enCore Energy to Expand Alta Mesa Uranium Project
Released
Released
Announcement PDF
ASX Release August 19, 2025
enCore Energy to Expand Alta Mesa
Uranium Project
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) advises that enCore Energy Corp (NASDAQ: EU; TSXV: EU)
(enCore) has published an update on its plan to expand the Alta Mesa Uranium Project in Texas, US
enCore is the operator and 70 per cent-owner of the Alta Mesa Uranium Project in Texas. Boss owns the
remaining 30 per cent of the project and receives 30 per cent of the mine’s uranium production.
In its update, enCore said it had acquired a 5900 acre parcel of private land (Tacubaya) located
immediately next to the Alta Mesa wellfields and Central Processing Plant. Tacubaya is expected to
provide additional feed and increase the life of the Alta Mesa ISR Uranium Central Processing Plant.
Highlights of the Tacubaya acquisition include:
•
Over 5,900 acres of private land consisting of mineral and surface leases immediately next to the Alta
Mesa Uranium Project
•
Tacubaya’s uranium mineralisation occurs as roll fronts in multiple stacked sands within the Goliad
Formation just as it does at the Alta Mesa Uranium Project; and
•
Additional exploration will be required to fully explore and delineate uranium mineralisation on
Tacubaya. Initial exploration will include a 200-hole drilling program beginning in two key areas
utilising several rigs. Two rigs will begin drilling in mid-October 2025, with an additional two drill rigs
being added as the program progresses.
Please refer to enCore’s announcement dated August 18, 2025 for further information1.
This ASX announcement was approved and authorised by the CEO of Boss Energy Limited.
For further information, contact:
Duncan Craib
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
1
enCore Energy Corp. announcement titled ‘enCore Energy Announces Expansion of the Alta Mesa Uranium Project.’ dated August 18,
https://www.nasdaq.com/press-release/encore-energy-announces-expansion-alta-mesa-uranium-project-2025-08-18
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Duncan Craib - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Paul Armstrong – Public Relations
+61 (08) 9388 1474
www.bossenergy.com
@Boss_Energy
Forward-Looking Statements
This announcement includes forward-looking statements. These forward-looking statements are based
on the Company’s expectations and beliefs concerning future events. Forward-looking statements are
necessarily subject to risks, uncertainties, and other factors, many of which are outside the control of Boss
Energy, which could cause actual results to differ materially from such statements. Boss Energy makes no
undertaking to subsequently update or revise the forward-looking statements made in this
announcement, to reflect the circumstances or events after the date of this announcement.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Share your feedback
Discover