Annual Report to shareholders
Released
Released
Announcement PDF
ANNUAL REPORT 2025
Boss Energy Ltd
ABN 38 116 834 336
ANNUAL REPORT 2025
Table of Contents
Corporate Directory ......................................................................................................................................... 4
Chairman’s Letter ............................................................................................................................................ 5
Review of Operations ...................................................................................................................................... 6
Mineral Resource Statement ........................................................................................................................ 10
Competent Person Statements .................................................................................................................... 12
Directors’ Report ........................................................................................................................................... 13
Remuneration Report – Audited .................................................................................................................. 26
Lead Auditor’s Independence Declaration.................................................................................................. 51
Consolidated Statement of Profit or Loss and Other Comprehensive Income....................................... 52
Consolidated Statement of Financial Position ........................................................................................... 53
Consolidated Statement of Changes in Equity .......................................................................................... 54
Consolidated Statement of Cash Flows ...................................................................................................... 55
Notes to the Consolidated Financial Statements ....................................................................................... 56
1
Basis of Preparation ......................................................................................................................... 56
2
Notes to Statement of Profit or Loss .............................................................................................. 67
3
Income Tax Expense ........................................................................................................................ 69
4
Segment Reporting........................................................................................................................... 71
5
Earnings Per Share........................................................................................................................... 73
6
Cash and Cash Equivalents ............................................................................................................ 73
7
Trade and Other Receivables .......................................................................................................... 74
8
Inventories ......................................................................................................................................... 74
9
Other Assets ..................................................................................................................................... 74
10
Property, Plant and Equipment ....................................................................................................... 75
11
Investment In Uranium ..................................................................................................................... 76
12
Other Financial Assets ..................................................................................................................... 76
13
Trade and Other Payables ............................................................................................................... 77
14
Provisions ......................................................................................................................................... 77
15
Issued Capital ................................................................................................................................... 78
16
Reserves ............................................................................................................................................ 79
17
Capital and Leasing Commitments................................................................................................. 81
18
Financial Risk Management ............................................................................................................ 83
19
Related Parties .................................................................................................................................. 85
20
Group Entities ................................................................................................................................... 86
21
Parent Entity Disclosures ................................................................................................................ 87
22
Contingent Liabilities ....................................................................................................................... 87
23
Subsequent Events .......................................................................................................................... 87
24
Auditor’s Remuneration ................................................................................................................... 88
Consolidated Entity Disclosure Statement ................................................................................................. 89
ANNUAL REPORT 2025
PAGE I OF II
ANNUAL REPORT 2025
Directors’ Declaration ................................................................................................................................... 90
Independent Auditor’s Report ...................................................................................................................... 91
Corporate Governance .................................................................................................................................. 95
Compliance with ASX Recommendations .................................................................................................. 96
Additional Information ................................................................................................................................ 102
ANNUAL REPORT 2025
PAGE II OF II
ANNUAL REPORT 2025
Corporate Directory
Directors
Mr Wyatt Buck
Mr Duncan Craib
Ms Jan Honeyman
Ms Caroline Keats
Ms Joanne Palmer
Company Secretary
Mr Derek Hall
Principal Place of Business and
Registered Office
Level 1, 420 Hay Street
Subiaco WA 6008
Ph: +61 8 6263 4494
Website: www.bossenergy.com
X: @Boss_Energy
Email: boss@bossenergy.com
Auditors
KPMG
235 St George’s Terrace
Perth WA 6000
Stock Exchange Listings
Australian Securities Exchange (ASX Code: BOE)
OTCQX Market (OTCQX Code: BQSSF)
Share Registry
Automic Registry Services
Level 5, 126 Phillip Street
Surry Hills NSW 2000
Ph: +61 2 9698 5414
ANNUAL REPORT 2025
Non-Executive Chairman
Managing Director & CEO
Non-Executive Director
Non-Executive Director
Non-Executive Director
PAGE 4 of 104
ANNUAL REPORT 2025
Chairman’s Letter
Dear Fellow Shareholder
It is my pleasure to welcome you to the Annual Report of our Company for the financial year to 30 June 2025.
The past year saw Boss pass several major milestones on our successful journey from project developer to
uranium producer. This culminated in the Company outperforming its FY25 production and cost guidance at
our Honeymoon Uranium Project in South Australia. In the process, our total production at the Honeymoon
Uranium Operation passed the 1Mlbs mark soon after the end of the financial year.
Having exceeded our first-year production and cost guidance at Honeymoon, we published production
guidance for FY26 of 1.6M lbs U3O8. C1 cash cost guidance for FY26 is A$41-45/lb (US$27-29/lb) and all in
sustaining cost guidance for FY26 is A$64-70/lb (US$41-45/lb) and we expect Boss as a company will become
cash flow positive in FY26.
During the year we also achieved significant progress at our 30% owned Alta Mesa uranium project in South
Texas and made strategic investments elsewhere to support long-term growth. These included acquiring a
strategic stake in ASX-listed Laramide Resources and forging new regional partnerships.
Following these achievements, Mr Duncan Craib announced that he would step down as Managing Director
after almost nine years in the role. On behalf of the Board, I thank Duncan for his huge commitment to Boss
over such a long period and for his leadership in building an outstanding team and bringing the Honeymoon
Uranium Operation into production. I am delighted that he has agreed to re-join the Board as a Non-executive
Director in January 2026.
Mr Matthew Dusci, our current Chief Operating Officer, will assume the role of Managing Director, effective
from 1 October 2025. Mr Dusci has more than 25 years of experience in the resources industry, including in
the operational and corporate spheres, and has held several senior executive positions.
Subsequent to the end of the financial year, we advised the market that during the annual budgeting exercise
for FY26, we assessed updated technical and financial information related to mineral resource continuity and
potential wellfield performance compared to the Enhanced Feasibility Study. The team, with the support of
independent specialists, are completing a review of this and will continue to keep the market informed.
Looking ahead, the outlook for nuclear energy is stronger than ever. Governments around the world are turning
to uranium as a source of baseload, zero-emissions power. From AI data centres and electric grids to emerging
small modular reactors, demand for uranium is rising and supply remains constrained. Boss is extremely wellplaced to capitalise on this opportunity.
I would like to acknowledge and pay our respects to the Traditional Owner groups, the Ngadjuri,
Adnyamathanha & Wilyakali, on whose land our operations in Australia are situated. Their support, consent
and agreement has enabled us to bring the Honeymoon Uranium Operation back into production.
And on behalf of the Board, I thank our shareholders for their ongoing support as we seek to maximise the
opportunities we have across our growing asset base.
Yours sincerely,
Wyatt Buck
Chairman
ANNUAL REPORT 2025
PAGE 5 of 104
ANNUAL REPORT 2025
Review of Operations
Boss Energy Limited (“Boss Energy” or the ‘Company") has become a global multi-mine uranium producer,
with the Honeymoon and Alta Mesa Operations now in production. A review of each operation is set out below.
Honeymoon Uranium Operation (100% ownership)
FY25 marked a pivotal year in Boss Energy’s transition from developer to uranium producer. Following the
restart of operations at the Honeymoon Uranium Operation in April 2024, the Company successfully ramped
up production over the course of FY25, delivering outcomes that exceeded H2 FY25 guidance and established
a platform for future growth. The key operational milestones completed in FY25 were:
• Production of 872Klbs of U₃O₈, exceeding FY25 guidance of 850Klbs.
• Completion of construction and commissioning of Wellfields B1 to B3, forming the foundation of FY25
production. Construction of wellfield B4 is also complete with wellfield production preparation
underway.
• Commissioning and operation of NIMCIX Columns 1–3, with work underway for Columns 4–6 which
are expected to complete in FY26.
• First quarter of positive free cash flow.
• C1 cash costs of A$35/lb (US$23/lb), outperforming H2 FY25 guidance of A$37–41/lb.
• First uranium deliveries to the Honeywell Uranium Hexafluoride Processing Facility located in
Metropolis, Illinois, US.
• First sales recorded, with total revenue for the financial year of $75.6 million. Boss Energy’s sales
strategy to remain strategically under contracted has continued to ensure that Boss Energy is well
positioned to benefit from rising uranium prices.
• Ongoing investment in asset growth, with wellfield development, NIMCIX columns and permitting
activity.
Boss Energy also commenced delineation drilling at the East Kalkaroo domain and made progress on design
planning for future wellfields. While early operating data has revealed some variability in mineralisation and
leachability relative to feasibility study assumptions, this information will be subject to an independent review.
Further detail is set out in the Material Business Risks and Mitigations section below.
Operational performance in FY25 demonstrates Boss Energy’s capability to transition from project developer
to disciplined uranium producer, while establishing the foundations for future production.
Development Milestones
Boss Energy continued to construct and commission operating infrastructure in parallel to uranium production
at the Honeymoon Uranium Operation. Key milestones and accomplishments over the period are:
• Construction completion, commissioning, and concurrent operation of the first three NIMCIX columns
for Train 1.
• Columns 4, 5 & 6 have been erected with transfer vessels, piping and electrical remaining to
complete the columns.
• Commissioning and operation of the second reverse osmosis plant and reagent tanks to support
future wellfields being brought online.
• Continuous ongoing improvements and debottlenecking.
ANNUAL REPORT 2025
PAGE 6 of 104
ANNUAL REPORT 2025
Alta Mesa Operation (30 per cent ownership)
The Alta Mesa Operation is a 30/70 joint venture, with enCore Energy Corp (TSX.V:EU; NYSE:EU) (enCore)
acting as the manager, in-situ recovery (ISR) operation in South Texas, a prolific United States of America
(US) district for sandstone-hosted ISR production, having produced ~80Mlb historically.1 South Texas is the
most progressive permitting production jurisdiction in the US.
Key highlights for FY25 include:
• Production recommenced in June 2024 following successful refurbishment of the Central Processing
Facility and installation of new wellfields.
• The first ion exchange (IX) circuit is now operating at nameplate capacity, the second IX circuit was
commissioned in the March 2025 quarter.
• Receipt of 108K lbs of U₃O₈ reflecting Boss Energy’s 30% pro rata share of production. Boss Energy
retains full marketing flexibility, allowing it to independently contract and sell its share of production.
During the March 2025 quarter, enCore, as operator of the Joint Venture, reported that the ramp-up to
nameplate production was impacted by wellfield performance. In response, steps were taken to accelerate
wellfield development and improve wellfield planning and operations. These changes contributed to improved
production outcomes in the June 2025 quarter, including the highest uranium capture rates since restart with
204Klbs extracted (up from 114Klbs extracted in the March 2025 quarter).
Uranium Market Analysis
The uranium market remained dynamic throughout FY25, underpinned by intensifying geopolitical
developments, an evolving global energy mix, and renewed support for nuclear power as a critical component
of clean, reliable baseload energy.
The spot uranium prices showed considerable volatility over the course of FY25. The spot price declined from
US$85.5 to US$78.5 and the TradeTech term price increased from US$79/lb to US$80/lb.2 The average spot
price for 2025 to date was US$73.8/lb, down ~9.3% compared to the 2024 average of US$81.4/lb, but still
materially above long-term historical levels.
There has been growing institutional and policy support for nuclear energy, particularly in the US, with
executive orders outlining an accelerated timeline for deployment of nuclear technologies. The World Bank’s
decision to lift its ban on funding nuclear energy projects may unlock future financing pathways for developing
countries and further stimulate demand. Trade tensions, including proposed US tariffs on imports from
Kazakhstan and Canada, continued to generate uncertainty around nuclear fuel supply chains, though uranium
remains exempt from several tariff regimes.
The uranium market outlook remains robust. According to UxC, cumulative global demand through 2045 is
projected to rise in both the base and low demand scenarios, reflecting expanding nuclear reactor capacity,
particularly in Asia.3 China in particular continues to lead the global expansion with a target of 200 GW
nuclear capacity by 2040 (double the US’s current level) and accounts for roughly half of the world’s reactors
under construction. Financial participation also remains a market mover, with the Sprott Physical Uranium
Trust purchasing over 1.4 million pounds U₃O₈ in June alone.
There is strong interest from utilities in the supply of uranium from politically stable countries. Boss Energy,
as a new producer located in South Australia, is ideally positioned to benefit from the high level of contracting
that is necessary to meet unfilled utility demand in the coming years.
1
enCore presentation November 2023 https://encoreuranium.com/wp-content/uploads/2023/11/EU-Corporate-Deck-FINAL-Nov-1723.pdf
2 From 30 June 2024 to 30 June 2025
3 UxC, LLC. (2025). Uranium Market Outlook: Q2 2025. Roswell, GA: UxC, LLC.
ANNUAL REPORT 2025
PAGE 7 of 104
ANNUAL REPORT 2025
Exploration and evaluation activities
In parallel with operational ramp-up, Boss Energy advanced its regional growth pipeline. These initiatives align
with Boss Energy’s objective to build a multi-asset uranium business with long-term production optionality.
• Resource development drilling was undertaken at Jason’s, Gould’s Dam and other satellite deposits
during FY25 to enable feasibility studies and the application for a mining license for these deposits.
Mineral Resource Estimates (MREs) for Gould’s Dam and Jason’s were progressed and are
expected to be released in FY26.
• Increased ownership to 19.9% of Laramide Resources, providing exposure to the Westmoreland
Uranium Project in Queensland.
• Entered into a staged joint venture with Eclipse Metals to earn up to 80% of the Liverpool Uranium
Project in the NT.
• Continued greenfield exploration at Lake Constance, Cummins, Sarah and Picnic Dams. Whilst initial
results are unlikely to support future deposits, Boss Energy has been implementing innovative drilling
techniques such as Aircore drilling and driller-operated gamma radiation probes, to reduce costs and
environmental impact.
Key Appointments
Boss Energy continued to strengthen its senior management team during the year to ensure that the team
remains stage-appropriate to reflect the increased complexity of the business associated with becoming a
multi-mine producer in two tier one jurisdictions. During FY25, the following changes occurred in the
Company’s leadership and governance structure:
• Mr Craib announced his intention to step down as Managing Director and Chief Executive Officer,
effective 30 September 2025 after nearly 9 years of service. Mr Craib has played a pivotal role in
transforming Boss Energy into Australia’s newest uranium producer and leaves a legacy of
disciplined execution and market leadership. The Board has invited Mr Craib, and Mr Craib has
agreed, to remain with the Company as a Non-Executive Director from 1 January 2026.
• Mr Dusci, currently Chief Operating Officer, will succeed Mr Craib as Managing Director and CEO
effective 1 October 2025. Mr Dusci brings over 25 years of mining industry experience, including
executive roles at IGO Limited, most recently as acting CEO.
• Ms Joanne Palmer and Ms Caroline Keats were appointed to the Board as Independent NonExecutive Directors on 1 June 2025, strengthening the Board’s expertise in audit, governance, and
mining operations.
• Mr Bryn Jones retired from the Board effective 2 June 2025. The Board thanks Mr Jones for his
valuable contributions to the Company.
These changes reflect the Company’s transition into an operating phase and its ongoing commitment to strong
governance and succession planning.
Outlook
Boss Energy enters FY26 following another year of progress. While challenges have emerged that may impact
long-term production planning, the Company remains focused on:
• Executing FY26 Guidance of 1.6Mlbs production, C1 cost between $41-45/lb and an all in sustaining
cost of between $64-70/lb.4
4
Refer to Boss Energy announcement on 28 July 2025 titled “Honeymoon FY26 Guidance” for further information.
ANNUAL REPORT 2025
PAGE 8 of 104
ANNUAL REPORT 2025
• Advancing geological and technical understanding to support Honeymoon Uranium Operation lifeof-mine planning.
• Progressing technical studies and permitting on the Jasons and Goulds Dam satellite deposits.
• Increasing technical capability within the geology and wellfields teams to better enable resource
optimisation.
Boss Energy has a robust balance sheet, capable leadership, and exposure to movements in the uranium
price.
Forward-Looking Statements
This report includes forward-looking statements. These forward-looking statements are based on the
Company’s expectations and beliefs concerning future events. Forward-looking statements are necessarily
subject to risks, uncertainties and other factors, many of which are outside the control of Boss Energy, which
could cause actual results to differ materially from such statements. Boss Energy makes no undertaking to
subsequently update or revise the forward-looking statements made in this announcement, to reflect the
circumstances or events after the date of this announcement.
ANNUAL REPORT 2025
PAGE 9 of 104
ANNUAL REPORT 2025
Mineral Resource Statement
The following information is provided in accordance with Listing Rule 5.21.
Mineral Resource Estimation Governance Statement
Boss Energy reports its Mineral Resources in accordance with the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (JORC Code 2012 Edition).
Boss Energy ensures that the Mineral Resource estimates are subject to appropriate levels of governance and
internal controls. The Mineral Resource estimates tabulated below have been generated by consultants of the
Company who are experienced in best practices in modelling and estimation methods. Company personnel
have undertaken reviews of the quality and suitability of the underlying information used to generate the
resource estimations. The Mineral Resource estimates follow standard industry methodology involving rotary
mud drilling and use of uranium grade data derived from calibrated Prompt Fission Neutron and (for some preBoss Energy drilling) gamma probes. Comparison of PFN and gamma data permit assessment of radiometric
disequilibrium and appropriate corrections to be applied to historic gamma data.
Changes to the Honeymoon Uranium Operation Mineral Resource estimate since 30 June 2024 were solely
as a result of depletion of the Measured category of the Honeymoon resource due to production from several
wellfields during the year (1,002,918 lb U 3O8) and the latter part of the previous year (61,561 lb U 3O8) and
such changes are considered to be non-material by Boss Energy.
Additionally, new drilling including at the satellite deposits of Gould’s Dam and Jason’s was conducted during
the year aimed at further deposit delineation and wellfield planning. The results and implications of this drilling
are currently being evaluated. Boss Energy’s current Mineral Resource estimate will be reviewed and updated
as part of the independent review process announced by Boss Energy on 28 July 2025 in the announcement
titled “Honeymoon FY26 Guidance”.
Honeymoon Uranium Operation Mineral Resource at 30 June 2025
Lower cut-off of 250 ppm U3O8
Resource
Classification
Tonnage
(Million Tonnes)
Average Grade
(ppm U3O8)
Contained Metal
(Kt, U3O8)
Contained Metal
(Mlb, U3O8)
4.9
10.7
Jason’s (March 2017)
Inferred
6.2
790
Gould’s Dam (April 2016)
Indicated
4.4
650
2.9
6.4
Inferred
17.7
480
8.5
18.7
Honeymoon (January 2019) – Depleted for Production to June 30th 2025
Measured
2.7
1,100
2.9
6.5
Indicated
14.0
610
8.7
19.0
Inferred
7.0
590
4.1
9.1
Production from Honeymoon (to 30 June 2025)
U3O8 Drummed
-
-
0.5
1.1
TOTAL HONEYMOON URANIUM OPERATION
Measured
2.7
1,100
2.9
6.5
Indicated
18.4
630
12.0
25.4
Inferred
30.9
570
18.0
38.5
Total
52.0
620
32.0
70.4
ANNUAL REPORT 2025
PAGE 10 of 104
ANNUAL REPORT 2025
Alta Mesa Uranium Project
Boss Energy also holds a 30% interest in the Alta Mesa Uranium Project in Texas (comprising Alta Mesa and
Mesteña Grande) through its joint venture with encore Energy Corp. Refer to Boss Energy’s announcements
titled “Boss Energy set to become a multi-mine uranium producer in 1H2024” dated 6 December 2023 and
“Amended – encore Energy Announces Filing of S-K 1300 Technical Report Summaries” dated 28 February
2025 for further information.
The mineral resource estimate for the Alta Mesa Uranium Project as previously reported by Boss Energy is a
foreign estimate prepared in accordance with Canadian National Instrument 43-101 and is not an estimate
reported in accordance with JORC. A competent person has yet to complete sufficient work to classify the
resources in a way that satisfy the guidelines provided by the JORC Code. It is uncertain if further evaluation
and additional exploration work will enable the foreign estimate to be reported as a mineral resource in
accordance with the JORC Code.
Evaluation of the Alta Mesa and Mestena Grande resources has been initiated with a view to the company
restating these resources in compliance with JORC as required by ASX Listing Rule 5.14.1. The evaluation is
primarily in the form of a desktop review of drilling data and underpinning downhole geophysical data used for
grade estimation, but also involved a field visit in May 2025 by Boss Energy staff to observe enCore’s rotary
mud drilling and downhole logging practices.
ANNUAL REPORT 2025
PAGE 11 of 104
ANNUAL REPORT 2025
Competent Person Statements
The Competent Person for the 2016 Gould’s Dam and 2017 Jason’s Mineral Resource Estimates is Dr Marat
Abzalov, a Fellow of the Australian Institute of Mining & Metallurgy. He has sufficient expertise in estimating
uranium resources and in all aspects of data collection, interpretation and geostatistical analysis to qualify as
a Competent Person as defined in the 2012 Edition of the JORC code. Dr Abzalov is a former Executive
Director Geology of Boss Resources (the former name of Boss Energy) but prepared both the 2016 Gould’s
Dam and 2017 Jason’s Mineral Resource Estimates as an independent consultant under the business name
MASSA Geoservices (Australia). The resources reported here are presented without change.
The 2019 Honeymoon Mineral Resource Estimate was compiled by Mr Ingvar Kirchner, a Competent Person
who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr Kirchner, who is currently
the Geology and Corporate manager of consultancy AMC, has sufficient experience which is relevant to the
style of mineralisation and type of deposit under consideration and to the activity undertaken, to qualify as a
Competent Person as defined in the 2012 Edition of the JORC code. Mr Kirchner does not hold shares in the
Company.
The Competent Person responsible for all drillhole data, QA/QC and geological aspects related to the 2019
Honeymoon Mineral Resource Estimate is Ms Asha Rao, former Boss Energy Geology Manager and member
of the AusIMM and Australian Institute of Geoscientists. Ms Rao has sufficient experience relevant to the style
of mineralisation and type of deposit under consideration and to the activities which she undertook, to qualify
as a Competent Person as defined in the 2012 Edition of the JORC code. Ms. Rao has held shares in the
Company since her departure in 2021.
The Mineral Resources Statement included in this Annual Report is based on, and fairly represents,
information and supporting documentation prepared by Dr Marat Abzalov, Mr Ingvar Kirchner and Ms Asha
Rao. The Mineral Resources Statement as a whole has been approved by Dr Marat Abzalov, Mr Ingvar
Kirchner and Ms Asha Rao. The Mineral Resources statement is issued with the prior written consent of Dr
Marat Abzalov, Mr Ingvar Kirchner and Ms Asha Rao as to the form and context in which it appears in the
Annual Report.
ANNUAL REPORT 2025
PAGE 12 of 104
ANNUAL REPORT 2025
Directors’ Report
The Directors present their report together with the consolidated financial statements of the Group comprising
of Boss Energy and its subsidiaries (“the Group”) for the reporting period ended 30 June 2025 and the auditor’s
report thereon. The Directors’ report and consolidated financial statements are presented in Australian dollars,
except where otherwise indicated.
Directors
The names and details of the Company’s directors in office during the reporting period and until the date of
this report are as follows. Directors were in office for the entire period unless otherwise stated.
Mr Wyatt Buck | Non-Executive Chairman
Appointed Chairman 31 March 2023 (appointed as Director 1 October 2020)
Mr Buck’s uranium experience began with Cameco Corporation, where he was employed for 15 years between
1991- 2006 in various roles, culminating as GM of the McArthur River Uranium Mine and Key Lake Mill, the
largest uranium mining operation in the world. He then held senior operational roles with Paladin Energy Ltd
(ASX: PDN) as General Manager and Managing Director of the Langer Heinrich Uranium Project in Namibia
from the commencement of construction in February 2006 through to design level production. From September
2009 to May 2011, Mr Buck was Executive GM Operations at Paladin with direct operational responsibility for
its Langer Heinrich and Kayelekera uranium projects
Share your feedback
Discover