December 2025 Quarterly Results Presentation
Released
Released
Announcement PDF
A global multi-mine Uranium producer
ASX: BOE | OTCQX: BQSSF
bossenergy.com
December 2025 Quarterly Results
28 January 2026
Boss Energy | A global multi-mine Uranium producer 2
Production Results
• Record Honeymoon quarterly drummed
production of 456 klbs (up 18%) and IX
production of 406 klbs (up 8%).
• Remain on track to deliver FY26
guidance of 1.6 Mlbs.
• Alta Mesa drummed production of
143 klbs (down 31%).
• NIMCIX column completion ongoing.
• Wellfield B5 flushing commenced and
will commence production in Q3FY26.
Strong Financial
Position
• Average realised price of $112.2/lb
(US$74.0/lb) from sales of $39.3 million
(US$25.9 million).
• C1 Cash Cost of $30/lb (US$20/lb) down vs
prior quarter of $34/lb (US$22/lb).
• AISC of $49/lb (US$33/lb) down vs prior
quarter of $50/lb (US$33/lb).
• C1 cost guidance revised from $41-45/lb
(US$27-29/lb) to $36-40/lb (US$24-26/lb).
• AISC guidance revised from $64-70/lb
(US$41-45) to $60-64/lb (US$40-42/lb).
• Balance sheet remains strong with $208M
of cash and liquid assets.
Further growth and
other initiatives
underway
• Continued program of work to
accelerate the permitting of Brooks
Dam North and Jason's and Gould's
Dam.
• Honeymoon Review completed and
New Feasibility study initiated.
• The successful and timely delivery of
the New Feasibility Study is a top
strategic priority for Boss.
Q2 Highlights
Strong quarter of production, reduced cost and strong balance sheet
Boss Energy | A global multi-mine Uranium producer 3
Honeymoon Production Results
Record drummed production keeps Boss on track to meet FY26 Guidance
Honeymoon Quarterly Production
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
500,000
2Q25 3Q25 4Q25 1Q26 2Q26
lbs
IX Production U3O8 Drummed
• Drummed production of 456 klbs lbs U3O8 up 70 klbs (18%).
• IX production of 406 klbs up 30 klbs (8%) due to increased flow from four
wellfields being online for the full quarter (vs wellfield B4 coming online
part way through the prior quarter).
• Production will be softer in Q3FY26 before increasing again in Q4FY26,
due to the phasing of wellfields.
• Key activities for upcoming quarter are completion of commissioning of
NIMCIX columns 4 and 5. Wellfield B5 is expected to begin production in
the coming few days.
Boss Energy | A global multi-mine Uranium producer 4
0
25
50
75
100
125
Q1FY26 Q2FY26
A$
AISC Realised price
Cost Performance
Full year cost guidance adjusted lower
Key Metric Unit
Q2
FY26
Q1
FY26
Full Year Guidance FY26
Revised Previous
Cash Cost $/lb 30 34 36-40 41-45
All In Sustaining Cost (AISC) $/lb 49 50 60-64 64-70
Capital expenditure
Sustaining $M 6 6 30-33 29-32
Project and Supporting Infra. $M 11 9 30-33 27-30
Total Capital Expenditure $M 17 15 60-66 56-62
Honeymoon Quarterly AISC and Realised price
• Full year C1 cost guidance revised $5/lb lower following continued
positive results from reagent optimisation in the wellfields and plant and
other cost reduction programs and one-off savings.
• Sustaining capex $1M higher. Boss continues to balance new wellfields
under the current design and trial patterns while slowing spend on
infrastructure that may not be relevant to the new wide-spaced wellfield
design.
• Additional $3M project and supporting infrastructure capex reflecting
acceleration of the delineation drilling program.
• Strong margin based on current AISC and realised price.
Boss Energy | A global multi-mine Uranium producer 5
Financial Strength
Boss is well positioned to self-fund New Feasibility Study and growth opportunities
Sales and Inventory Q2 FY26 Q1 FY26
Sales and loan repayments1 US$000’s 25,886 37,329
Sales and loan repayments1 A$000’s 39,262 57,133
Average realised price2 US$/lb 74.0 74.7
Average realised price2 A$/lb 112.2 114.3
Sales lbs 350,000 400,000
Loan repayment lbs - 100,000
Inventory on hand3 lbs 000’s 1,615 1,440
Cash and liquid assets Q2 FY26 Q1 FY26
Cash on hand A$000’s 52,857 47,767
Investments and other liquid assets A$000’s 44,912 53,700
Inventory on hand A$000’s 110,236 105,839
Trade receivable A$000’s - 5,112
Total cash and liquid assets A$000’s 208,005 212,418
Notes
1. Q1 Sales and loan repayments include a sale recorded during the quarter and cash received on 1 October 2025
2. Q1 Average realised price includes inventory loan repaid
• Strong average realised price of US$74.0 for 350 klbs of sales reinforces
Boss’ strategy to remain strategically under-contracted.
• Drummed inventory on hand increased by 175 klbs to 1,615 klbs,
increasing Boss’ exposure to a tightening uranium market.
• Balance sheet remains strong with $208.0M in cash and liquid assets.
Declined in Q2FY26 mainly due to marked to market declines in fair value
for enCore and Laramide.
• First delivery into a legacy contract will occur in Q3FY26 and Q4FY26
(125 klbs in each quarter) which will reflect an average realised price for
those pounds that is circa 65-70% of the spot price at the time of delivery.
Boss Energy | A global multi-mine Uranium producer 6
Alta Mesa JV
Alta Mesa JV continues to bring on new wellfields
Notes
1. Alta Mesa JV previously reported production on a Uranium Extracted basis. From this quarter onwards, Alta Mesa JV will report production on a drummed U3O8 basis which is consistent with Boss’
reporting of production results for Honeymoon.
• Drummed production of 143 klbs down 64 klbs (31%) on the previous
quarter’ of 206 kbs (on a 100% basis).
• Boss received 68 klbs of drummed production, up from the prior quarter
of 45 klbs reflecting a timing catch up.
• New wellfields continue to be brought online with additional modules
currently being installed at Wellfield 7 and Wellfield 3.
• Alta Mesa East commenced drilling to confirm the potential of extensions
of uranium mineralisation from Alta Mesa into Alta Mesa East.
0
50,000
100,000
150,000
200,000
250,000
2QFY25 3QFY25 4QFY25 1QFY26 2QFY26
Drummed
(lbs)
Alta Mesa JV Quarterly Production (100%)
Boss Energy | A global multi-mine Uranium producer 7
New Feasibility Study
New Feasibility Study is a top strategic priority
Notes
1. See the Company’s announcements dated 28 July 2025 (“Honeymoon FY26 Guidance” and “June 2025 Quarterly Results Presentation”), 5 August 2025 (“Response to ASX Aware Query”), 11
September 2025 (“Honeymoon Review Update”), 29 October 2025 (“September Quarterly Report”), 20 November 2025 (“Chair’s Address and Managing Director’s Presentation to AGM”) and 18
December 2025 (“Honeymoon Update”) for further details.
• The Honeymoon Review1 was concluded with an expected material and
significant deviation from the assumptions underpinning the Company’s
2021 Enhanced Feasibility Study (EFS).
• Through the Honeymoon Review, Boss has identified a potential pathway
forward through an alternative wide-space wellfield design (‘New
Feasibility Study’).
• Key work programs on the New Feasibility Study include:
• Delineation drilling and 3D resource modelling
• 3D simulations based on various wellfield designs and conditions
• Geometallurgical testing and modelling
• Review of wellfield, plant and supporting infrastructure designs or
modifications required
• Consideration of heritage and regulatory requirements
• Identification and design of tests and trial patterns to begin testing
elements of the wide-spaced wellfield design
(150)
(100)
(50)
-
50
100
150
200
250
300
350
400
450
500
550
40 50 60 70 80 90 100 110 120 130 140 150
Well spacing (m)
Grade Time to final recovery
PVE Reagents consumption
Wider spaced wells
Lower capital density
- Lower PVE
- Lower reagent consumption
- Higher grade (enabling increased resource recovery)
- Longer time (days) to recovery
Wide spaced wellfield vs current design
Variance to
current design (%)
Boss Energy | A global multi-mine Uranium producer 8
Satellite Deposits
The early development of the Satellite Deposits has been accelerated
• The early development of Gould’s Dam and Jason’s Deposit remains
a key near-term opportunity for the Company.
• An updated resource statement and timetable of work required to
bring these satellite deposits into production is still expected to be
provided in Q3 FY26.
• Successful granting of a mining permit remains the primary critical
path component to bring these satellite deposits into the production
profile.
• The economics of these satellite deposits would materially improve
if the wide-spaced wellfield design was successful.
Boss Energy | A global multi-mine Uranium producer 9
Summary
Boss on track to meet FY26 Guidance
• Strongest quarter of drummed production and a reduction in operating cost guidance reflects
ongoing operational improvements at Honeymoon.
• Retain strong balance sheet with $208 million in cash and liquid assets. Remaining strategically
under-contracted enables Boss’ future sales to benefit from a tightening uranium market.
• The successful and timely delivery of the New Feasibility Study is a top strategic priority for Boss.
This would improve returns for Honeymoon, Goulds Dam and Jasons Deposit (compared to the
current wellfield design).
• On-track to ensure safe delivery of FY26 production guidance.
Appendices
Boss Energy | A global multi-mine Uranium producer 11
Appendix 1: Quarterly Cashflow bridge
44,374
(16,302)
(6,109)
(5,455)
(4,542)
(3,743)
(3,751)
617 52,857
47,767
Opening
cash
Receipts
from
customers
Honeymoon
operating
costs
Honeymoon
wellfields
capex
Honeymoon
capital
project
Alta Mesa
costs
G&A Exploration
and
investments
Other Closing
cash
-
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
$000's
12
Boss Energy | A global multi-mine Uranium producer
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (Boss Energy or
Company).
NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the
recipient’s investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent
assessment and investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should
not rely on any statement or the adequacy and accuracy of any information. This Presentation is in summary form and does not
purpose to be exhaustive. This Presentation should be read in conjunction with Boss Energy’s periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of
the Information. Boss Energy and its directors, employees, agents and consultants shall have no liability (including liability to any
person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or
implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute that
can not be excluded.
FORWARD LOOKING STATEMENTS
All dollar amounts are in Australian dollars unless otherwise indicated. This announcement may contain certain statements and
projections provided by or on behalf of Boss Energy Limited with respect to the anticipated future undertakings. These forward-
looking statements reflect various assumptions by or on behalf of Boss Energy. Accordingly, these statements are subject to
significant business, economic and competitive uncertainties and contingencies associated with the mining industry which may be
beyond the control of Boss Energy which could cause actual results or trends to differ materially, including but not limited to price
and currency fluctuations, geotechnical factors, drilling and production results, development progress, operating results, reserve
estimates, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries, approvals
and cost estimates, environmental risks, ability to meet funding requirements, share price volatility. Accordingly, there can be no
assurance that such statements and projections will be realised. Boss Energy makes no representations as to the accuracy or
completeness of any such statement of projections or that any forecasts will be achieved. Additionally, Boss Energy makes no
representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under
statute or otherwise) is or will be accepted by Boss Energy or by any of their respective officers, directors, shareholders, partners,
employees, or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions or matters
(express or implied) arising out of, contained in or derived from this announcement or any omission from this announcement or of
any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In furnishing
this announcement, Boss Energy undertakes no obligation to provide any additional or updated information whether as a result of
new information, future events or results or otherwise. Nothing in this material should be construed as either an offer to sell or a
solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in isolation as a
basis to invest in Boss Energy.
EFFECT OF ROUNDING
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
PAST PERFORMANCE
Past performance information, including past share price performance of Boss Energy and pro forma financial information, given in
this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss Energy’s
(or anyone else’s) views on Boss Energy’s future financial performance or condition. Past performance of Boss Energy cannot be
relied upon as an indicator of (and provides no guidance as to) the future performance of Boss Energy. Nothing contained in this
Presentation nor any information made available to you is, or shall be relied upon as a promise, representation, warranty or
guarantee, whether as to the past, present or future.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy.