The uranium inventory was valued at A$166.8M, including 200,000lbs uranium
loaned to enCore Energy Corp. ("enCore") (NASDAQ: EU) (TSXV: EU), which is repayable in cash or in
kind in December 2024.
Unrestricted cash and cash equivalents stood at $67.1 million (which excludes a fully cash-backed
environmental bond of $13.5M) and listed investments (including the Company’s investment in enCore)
were valued at $38.6M. Cash balances are being managed with a term deposit program to take
advantage of the higher interest rate environment.
Honeymoon Production Results for the June 2024 Quarter
On 22 April 2024 the Company was pleased to announce a major milestone in producing the first drum
of uranium at its 100 per cent-owned Honeymoon Uranium Project in South Australia.
First production was slightly later than expected given additional time required to commission and tune
the new horizontal electrical kiln (calciner) to allow the Drying and Packaging area to ramp up to the
required throughput. The Company installed one of the first fully electric calciners in Australia as part of
its strategy to reduce its carbon footprint.
Honeymoon is producing in-line with feasibility study expectations and schedules.
Table 1: Operational physicals for the June 2024 Quarter
Process
Wellfields online
Wells online
IX Columns operational
IX Flow (total)1
PLS to IX tenor (weighted average)2
IX Recovery (weighted average)2
IX Production (total)1
U3O8 Drummed (total)
Unit
(m3)
(U3O8 mg/l)
(%)
(lbs)
(lbs)
Actual Observed
1
16
1
327,066
80
99.653
57,364
28,844
Notes: (1) Conversions: There are 1,000 litres per m3 and 0.0000022 lbs per mg. (2) The weighted average is
calculated based on total flow for the quarter.
It is important to note that tenors being achieved from initial wellfields are not indicative of the average
LOM grades that were set out in the Feasibility Study1.
Given the time taken to ramp-up wellfields in ISR projects, preliminary cost updates will be provided once
columns 2 and 3 are commissioned.
Since acquiring Honeymoon in December 2015, Boss has invested significant time and capital in making
technical improvements to the project. Boss has now been able to prove the scale-up of its lixiviant
chemistry and Ion Exchange technology to commercial scale which gives the Company confidence that it
will meet its FY25 production target of 850,000 lbs of U308 as set out in Feasibility Study.
1
Refer to ASX: BOE announcement dated 21 June 2021.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
Page 3
Honeymoon Construction Activities
Construction of NIMCIX columns 2 and 3 are on track for completion in the September and December
quarters respectively.
Figure 1: Construction of NIMCIX columns 2 and 3 nearing completion
Boss Sales
To date, Boss has entered into two binding sales agreement to sell 1.8Mlbs of U308 to major European
and US power utilities over eight years from 2024 to 2032. Boss remains strategically under-contracted
with most of Honeymoon LOM production and all of Alta Mesa production uncontracted.
Boss’ contracting strategy is to monitor the markets and layer in contracts, predominantly marketrelated, to optimise future pricing and, in the near term, to ensure profitability and cash flow as
production ramps up.
Geology – Uranium
On 26 June 2024, Boss announced its latest high-grade drill results on the Gould’s Dam satellite deposit.
These results support the Company’s strategy to increase the nameplate production rate and mine life
at Honeymoon.
In light of these strong results, work has commenced on accelerating the development of Gould’s Dam,
which is an important satellite project to the nearby Honeymoon Mine.
The current delineation program provides important data which will be used in wellfield planning and
other advanced pre-development activity.
It will also enable Boss to complete detailed geological and mineralisation models which will support the
ongoing development work and preparation for an ISR Mining Lease proposal for Gould’s Dam.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
Page 4
This will lead into the next phase of mine plan development, including pump testing of the mineralised
aquifer within the Gould’s Dam Indicated resource (utilising monitoring wells installed during the 2023
drilling campaign) and core sample test work. This will provide important baseline hydrogeological and
metallurgical characteristics of the mineralised aquifers.
The latest drilling is targeting three key areas within the inferred resource envelope at Gould’s Dam –
comprising Sunrise, Billeroo and Beulah. Gould’s Dam is located ~80km northwest of the Honeymoon
Mine and currently contains a JORC-compliant resource of 25Mlbs of indicated and inferred U308.
A total of 96 mud rotary holes have been drilled to date for 12,911m, with uranium mineralisation
highlights including (PFN results, ppm pU3O8):
o 4.00m @ 2,925ppm pU3O8
GT 11,700
o 4.25m @ 2,230ppm pU3O8
GT 9,478
o 3.25m @ 1,406ppm pU3O8
GT 4,570
o 5.25m @ 800ppm pU3O8
GT 4,200
o 2.25m @ 1,717ppm pU3O8
GT 3,863
o 1.25m @ 2,877ppm pU3O8
GT 3,596
o 1.75m @ 1,990ppm pU3O8
GT 3,483
o 3.75m @ 773ppm pU3O8
GT 2,899
o 1.50m @ 1,855ppm pU3O8
GT 2,783
o 4.50m @ 545ppm pU3O8
GT 2,453
o 4.75m @ 506ppm pU3O8
GT 2,404
o 4.75m @ 484ppm pU3O8
GT 2,299
➢ plus 1.75m @ 1,294ppm pU3O8 GT 2,265
o 3.00m @ 756ppm pU3O8
GT 2,268
(WRM0151 from 122.75m)
(WRM0109 from 120.75m)
(WRM0128 from 123.75m)
(WRM0099 from 117.00m)
(WRM0159 from 121.75m)
(WRM0114 from 124.50m)
(WRM0142 from 120.25m)
(WRM0130 from 123.75m)
(WRM0121 from 120.25m)
(WRM0140 from 103.25m)
(WRM0157 from 122.50m)
(WRM0143 from 123.00m)
(WRM0143 from 128.50m)
(WRM0084 from 118.50m)
The results highlight the potential for Gould’s Dam to help lift Honeymoon’s production rate from the
current nameplate capacity of 2.45Mlbs a year to the Export Permit limit of 3.3Mlbs a year and/or extend
the mine’s useful life.
Boss’ exploration strategy has already been highly successful, increasing the JORC Resource at
Honeymoon from 16.57Mlbs to 71.67Mlbs (~4.3x increase) since project acquisition in December 2015 2.
Geology – base metals
On 15 May 2024, Boss announced that First Quantum Minerals’ (TSE:FM) (First Quantum) maiden
diamond drilling program on Honeymoon’s tenements in South Australia had successfully intersected
basement-hosted base metal mineralisation below the Yarramba Palaeovalley which holds the uranium.
Figure 2: Stratiform and vein-hosted chalcopyrite mineralisation in metasiltstones at Atlas target
First results received from a copper exploration program conducted by First Quantum under its farm-in
agreement with Boss at Honeymoon; Assays include:
2
Refer to ASX: BOE announcement dated 25 February 2019. Refer Appendix 1 for Honeymoon JORC 2012 Resource.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
Page 5
•
23CURDD002: 16m @ 0.27% Cu and 0.1g/t Au, from 288m, and;
•
23CURDD006: 47m @ 0.19% Cu from 404m, with a number of narrower zones of 5-6m
containing up to 0.5% Cu and 0.12g/t Au.
The Boss-First Quantum agreement gives First Quantum the right to earn a 51 per cent interest in
Honeymoon’s base metal endowment by spending $6m on exploration and a further 24 per cent interest
by sole-funding all base metals expenditure up to a Decision to Mine.
The agreement enables Boss to remain fully-focused on its core business of uranium exploration,
development and production while having exposure at no cost to the significant potential of a base
metals exploration program led by a global major.
Following receipt of these results, First Quantum elected to continue to fund further exploration under
a joint venture agreement. Under the agreement, First Quantum has the right but not the obligation to
spend $6M on exploration within 5 years, and maintain a minimum annual expenditure on the JV Project
of $500,000 per year.
Alta Mesa
Boss became the only multi-asset uranium producer on the ASX with the commencement of production
during the quarter at its 30 per cent-owned Alta Mesa In-Situ Recovery (“ISR”) Central Processing
Uranium Plant and Wellfields (“Alta Mesa Project”) in South Texas.
On 14 June 2024, Boss advised that Alta Mesa’s uranium production is forecast to ramp up to a steadystate rate of 1,500,000lbs a year by 2026 with additional drying capacity of 500,000lbs a year. Boss owns
the sale and marketing rights over its pro-rata share (450,000lbs at nameplate capacity).
The Alta Mesa Project, which consists of over 200,000 acres plus the central processing plant and
wellfields, is managed by experienced uranium producer, and 70% partner, enCore.
This key milestone came just eight weeks after the start of production at Honeymoon.
Please refer to enCore’s announcement dated 13 June 2024 for further information.3
Boss acquired its 30 per cent interest in the Alta Mesa Project in February 2024 from enCore and its
wholly owned subsidiary, enCore Energy U.S. Corp., a highly credentialed United States uranium
developer and operator, for US$60 million cash (see ASX release dated 27 February 2024).
3
enCore Energy Corp. announcement titled ‘enCore Energy Commences Uranium Production at its Second South Texas Project’ dated 13 June 2024
https://www.sedarplus.ca/csa-party/records/document.html?id=b5b37208e04209072f3a850b53c88385cc67adc9220730b1094ad5024299b241
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
Page 6
Uranium Market Analysis
The spot price in the second quarter remained volatile, peaking at ~ $93/lb and falling to a low of ~$83/lb
towards the end of June. This was more reflective of speculators selling to limit losses from purchases
above $100/lb than of the long-term supply and demand fundamentals, which remain strong. Since
2022, the long-term price indicator has continued to rise and in the six months since the end of
December 2023 the term price has risen by around $12/lb to a level which has not been seen in the
market since 2008. Supply and demand fundamentals are strengthening and so is the rate of rise of the
term price.
Demand for uranium is set to increase in the near term as reactors are restarted, lifetimes are extended
and plans for new reactors gain momentum. Data centre demand continues to grow and is driving the
early deployment of Small Modular Reactors.
June also saw the Department of Energy issue a Request for Proposals (RFP) seeking offers for delivery
of low-enriched uranium. The intention behind the RFP is to purchase low enriched uranium from
domestic sources to encourage the development of new domestic enrichment capacity and reduce
dependence on Russian sources.
At the World Nuclear Fuel Market conference in Atlanta in June, the need for more capacity to meet
Western nuclear fuel demand was highlighted. The passage of the Russian import ban and deadline
from Tenex for waivers placed utilities and suppliers in a wait-and-see mode for most of June as parties
prepared applications for waivers. The decision to grant or withhold waivers will have an impact on the
timing of new RFPs in the US.
The supply side is seen as more vulnerable than demand, with Russia and China increasing their positions
in Kazakhstan and supply chain issues exacerbated by sanctions on Russia and geopolitical tensions
increasing. Western utility access to uranium supply is becoming more constrained and western utilities
are favouring North American and Australian supply sources. The Honeymoon mine has started
production and is preparing for the first shipment of uranium from the mine. Boss is well positioned to
meet the growing demand for uranium from geopolitically stable and secure sources.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
Page 7
Appendix 5B disclosures
In line with its obligations under ASX Listing Rule 5.3.5, Boss notes that the only payments to related
parties of the Company, as disclosed in the Appendix 5B (Quarterly Cashflow Report) for the period
ended 30 June 2024, consist of executive director and chief financial officer salaries and wages (including
superannuation) and payment of non-executive director fees.
During the quarter ended 30 June 2024, the Company spent approximately $24.1M on project and
exploration activities relating to its Honeymoon and Alta Mesa Projects. These activities included:
•
•
•
•
•
Technical studies costs
Construction equipment
Wellfield drilling and development costs
Engineering and construction expenses
Mineral exploration and evaluation costs
In addition to these activities the Company continued to incur costs relating to the ongoing maintenance
activities required at Honeymoon. The expenditure represents direct costs associated with these
activities as well as capitalised wages which can be directly attributable to Honeymoon.
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Duncan Craib
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
ASX: BOE
www.bossenergy.com
OTCQX: BQSSF
Page 8
Reference to previous ASX announcements
In relation to the results of the Enhanced Feasibility Study announced on 21 June 2021, the Company
confirms that all material assumptions underpinning the production target and forecast financial
information included in that announcement continue to apply and have not materially changed.
The mineral resource estimates in this announcement were reported by the Company in accordance
with listing rule 5.8 on 25 February 2019. The Company confirms it is not aware of any new information
or data that materially affects the information included in the previous announcement and that all
material assumptions and technical parameters underpinning the estimates in the previous
announcement continue to apply and have not materially changed.
Forward-Looking Statements
This announcement includes forward-looking statements. These forward-looking statements are based
on the Company’s expectations and beliefs concerning future events. Forward-looking statements are
necessarily subject to risks, uncertainties, and other factors, many of which are outside the control of
Boss Energy, which could cause actual results to differ materially from such statements. Boss Energy
makes no undertaking to subsequently update or revise the forward-looking statements made in this
announcement, to reflect the circumstances or events after the date of this announcement.
Appendix One:
Schedule of Mining Tenements
The following information is provided pursuant to Listing Rule 5.3.3 for the quarter ended 30 June 2024.
Tenement Name
Location
Licence Number
Interest
Yarramba
South Australia
EL6510
100%
South Eagle
South Australia
EL6081
100%
Gould’s Dam
South Australia
EL6512
100%
Katchiwilleroo
South Australia
EL6511
100%
Ethiudna
South Australia
EL6020
100%
Gould’s Dam
South Australia
RL83-85
100%
Honeymoon Mine
South Australia
ML6109
100%
Prairie Dam
South Australia
EL6962
75%
Chalker Dam
South Australia
EL6963
75%
Oakvale
South Australia
EL6964
75%
Gairloch
South Australia
EL6965
75%
Venus Bay
South Australia
EL6992
100%
Darke Peak
South Australia
ELA2024_00018
100%
Rudall
South Australia
EL6999
100%
There were no mining tenement acquisitions or divestments during the quarter.
EL6512, 6511, 6020, 6510 and 6081 are subject to an earn-in agreement with First Quantum Minerals in
respect to the base and precious metal rights. Refer ASX release dated 10 February 2022 for further
information.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
Page 9
Honeymoon Project Mineral Resource
Honeymoon’s Mineral Resource (lower cut-off of 250 ppm U3O8)
Classification
Tonnage
(Million Tonnes)
Average Grade
(ppm U3O8)
Contained Metal
(Mkg, U3O8)
Contained Metal
(Mlb, U3O8)
Measured
3.1
1,100
3.4
7.6
Indicated
18.4
630
12.0
25.5
Inferred
30.9
570
18.0
38.5
Total
52.4
620
32.5
71.6
The global Honeymoon Mineral Resource stands at 71.6 Mlb (52.4Mt) with an average grade of 620ppm
U308, using a cut-off grade of 250ppm.
The current Honeymoon restart feasibility studies utilise only a portion of Honeymoon’s JORC resource,
excluding 36Mlb of JORC resource outside the HRA, which could expand the mine life, and Boss’ defined
exploration target could potentially extend the mine life beyond the initial 11 years and increase the
production profile. Honeymoon’s Federal EPIP Act approvals allow export of more than 3Mlbs/annum
U308 equivalent.
In addition to the global Mineral Resource, the Honeymoon Uranium Project also has an Exploration
Target range of 28 Mt to 133 Mt of mineralisation at a grade of 340 ppm to 1,080 ppm U 308 for a
contained 58Mlbs to 190Mlbs U308 (26,300 to 86,160 tonnes of contained U308), using a cut-off of
250ppm4. Note the potential quantity and grade of the Exploration Target range is conceptual in nature.
There has been insufficient exploration to estimate a Mineral Resource and it is uncertain whether
future exploration will result in the definition of a Mineral Resource.