Boss Energy Presentation to the Bell Potter Unearthed Conference
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) is pleased to provide a copy of the presentation to be
delivered by Chief Financial Officer Mr Justin Laird, at the 2026 Bell Potter Unearthed Natural Resources
Conference.
Mr Laird will be presenting at 10.30am AEDT on Wednesday 11 February 2026.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy
Limited.
For further information, contact:
Matthew Dusci
Managing Director
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
A global multi-mine Uranium producer
ASX: BOE | OTCQX: BQSSF
bossenergy.com
Bell Potter Unearthed
11 February 2026
Boss Energy | A global multi-mine Uranium producer 2
Our Business
Boss has expanded its portfolio of assets
Honeymoon
Production
Insert Photo
Alta Mesa JV (30%)
Production
Inser
t
Phot
o
Goulds Dam & Jasons
Study + Permitting
Insert Photo
Laramide Resources
19.6% Shareholder
Exploration
Ongoing
Insert Photo
Third producing
Uranium mine in
Australia
Achieved first year
guidance and on-track
to achieve 1.6 Mlbs in
second year
Joint Venture with
enCore (30%/70%) in
Texas USA
Achieved uranium
drummed of 623 klbs in
CY25 and continuing to
bring on new wellfields
Satellite deposits to
Honeymoon Operation
Advancing drilling,
studies and permitting
Holds a 19.6% shareholding
in Laramide Resources
Westmoreland one of the
largest and highest-quality
uranium development
projects in Australia ~ MRE
of 65.8 Mlbs U308
1
Uniquely positioned with operating assets….. …. and organic growth and value creation opportunities
Strong ground holding
and exploration expertise
Accelerating exploration
opportunities in the
Honeymoon catchment
Notes
1. Refer to Laramide’s ASX Announcement on 7 March 2025 “Laramide MRE Update for Westmoreland Uranium Project (amended)” for further information
Boss Energy | A global multi-mine Uranium producer 3
Overview
Near term guidance on track but medium-term uncertainty identified
Notes:
(1) As at 31 December 2025.
(2) See the Company’s announcements dated 28 July 2025 (“Honeymoon FY26 Guidance” and “June 2025 Quarterly Results Presentation”), 5 August 2025 (“Response to ASX Aware Query”), 11 September 2025 (“Honeymoon Review Update”), 29 October
2025 (“September Quarterly Report”), 20 November 2025 (“Chair’s Address and Managing Director’s Presentation to AGM”) and 18 December 2025 (“Honeymoon Update”) for further details.
Strong Balance
Sheet
Team
Delivering to
guidance
• Strong financial position with $208M 1 in cash and liquid assets
• Positioned to self-fund organic programs of work
• Inventory of 1.62 Mlbs provides upside to potential increases in uranium price
• Delivered Yr 1 guidance of 850 klbs drummed U3O8 and C1 cost guidance
• On track for Yr 2 guidance of 1.6 Mlbs drummed U3O8
• Reduced FY26 C1 cost guidance by $5/lb to $36-$40/lbs and AISC to $60-$64/lb
• Prioritising our people by strengthening our technical and operating capability and
capacity
• New team have been instrumental in ensuring stable operations, reducing costs and
initiating the wide-spaced wellfield design New Feasibility Study
New Feasibility
Study
• Honeymoon Review2 concluded a material and significant deviation to the EFS
• New Feasibility Study2 initiated, based on a wide-spaced wellfield design, which has the
potential to reduce the cost structure, unlock lower-grade mineralisation, improve the
production profile and extend the mine life as compared to the current wellfield design
Boss Energy | A global multi-mine Uranium producer 4
Honeymoon Production and Cost
Honeymoon Quarterly Production
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
500,000
2Q25 3Q25 4Q25 1Q26 2Q26
lbs
IX Production U3O8 Drummed
Cost guidance revised down and remain on track for production guidance
0
25
50
75
100
125
Q1FY26 Q2FY26
A$
AISC Realised price
Key Metric Unit
Q2
FY26
Q1
FY26
Full Year Guidance
FY26
Revised Previous
Production (Drummed) klb 456 386 1,600 1,600
Cash Cost $/lb 30 34 36-40 41-45
All In Sustaining Cost (AISC) $/lb 49 50 60-64 64-70
Capital expenditure
Sustaining $M 6 6 30-33 29-32
Project and Supporting Infra. $M 11 9 30-33 27-30
Total Capital Expenditure $M 17 15 60-66 56-62
Honeymoon Quarterly Realised Price and AISC
Boss Energy | A global multi-mine Uranium producer 5
Financial Strength
Boss is well positioned to self-fund New Feasibility Study and growth opportunities
Sales and Inventory Q2 FY26 Q1 FY26
Sales and loan repayments1 US$000’s 25,886 37,329
Sales and loan repayments1 A$000’s 39,262 57,133
Average realised price2 US$/lb 74.0 74.7
Average realised price2 A$/lb 112.2 114.3
Sales lbs 350,000 400,000
Loan repayment lbs - 100,000
Inventory on hand3 lbs 000’s 1,615 1,440
Cash and liquid assets Q2 FY26 Q1 FY26
Cash on hand A$000’s 52,857 47,767
Investments and other liquid assets A$000’s 44,912 53,700
Inventory on hand A$000’s 110,236 105,839
Trade receivable A$000’s - 5,112
Total cash and liquid assets A$000’s 208,005 212,418
Notes
1. Q1 Sales and loan repayments include a sale recorded during the quarter and cash received on 1 October 2025
2. Q1 Average realised price includes inventory loan repaid
• Balance sheet remains strong with $208M in cash and liquid assets.
• Drummed inventory on hand of 1,615 klbs, providing exposure to a
tightening uranium market.
• Strategically under contracted with ~3 Mlbs contracted (including a legacy
contract of 1.7 Mlbs) providing strong exposure to uranium price upside.
• Well positioned to self-fund identified organic programs of work.
Boss Energy | A global multi-mine Uranium producer 6
Alta Mesa JV
Alta Mesa JV continues to bring on new wellfields
• Drummed production in Q2 FY26 of 143 klbs, down 64 klbs (31%) on the
previous quarter’ of 206 klbs (on a 100% basis).
• Boss received 68 klbs in Q2 FY26 of drummed production, up from the
prior quarter of 45 klbs reflecting a timing catch up.
• New wellfields continue to be brought online with additional modules
currently being installed at Wellfield 7 and Wellfield 3.
• Alta Mesa East commenced drilling to confirm the potential of extensions
of uranium mineralisation from Alta Mesa into Alta Mesa East.
0
50,000
100,000
150,000
200,000
250,000
2QFY25 3QFY25 4QFY25 1QFY26 2QFY26
Drummed
(lbs)
Alta Mesa JV Quarterly Production (100%)
Boss Energy | A global multi-mine Uranium producer 7
Our understanding of the
assumptions underpinning the
current wellfield design was
changing
New Feasibility Study
Identified a potential pathway forward and initiated a New Feasibility Study to validate
The Challenge: identified through Honeymoon Review
There is extensive lower-grade
mineralisation that could be
mined
Need to fundamentally change
the cost structure to access
lower-grade
The Potential Solution: - a wide spaced wellfield design
Lowers capital intensity by
spreading wellfield
infrastructure over a greater
surface area
Improve tenors (reducing
reagent consumption) by
slowing the movement of
lixiviant, and making it travel
further
Unlock lower grade
mineralisation to improve
production profile and life
Boss Energy | A global multi-mine Uranium producer 8
New Feasibility Study
Reducing cutoff grade will increase the life-of-mine and annual production rate
*Generated at 40m x 40m support based on data currently available.
Confirmation with new block model and resource estimate underway.
40%
400+ppm
11%
0-100ppm
49%
100-400ppm
The opportunity to reduce cutoff grade
• From initial modeling ~49% U3O8 of contained metal is
between 100-400ppm
• Lowering the cut-off will improve the amount of metal that
could be brought into the wellfield design
• This, in turn, enables a reduction in the cutoff grade, which
further supports the fractionalisation of costs
• Increases life-of-mine and annual production rate
Boss Energy | A global multi-mine Uranium producer 9
New Feasibility Study
Current understanding to be validated through technical studies and trials
Significant metal with good continuity at lower-grades
Good permeability across the deposit which enables maintaining high flowrates for extractor and injector
wells and to control the path for the lixiviant over greater distances
Relatively good hydraulic connectivity, which enables lixiviant to flow between injector and extractor wells
Mineralised horizons that are not distributed too vertically, which prevents excessive dilution of reagents
Relatively low acid consumption given low carbonate content and low acid-consuming clays
Honeymoon Deposit Characteristics – Current Understanding
Boss Energy | A global multi-mine Uranium producer 10
New Feasibility Study
A wide-spaced wellfield design could materially improve economics for low-grade
(150)
(100)
(50)
-
50
100
150
200
250
300
350
400
450
500
550
40 50 60 70 80 90 100 110 120 130 140 150
Variance to current design
(%)
Well spacing (m)
Grade Time to final recovery PVE Reagents consumption
Wider spaced wells
- Higher grade
- Longer time (days) to recovery
- Lower PVE
- Lower reagent consumption
Initial modelling of impact to key wellfield drivers
Boss Energy | A global multi-mine Uranium producer 11
Technical team
Olivier Regnault
Wellfields Technical Lead
Steve Telford
Process Manager
Caren Kosgei
Senior Process Engineer
3.5 Years with Boss
Quals: Chemical
Engineering
Previously with
Fremantle
Metallurgy
4.5 Years with Boss
Quals: BSC Mineral
Geoscience, Grad Dip.
Groundwater
Hydrology
Previously with
Heathgate Resources
3.5 Years with Boss
Quals: BSc. Hons
Geology
Previously with
Heathgate
Resources
Andy Wilde
Chief Geologist
1.5 Years with Boss
Quals: PhD Geology,
RPGeo AIG,
Fellow AIG & GSA
Previously with Uranerz,
Paladin, Deep Yellow,
BHP
Conrad Wilkins
General Manager, Operations
11 Months with Boss
Quals: BE (Chem) hons
MBA CPEng NER
FAusIMM
Previously with WGA,
Inception Group,
Heathgate Resources
4 Months with Boss
Quals: Bachelor
Engineering
(Chemical)
Previously with
Heathgate Resources,
BHP
9 Months with Boss
Quals: Master of
Engineering
Previously with BHP
Olympic Dam -
Reliability Engineer
4 Months with Boss
Quals: PhD,
Hydrogeology &
Geochemistry
Previously at Katco in
Kazakhstan as Managing
Director and Orano
Increased
in-house
technical
capacity
Ryan Gore
Senior Mine Geologist
Alex Baum
Superintendent, Wellfields Cons.
Matt Williams
Senior Hydrogeologist
Boss continues to build strong technical capability
Boss Energy | A global multi-mine Uranium producer 12
Satellite Deposits
The early development of the Satellite Deposits has been accelerated
• The early development of Gould’s Dam and Jason’s Deposit remains
a key near-term opportunity for the Company.
• An updated resource statement and timetable of work required to
bring these satellite deposits into production is still expected to be
provided in Q3 FY26.
• Successful granting of a mining permit remains the primary critical
path component to bring these satellite deposits into the production
profile.
• The economics of these satellite deposits would materially improve
if the wide-spaced wellfield design was successful.
Boss Energy | A global multi-mine Uranium producer 13
Key Program – Est. Completion Date (CY) Q1 Q2 Q3
Guidance and results
3QFY26 Quarterly Results
FY27 Guidance
Gould’s Dam and Jason’s Deposit
JORC resource and permitting pathway
Wide-Spaced wellfield design
Update on Pathway Forward and Studies
Scoping study finalised
Completion of New Feasibility Study
Resource model
Accelerated Drilling Program Completion
Updated JORC resource model
Final JORC resource model
Key Catalysts
Review and Pathway Forward
• New Feasibility Study to be completed in Q3
CY26
• Accelerated workstreams commenced
• Interdependencies between all key programs
including resource modelling, wide-spaced
wellfield design and Gould’s Dam and Jason’s
Deposit
• Continue to provide updates on programs of
work
Boss Energy | A global multi-mine Uranium producer 14
Summary
Boss on track to meet FY26 Guidance
• Strongest quarter of drummed production in Q2 FY26 and a reduction in operating cost guidance
reflects ongoing operational improvements at Honeymoon.
• Retain strong balance sheet with $208M in cash and liquid assets1. Remaining strategically under-
contracted enables Boss’ future sales to benefit from a tightening uranium market.
• The successful and timely delivery of the New Feasibility Study2 is a top strategic priority for Boss.
This would improve returns for Honeymoon, Goulds Dam and Jasons Deposit compared to the
current wellfield design.
• On-track to ensure safe delivery of FY26 production guidance.
Notes:
(1) As at 31 December 2025.
(2) See the Company’s announcements dated 28 July 2025 (“Honeymoon FY26 Guidance” and “June 2025 Quarterly Results Presentation”), 5 August 2025
(“Response to ASX Aware Query”), 11 September 2025 (“Honeymoon Review Update”), 29 October 2025 (“September Quarterly Report”), 20 November 2025
(“Chair’s Address and Managing Director’s Presentation to AGM”) and 18 December 2025 (“Honeymoon Update”) for further details.
15
Boss Energy | A global multi-mine Uranium producer
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (Boss Energy or
Company).
NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the
recipient’s investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent
assessment and investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should
not rely on any statement or the adequacy and accuracy of any information. This Presentation is in summary form and does not
purpose to be exhaustive. This Presentation should be read in conjunction with Boss Energy’s periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of
the Information. Boss Energy and its directors, employees, agents and consultants shall have no liability (including liability to any
person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or
implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute that
can not be excluded.
FORWARD LOOKING STATEMENTS
All dollar amounts are in Australian dollars unless otherwise indicated. This announcement may contain certain statements and
projections provided by or on behalf of Boss Energy Limited with respect to the anticipated future undertakings. These forward-
looking statements reflect various assumptions by or on behalf of Boss Energy. Accordingly, these statements are subject to
significant business, economic and competitive uncertainties and contingencies associated with the mining industry which may be
beyond the control of Boss Energy which could cause actual results or trends to differ materially, including but not limited to price
and currency fluctuations, geotechnical factors, drilling and production results, development progress, operating results, reserve
estimates, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries, approvals
and cost estimates, environmental risks, ability to meet funding requirements, share price volatility. Accordingly, there can be no
assurance that such statements and projections will be realised. Boss Energy makes no representations as to the accuracy or
completeness of any such statement of projections or that any forecasts will be achieved. Additionally, Boss Energy makes no
representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under
statute or otherwise) is or will be accepted by Boss Energy or by any of their respective officers, directors, shareholders, partners,
employees, or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions or matters
(express or implied) arising out of, contained in or derived from this announcement or any omission from this announcement or of
any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In furnishing
this announcement, Boss Energy undertakes no obligation to provide any additional or updated information whether as a result of
new information, future events or results or otherwise. Nothing in this material should be construed as either an offer to sell or a
solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in isolation as a
basis to invest in Boss Energy.
EFFECT OF ROUNDING
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
PAST PERFORMANCE
Past performance information, including past share price performance of Boss Energy and pro forma financial information, given in
this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss Energy’s
(or anyone else’s) views on Boss Energy’s future financial performance or condition. Past performance of Boss Energy cannot be
relied upon as an indicator of (and provides no guidance as to) the future performance of Boss Energy. Nothing contained in this
Presentation nor any information made available to you is, or shall be relied upon as a promise, representation, warranty or
guarantee, whether as to the past, present or future.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy.
Keep in touch
+61 (8) 6263 4494
boss@bossenergy.com
ASX: BOE | OTCQX: BQSSF
Bell Potter Unearthed
Share your feedback
Discover