Boss Energy Investor Presentation - March 2026
Released
Released
Announcement PDF
ASX Release 23 March 2026
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Matthew Dusci - Managing Director/ CEO
+61 (08) 6263 4494
Paul Armstrong – Media Relations
+61 (08) 9388 1474
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Boss Energy Investor Presentation
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) is pleased to provide a copy of our investor
presentation to be delivered by Managing Director and CEO Mr Matthew Dusci, at the UBS Mid &
Emerging Resources Day, Sydney on Monday, 23 March 2026 and; the Shaw & Partners 8th
Uranium
Conference on Tuesday, 24 March 2026.
The presentation includes an update on activities associated with the delivery of the New Feasibility
Study.
This ASX announcement is approved and authorised for release to the ASX by Managing Director and
CEO, Matthew Dusci.
For further information, contact:
Matthew Dusci
Managing Director
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
A global multi-mine Uranium producer
ASX: BOE | OTCQX: BQSSF
bossenergy.com
Investor Presentation
23 March 2026
Boss Energy | A global multi-mine Uranium producer 2
Multi-mine Uranium Producer
Uniquely positioned to drive shareholder value
Australia’s only ASX-listed
uranium company
producing in Australia
Developed uranium
operational expertise and
increasing application of
technology for ISR
Operating assets based in
Australia and US
Strong balance sheet of
$208M1 including strategic
uranium inventory
Notes
1: Cash and liquid assets as at 31 December 2025.
Boss Energy | A global multi-mine Uranium producer 3
Value Realisation
from Existing Assets
Unlock Value from
Satellite Deposits
Optimise & Maximise
Honeymoon
Clear Focus & Defined Pathway: Unlocking Shareholder Value.
Our Critical Focus Areas
A clear pathway to drive value
Capital / Inventory
Management
Continue to build our
uranium strategic
inventory.
Disciplined capital
management.
Preservation and further
strengthening our
balance sheet.
Alta Mesa JV
Maximise value
from the
Alta Mesa
Joint Venture.
Gould’s Dam & Jason’s Deposit
Significant Mineral Resource (45Mlbs)1 to be unlocked.
Wide-spaced wellfield design likely to be applicable.
Acceleration of development pathway.
Honeymoon
Operation
Consistent and safe
delivery of production
guidance.
Continue to deliver
operational
improvements and cost
reductions.
Honeymoon New
Feasibility Study
Completion of New
Feasibility Study.
Wide-spaced wellfield
design has potential to
lower costs, increase
production, and extend
mine life.
Notes: 1. Refer to ASX announcement dated 19 March 2026 titled “Gould’s Dam and Jason’s Deposit Mineral Resource and Permitting Update” for detail.
Boss Energy | A global multi-mine Uranium producer 4
Driving Innovation and Technology
Adopting and modifying sophisticated
modelling technologies.
Challenging our approach and understanding
Proven Operational Leadership
Demonstrated operational capacity
and experience.
Unique position with Australian uranium operations expertise
Strengthening ISR Capability
Developing unique expertise and deep
technical capacity in ISR.
Unlock the resource potential
Leveraging Existing Infrastructure
Existing operating
infrastructure in place.
Fully-funded for organic growth
Delivery is being achieved through
Value being driven by
Deep Understanding
Utilising extensive operating datasets
to provide deep understanding.
Derisking operations and future decisions
Laser-focused on value
Focused on value through studies,
cost, and efficiencies
Clear analysis and decisions to drive shareholder value
Boss Energy | A global multi-mine Uranium producer 5
Assumptions
Our understanding of the assumptions
underpinning the current wellfield
design was changing.
New Feasibility Study
Identified our pathway forward and initiated a New Feasibility Study to validate
The Challenge: Identified through Honeymoon Review1
Mineralisation
There is extensive lower-grade
mineralisation that could be mined.
Cost structure
Need to fundamentally change the cost
structure to access lower-grade.
Our Potential Pathway Forward: Wide spaced wellfield design1
Notes: 1. Refer to ASX announcement dated 18 December 2025 titled “Honeymoon Update - Amended” for detail regarding conclusion of the Honeymoon Review and Initiation of a New Feasibility Study (NFS)
Boss Energy | A global multi-mine Uranium producer 6
Increase in well spacing design is expected to potentially reduce cost, lower cutoff and increase resource under leach
Wide-spaced Wellfield Design
A wide-spaced wellfield design could materially improve economics for low-grade
Reduce cost: Through less wellfield
infrastructure per m2 and fewer PVE
(less reagents).
Injection well
Extraction well
Wide spacing
Extraction well
Current spacing
Lower cutoff: As cost reduces,
lower grade resource can be put
under leach.
Current-spacing
Faster flow velocity, shorter
residence time and more pore
volume exchanges (PVE).
Wide-spacing
Slower flow velocity, longer distance travelled
resulting in longer residence time and contact
with more uranium mineralisation, fewer PVE.
Increase resource under leach: A
lower cutoff will bring additional
resource into the production
profile.
~30-40m
~55m-70m
Boss Energy | A global multi-mine Uranium producer 7
Continue to confirm our assumptions
Current understanding continues to be validated through technical studies
New Feasibility Study - Statement (Dec 25)1 Status Next Steps
Significant metal with good continuity, at
lower-grades.
• First of the internal 3D resource block
models completed.
• Resource delineation drilling ongoing.
• Updated interim JORC MRE and
continuation of delineation
drilling.
Good permeability & hydraulic connectivity
(flow rates and lixiviant control &
interaction).
• Completed 3D model of permeability
and initial Reactive Transport
Simulations.
• Commenced establishment of trial
patterns and wellfields.
• Continuation of modelling.
• Finalise the establishment of trial
wellfields.
Relatively low acid consumption given low
carbonate content and low acid-consuming
clays.
• Commenced additional mineral
characterisation and testwork.
• Completed initial Reactive Transport
Simulations with current wellfield
calibration.
• Refine inputs into the model and
run simulations with various
characteristics to test sensitivity.
Plume and groundwater behaviour
preventing excessive dilution of reagents.
• Completed initial Reactive Transport
Simulations on current Honeymoon
wellfields.
• Continual refinement of model
and assumptions
Honeymoon Deposit Characteristics – Current Understanding
Significant work being completed continues to support and derisk our Pathway Forward
Notes: 1. Refer to ASX announcement dated 18 December 2025 titled “Honeymoon Update - Amended” for detail.
Boss Energy | A global multi-mine Uranium producer 8
A “step-change” in our approach
Leading approach to ISR modelling
Wellfield Screens and Streamlines (Honeymoon)
• Reactive transport simulations is a computational technique that simulates the
movement of fluids and transport of dissolved chemical species through
porous substrate while simultaneously accounting for geochemical reactions.
• Development of the code commenced in the 1990 for safety assessment of
nuclear waste disposal in Europe.
• Typically used in highly complex studies associated with nuclear waste storage,
gas aquifer storage and environmental impact studies and applicable for ISR
Mining.
• Powerful tool for predicting fluid flow and geochemical reactions in the aquifer.
Reactive Transport Simulations
Boss Energy | A global multi-mine Uranium producer 9
Forming part of the New Feasibility Study
Coupling hydrodynamics with chemical interactions between the fluid and host sequence
Permeability Distribution
Grade Distribution
Wellfield Design & Flow Rates
Fluid Flow (Streamlines)
pH (Mineral Dissolution / Dilution)
Uranium Depletion
1. Key inputs
• Hydrodynamic parameters
• Uranium distribution
• Spatial distribution of reactive minerals
• Wellfield Design (screen intervals,
injector & extractor locations)
• Flow rates (over time)
• Lixiviant chemistry
• Mineral kinetics
3. Key outputs
• Hydrodynamic behaviors
• pH evolution
• Plume chemistry
• Uranium leaching
• Mineral dissolution and precipitation
• Transportation of dissolved uranium
• Uranium pathway and extractor PLS
production
2. Reactive transport simulations
2 x Higher Performance Compute Nodes
(Singapore)
Boss Energy | A global multi-mine Uranium producer 10
Wide-spaced Wellfields - Honeymoon
Wide-spaced patterns are being established at Honeymoon
Honeymoon Domain: Wellfield Designs
• Low-grade resource in uncontacted aquifer.
• Four 5-spot patterns.
• 71m injector to extractor wells (LxW: 100m x
100m).
• Large area => Pre-conditioning time 3 months.
• Investigating incremental solutions and trade-offs
to accelerate timing.
HMT1
HMT2
• Low-grade resource.
• Likely contacted by lixiviant from B2 and B3.
• 55m injector to extractor wells.
• Will provide quicker results as no pre-conditioning
is required.
HME1
• Extension pattern.
• Captures learnings on fluid movement.
Boss Energy | A global multi-mine Uranium producer 11
Wide-spaced Wellfield - East Kalkaroo
Modifications to existing wellfield designs to accelerate wide-spaced patters
East Kalkaroo Domain: Previous wellfield design East Kalkaroo Domain: Current wellfield trial design
• Spacing: Injector to extractor 30m (LxW: 42m x 42m).
• Infrastructure: Repurposed where possible.
• B6: Remains as is to get data that is like for like to HM.
• Spacing: Injector to extractor 60m (LxW: 85m x 85m). One pattern
covers 4x the surface area of a pattern under the old design.
• Infrastructure: New larger wellfield, combining B7 & B9.
Boss Energy | A global multi-mine Uranium producer 12
Gould’s Dam
The early development of the satellite deposits has been accelerated
Resource Category1
Ore Grade Metal
Mt ppm U3O8 kt U3O8 Mlbs U3O8
GOULD'S DAM
Indicated 7.5 465 3.5 7.7
Inferred 31.2 369 11.5 25.4
TOTAL 38.7 388 15.0 33.1
Mineral Resource update follows additional drilling and
improved understanding gained from the Honeymoon
Operation.
• Mineralisation is generally hosted in highly permeable unconsolidated sands with the
Mineral Resource constrained to permeable sequence considered amenable to in-situ
recovery (ISR) mining.
• The wide-spaced wellfield extraction approach being studied for Honeymoon is likely
to be applicable to Gould’s Dam, which could potentially lead to conversion of a
material portion of the total Mineral Resource into a mine plan if successful.
• Mineral Resource update follows additional drilling and improved understanding
gained from the Honeymoon Operation. Total contained uranium has increased by
8.1Mlbs U3O8 (30%) and average grade has declined by 122ppm U3O8 (24%) from the
previous resource estimate (2016).
Notes
1: Refer to ASX announcement dated 19 March 2026 titled “Gould’s Dam and
Jason’s Deposit Mineral Resource and Permitting Update” for detail.
• Development pathway for both Gould’s Dam and Jason’s Deposit accelerated over the
past six months with all baseline and technical studies for permitting applications
being advanced.
Boss Energy | A global multi-mine Uranium producer 13
Jason’s Deposit
The early development of the satellite deposits has been accelerated
• Update follows additional drilling and improved geological and
mineralisation understanding.
• Total contained uranium increased by 1.3Mlbs U3O8 (9%) and
average grade has declined by 380ppm U3O8 (48%) from the
previous resource estimate (2017).
• Mineralisation remains open, providing scope for additional drilling
upside.
• The wide-spaced wellfield extraction approach being studied for
Honeymoon is likely to be applicable to Jason’s Deposit, which could
potentially lead to conversion of a material portion of the total
Mineral Resource into a mine plan if successful.
Resource
Category1
Ore Grade Metal
Mt ppm U3O8 kt U3O8 Mlbs U3O8
JASON’S DEPOSIT
Indicated 4.8 464 2.2 4.9
Inferred 8.5 380 3.2 7.1
TOTAL 13.3 410 5.4 12.0
Notes
1: Refer to ASX announcement dated 19 March 2026 titled “Gould’s Dam and Jason’s Deposit Mineral
Resource and Permitting Update” for detail.
Boss Energy | A global multi-mine Uranium producer 14
Key Milestones
Accelerated parallel activities over the past 6 months
Key programs of work Q1CY26 Q2CY26 Q3CY26 Q4CY26 Q1CY27 Q2CY27 Q3CY27
Honeymoon Project:
• Accelerated Honeymoon delineation drilling
• Scoping Study
• New Feasibility Study
Goulds Dam & Jason’s Deposit
• Baseline data collection, modeling and
assessment
• Resource definition drilling
• Commence State and Federal permitting
• Prefeasibility Study
Current date (Q1 CY26)
Boss Energy | A global multi-mine Uranium producer 15
Honeymoon Production
Honeymoon Quarterly Production
Soft Q3FY26 with recent rain interruption events
• Q3FY26: Expect lower production (240-270klbs) vs Q2FY26, driven by the expected decline in average tenor, significant rain events and continued wet
weather.
• Q4FY26: Expect record drummed production (490-520klbs) enabled by 6x wellfields and 5x columns, which are expected to be online by the end of the
quarter.
0
100,000
200,000
300,000
400,000
500,000
600,000
4Q24 1Q25 2Q25 3Q25 4Q25 1Q26 2Q26 3Q26E* 4Q26E*
lbs
IX Production U3O8 Drummed
Notes: *Estimated quarterly production based on low end of Q3 guidance range of 240klbs to 270klbs. Refer to ASX announcement dated 5 March 2026 titled “Rain impacts Honeymoon production” for detail.
Boss Energy | A global multi-mine Uranium producer 16
Financial Strength
Balance sheet strength and potentially improving unit economics from wide-spaced design
Financial Position ($000’s) 1HFY26 Comments
Cash on hand 52,857 Provides working capital to support operations.
Investments and other liquid assets 44,912 Strategic investments (primarily Laramide Resources) for long term optionality.
Inventory on hand 110,236 Strategic holding of 1.6Mlbs for future upside in price and could support future value accretive growth.
Total cash and liquid assets 208,005
Cash flow waterfall (6 months to 31 December 2025)
Accumulate
inventory1
Capital and operating
costs for FY27 and
beyond will be
better understood
once NFS is complete
No
ongoing
cost from
FY27
• Strong balance sheet
will fully support
potential transition to
wide-spaced wellfield
design.
• Wide-spaced wellfield
design could
potentially drive
strong ongoing
wellfield unit
economics.
Notes: 1: Boss has accumulated all Alta Mesa JV inventory with 222klbs of Alta Mesa JV inventory on hand at 31 December 2025 i.e. no sales of inventory from the Alta Mesa JV executed.
Boss Energy | A global multi-mine Uranium producer 17
Summary
Accelerated activities continue to support pathway forward and potential for growth
• Clear focus on strategic programs of work to drive shareholder value.
• Wide-spaced wellfield design applicable for satellite deposits with potential
to lead to higher conversion of resource into mine plan.
• Softer quarter production from Honeymoon in Q3FY26 with rain impacts.
• Work to-date continues to support and derisk our pathway forward through
wide-spaced wellfields.
• Delivery of New Feasibility Study scheduled for Q3CY26.
18
Boss Energy | A global multi-mine Uranium producer
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (Boss Energy or
Company).
NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the
recipient’s investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent
assessment and investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should
not rely on any statement or the adequacy and accuracy of any information. This Presentation is in summary form and does not
purpose to be exhaustive. This Presentation should be read in conjunction with Boss Energy’s periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of
the Information. Boss Energy and its directors, employees, agents and consultants shall have no liability (including liability to any
person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or
implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute that
can not be excluded.
FORWARD LOOKING STATEMENTS
All dollar amounts are in Australian dollars unless otherwise indicated. This announcement may contain certain statements and
projections provided by or on behalf of Boss Energy Limited with respect to the anticipated future undertakings. These forward-
looking statements reflect various assumptions by or on behalf of Boss Energy. Accordingly, these statements are subject to
significant business, economic and competitive uncertainties and contingencies associated with the mining industry which may be
beyond the control of Boss Energy which could cause actual results or trends to differ materially, including but not limited to price
and currency fluctuations, geotechnical factors, drilling and production results, development progress, operating results, reserve
estimates, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries, approvals
and cost estimates, environmental risks, ability to meet funding requirements, share price volatility. Accordingly, there can be no
assurance that such statements and projections will be realised. Boss Energy makes no representations as to the accuracy or
completeness of any such statement of projections or that any forecasts will be achieved. Additionally, Boss Energy makes no
representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under
statute or otherwise) is or will be accepted by Boss Energy or by any of their respective officers, directors, shareholders, partners,
employees, or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions or matters
(express or implied) arising out of, contained in or derived from this announcement or any omission from this announcement or of
any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In furnishing
this announcement, Boss Energy undertakes no obligation to provide any additional or updated information whether as a result of
new information, future events or results or otherwise. Nothing in this material should be construed as either an offer to sell or a
solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in isolation as a
basis to invest in Boss Energy.
EFFECT OF ROUNDING
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
PAST PERFORMANCE
Past performance information, including past share price performance of Boss Energy and pro forma financial information, given in this
Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss Energy’s (or anyone
else’s) views on Boss Energy’s future financial performance or condition. Past performance of Boss Energy cannot be relied upon as an
indicator of (and provides no guidance as to) the future performance of Boss Energy. Nothing contained in this Presentation nor any
information made available to you is, or shall be relied upon as a promise, representation, warranty or guarantee, whether as to the past,
present or future.
MINERAL RESOURCE STATEMENT
The mineral resource estimates in this announcement were reported by the Company in accordance with ASX Listing Rules 5.8 and 5.22 on
19 March 2026 (see the Company's ASX announcement titled "Gould's Dam & Jason's Mineral Resource & Permitting Update", which is
available on the Company's website: bossenergy.com). In accordance with ASX Listing Rule 5.23, the Company confirms it is not aware of any
new information or data that materially affects the information included in the previous announcement and that all material assumptions
and technical parameters underpinning the estimates in the previous announcement continue to apply and have not materially changed.
JORC CODE
It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the Joint Ore
Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves ("JORC Code"). Investors outside Australia
should note that while the mineral resource estimates of the Company contained in this Presentation comply with the JORC Code, they may
not comply with the relevant guidelines in other countries and, in particular, do not comply with: (i) National Instrument 43-101 (Standards
of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the "Canadian NI 43-101 Standards"); or (ii) Subpart 1300 of
Regulation S-K, which governs disclosures of mineral reserves in registration statements filed with the United States Securities and Exchange
Commission. As such, information contained in this Presentation describing mineral reserves may not be comparable to similar information
contained in announcements by companies that are subject to the reporting and disclosure requirements of other countries, including
Canadian or United States securities laws.
COMPETENT PERSON STATEMENT
The information contained in this announcement that relates to exploration results, data, geology, and QAQC is provided by Mr Jason
Cherry, who is a Member of the Australian Institute of Geoscientists (AIG). Mr Cherry has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person, as defined in
the JORC Code 2012 edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Cherry has 19 years’
experience and is a full-time employee as Exploration Manager – South Australia for Boss. Mr Cherry consents to the inclusion in this report
of the matters based on this information in the form and context in which they appear.
The information contained in this announcement that relates to the Gould’s Dam and Jason’s Mineral Resource Estimates for U3O8 is
provided by Mr Ingvar Kirchner, who is a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM) and a Member of the
Australian Institute of Geoscientists (AIG). Mr Kirchner has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration, and to the activity being undertaken to qualify as a Competent Person, as defined in the JORC Code 2012
edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Kirchner has over 39 years of experience and is
a full-time employee of AMC Consultants as a Technical Lead Geosciences. Mr Kirchner consents to the inclusion in this report of the matters
based on this information in the form and context in which they appear.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy.
Keep in touch
+61 (8) 6263 4494
boss@bossenergy.com
ASX: BOE | OTCQX: BQSSF
Investor Presentation
Share your feedback
Discover