September 2026 Quarterly Report
Honeymoon produces 359 klbs as Boss
advances operational transition and growth
A pivotal quarter for Boss to complete the Honeymoon New Feasibility Study and update the
Honeymoon Mineral Resource, while also setting out its aspiration to build a regional
production hub to increase production, extend mine life and reduce costs
Highlights
Q1 FY27 Performance
• Remain on track to deliver FY27 production and cost guidance with production and costs
consistent with expectations for the quarter.
• Drummed production of 359 klbs U3O8 (down 1%) and IX production of 337 klbs (down 9%) for
the quarter reflecting record flow and a decline in average tenor, in line with expectations.
• Q1 FY27 C1 cost of $47/lb (US$33/lb), AISC of $79/lb (US$55/lb) and total capital expenditure of
$13M all remain on track to meet FY27 guidance.
• Cash of $39M declined by $10M as Boss accumulated an additional 60 klbs of drummed U3O8.
• Average realised sale price of $117/lb (US$82/lb) for the quarter reflecting improving uranium
market fundamentals.
• Balance sheet remains strong with $195M in cash and liquid assets, supporting organic funding of
ongoing transition to a wide-spaced wellfield design.
Operations & Infrastructure
• Completed first full quarter of production from wellfield B6 (the last wellfield under the old
design). Performance has been encouraging, recovering approximately half of the resource after
12.1 pore volume exchange (PVE), with an average leach solution (PLS) tenor of 102ppm.
• Commenced flushing at EKT1, the first wellfield operating under the wide-spaced wellfield design.
While detailed flushing and leaching data are expected in Q2 FY27, initial flushing performance
supports expected viability of the wide-spaced wellfield design.
• Continued construction of new wellfields, HMT1, EKT2 and EKT3 which are expected to commence
production in Q3 FY27, Q4 FY27 and Q1 FY28 respectively.
• Commenced Stage 1 and Stage 2 of water treatment plant upgrades which remain on track for
delivery in Q4 FY27 and Q3 FY28 respectively.
• Continued acceleration of opportunities to extend the life of mine and increase annual production
by progressing permitting and studies for the Honeymoon Mine Extension, Gould’s Dam and
Jason’s Deposit.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 2
Corporate & Outlook
• Peter Botten commenced as Non-Executive Director and Chair on 30 September 2026. Previous
Chair, Wyatt Buck, remains as Non-Executive Director.
• Delivered New Feasibility Study (NFS) ahead of schedule. The NFS confirms that a wide-spaced ISR
wellfield design is viable and is forecast to support continued economic uranium production at
Honeymoon until at least FY34, with forecast life-of-mine production, of approximately 13.8Mlbs
U₃O₈ drummed over a nine-year operating period.
• FY27 Guidance provided at 1.25-1.30M lbs U3O8 with C1 cost of $51-56/lb (US$35-39/lb), AISC of
$83-92/lb (US$58-64/lb) and capital expenditure of $58-65M.
• Market Day held, which outlined the Company's aspiration to produce 2.5Mlbs per annum at an
AISC of $65/lb (US$45/lb) by the early 2030s.1
• Alta Mesa production totalled 10 klbs U3O8 drummed vs Q4 FY26 of 45 klbs U3O8 drummed (on a
100% basis). Boss did not receive any product for the quarter.
September Quarterly conference call will be held today, Wednesday, 28 October 2026, at 8am AWST
(11am AEDT).
To register and listen in live, please click on the link below:
https://loghic.eventsair.com/352291/161551/Site/Register
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) (“Boss” or “the Company”) is pleased to report a solid
start to FY27 with production and cost in line with expectations and on track for FY27 Guidance.
September Quarter Performance Q1 FY27 Q4 FY26 QoQ QoQ (%) FY27 Guidance2
Honeymoon Production Mlbs U3O8 0.36 0.36 0.00 (1%) 1.25-1.30
Honeymoon C1 Cost1
A$/lb 47 45 2 5% 51-56
Honeymoon AISC1
A$/lb 79 70 9 13% 83-92
Capital expenditure A$M 13 21 (8) (39%) 58-65
Alta Mesa Production (100%) Mlbs U3O8 0.010 0.045 (0.035) (77%) n/a
Sales Mlbs U3O8 0.301 0.325 (0.024) (8%) n/a
Realised Price1
US$/lb 82 75 7 9% n/a
Cash and liquid assets A$M 195 207 (12) (6%) n/a
Notes: (1) AUD/USD Q1 FY27: 0.6977 Q4 FY26: 0.6869; (2) See announcement dated 27 August 2026 titled “FY2026
Financial Results and FY2027 Guidance” for details.
Boss CEO and Managing Director, Matthew Dusci, commented:
“The September quarter was pivotal for Boss. We released our New Feasibility Study and updated Mineral
Resource, establishing a robust foundation for Honeymoon, and outlined our regional growth aspiration to
increase production, lower costs and extend the business well into the 2030s by substantially leveraging
existing infrastructure.
Operationally, we made a solid start to FY27. Honeymoon produced 359 klbs of drummed U₃O₈ and
achieved record flows, despite a significant rainfall event that resulted in 19 days of lost production. C1
1
Refer to ASX announcement dated 15 September 2026, titled “Boss Energy – 2026 Market Day Presentation” for further details, in particular the
“Aspirational Statements” in the "Disclaimer and Important Notices" section of the presentation.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 3
costs of A$47/lb and AISC of A$79/lb were below the full-year guidance range, as expected at this point in
the year.
“The transition to the wide-spaced wellfield design is progressing. Flushing commenced at EKT1, our first
wide-spaced wellfield, with early flushing performance supporting our confidence in the design. We expect
final flushing data and the first leaching results in the December quarter, providing further operating data
against the NFS assumptions. Construction is also progressing at EKT2, EKT3 and HMT1.
The NFS provides a technically robust pathway to materially improve Honeymoon’s cost structure. It draws
on 86,670 metres of new drilling, commercial ISR operating data and advanced reactive transport
modelling. With that foundation established, our priority is to translate the study into consistent operating
performance while pursuing further optimisation.
“At our September Market Day, we outlined our strategy to build a reliable, lower-cost, long-life uranium
business. Central to this is developing Honeymoon as a regional production hub, processing uranium from
Honeymoon, Jason’s Deposit and Gould’s Dam through one plant. Our aspiration is to produce 2.5Mlbs
annually at an AISC of around A$65/lb by the early 2030s. We are progressing the approvals and technical
work to support this ambition. The EPBC referral for the Honeymoon Mine Extension has been submitted,
with a referral decision expected in the December quarter, while environmental and technical work
continues at Jason’s Deposit and Gould’s Dam.
“Our balance sheet remains strong, with A$195 million in cash, liquid assets and inventory, and no debt.
Uranium inventory increased to 1.64Mlbs, while our average realised price rose 9% to US$82/lb, with
stronger pricing expected in the December quarter. Our strategically under-contracted position provides
exposure to improving uranium prices while we continue to organically fund the transition to the wide-
spaced design.
“I am pleased to welcome Peter Botten, who commenced as Chair on 30 September. I also thank Wyatt Buck
for his leadership and contribution as Chair and look forward to his continued contribution as a Non-
Executive Director.
“Boss has a stronger foundation and a clear direction. We recognise that confidence will be rebuilt through
consistent delivery. Our focus is on executing the transition safely and reliably, improving costs and
converting our resource base into long-term shareholder value.”
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 4
Honeymoon Safety Performance
Honeymoon continues to implement a broad safety improvement program focused on reducing injuries
while strengthening the underlying safety culture and management systems. Key areas of work include
strengthening incident investigation and causal analysis, improving communication of incident learnings
through safety alerts and safety shares, and assigning, tracking and verifying corrective actions through
the site incident management process.
The operation is also strengthening workforce capability through role-specific competency requirements,
accredited external training, emergency response and high-risk work training. These initiatives are being
supported by increased hazard, incident and lead-indicator reporting, a strengthened safety team and
greater management visibility of issues raised.
The Total Reportable Injury Frequency Rate (TRIFR2
) decreased during the quarter to 17.8, which included
two Lost Time Injuries during the quarter. TRIFR remains higher than the level we are seeking to achieve
and sustained improvement is still required.
Table 1: Honeymoon TRIFR (12-month moving average)
Quarter ended Q1 FY27 Q4 FY26
TRIFR 17.8 19.7
Honeymoon Production Results
Production for Q1 FY27 was 359 klbs U3O8 drummed (down 0.8%) and IX production of 337 klbs (down
9.2%) supported by record flow. There was a 12.6% decline in tenor which was expected as existing
wellfields reduce in average tenor as they remain online. Honeymoon experienced another significant
rainfall event over two weeks in the month of August which substantially contributed to 19 lost days of
production for the quarter. Despite this interruption, the operation was able to materially deliver on initial
expectations for the quarter and was able to pull forward some planned shutdown activities from later in
the year.
Table 2: Operational physicals
Quarter ended Unit Q1 FY27 Q4 FY26 QoQ QoQ (%)
Wellfields online # 6 6 - -
NIMCIX Columns online # 5 5 - -
IX Flow (total) (m3
) 3,693,205 3,542,193 151,012 4.3
PLS to IX tenor (U3O8 mg/l) 43 49 6 (12.6)
IX Recovery (%) 95.7 96.1 (0.4) (0.4)
IX Production (total)1
(lbs) 337,093 371,198 (34,106) (9.2)
U3O8 Drummed (total) (lbs) 359,335 362,152 (2,817) (0.8)
Drummed production exceeded IX production for the quarter as in-circuit inventory was drawn down. For
Q2 FY27, it is expected that IX production will be consistent with Q1 FY27 with higher flows offset by
declining average tenor.
The IX Recovery declined by 0.4 percentage points during the quarter as trials were conducted in the ion
exchange and elution circuit. The trials are so far proving successful and could result in a small cost
improvement and reduction in permeate water consumption longer term.
2 Total Reportable Injury Frequency Rate (TRIFR) measures the rate of restricted work injuries (RWIs), medical treated injuries (MTI) and lost
time injuries (LTIs) that occur per million hours worked.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 5
During the quarter, wellfield B6 completed its first full quarter of operations following its commissioning
in late June 2026. B6 is the first operating wellfield at East Kalkaroo and used the previous wellfield design,
with 30 m injector-to-extractor spacing. Performance has been encouraging, recovering approximately
half of the wellfield resource after 12.1 pore volume exchange (PVE), with an average leach solution (PLS)
tenor of 102ppm. Flushing of this wellfield only required 0.6 PVE with low calcium levels and acid
consumption.
During the quarter, Boss also commenced flushing at EKT1, its first wide-spaced wellfield with injector-to-
extractor spacing of 58 m. While final flushing and initial leaching results are expected in Q2 FY27, early
flushing performance supports confidence that the wide-spaced design will perform in line with the
expectations set out in the NFS.
Honeymoon Costs
• C1 costs were A$47/lb, below the FY27 guidance range of A$51-$56/lb. Costs are expected to
remain within the guidance range while increasing during the year as average PLS tenor declines.
• Sustaining capital expenditure for the quarter was $9M, slightly less than expected as rain
temporarily interrupted drilling and wellfield construction activities. Expenditure primarily
comprised first-fill costs for EKT1 and construction activities across EKT1, HMT1, EKT2 and EKT3.
• Process facilities capital expenditure was $4M, in line with expectations. Expenditure is expected
to be weighted towards the second half of FY27.
Table 3: Production and Capital Costs
Key Metric Unit
Q1 FY27 Q4 FY26 FY27 Guidance
AUD USD AUD USD AUD USD
C1 Cash Cost $/lb 47 33 45 31 51-56 35-39
All In Sustaining Cost (AISC) $/lb 79 55 70 48 83-92 58-64
Capital expenditure
Sustaining $M 9 6 7 5 33-37 23-26
Project and Supporting Infrastructure $M n/a n/a 14 10 n/a n/a
Process Facilities $M 4 3 n/a n/a 25-28 18-19
Total Capital Expenditure $M 13 9 21 15 58-65 41-45
Notes: (1) AUD/USD Q1 FY27: 0.6977 Q4 FY26: 0.6869.
Balance Sheet
Boss finished the quarter in a strong financial position with no debt and $194.9M of liquid assets (being
cash, liquid investments and physical U₃O₈ inventory), a decrease of $12.4M from Q4 FY26. Key
movements included:
• Cash decreased by $10.5M to $39.2M, due mainly to operating costs ($22.2M), capital
expenditure ($15.3M) and other cash outflows ($7.9M) during the quarter, partially offset by cash
receipts from uranium sales ($34.9M). Further detail is provided below.
• Investments decreased by $9.9M due to marked to market losses on listed investments.
• Inventory on hand increased by $8.0M to $124.2M as an additional 60 klbs U3O8 drummed was
accumulated. Note that inventory is recorded on the balance sheet at the lower of cost and net
realisable value.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 6
Table 4: Cash, inventory and investments
Notes: (1) Inventory on hand reflects drummed U3O8 valued at the lower of cost and net realisable value.
The waterfall chart below highlights the September quarter movements in cash.
Figure 1: September Q1 FY27 Cash (A$000’s)
Sales and Inventory
During the quarter, Boss recorded $35.2M (US$24.6M) of sales for 301 klbs at an average realised price
of $117/lb (US$81.8/lb). Boss now holds a total of 1,641 klbs of inventory on hand, which reflects an
accumulation of an additional 60 klbs during the quarter.
Table 5: Sales, Loans and Inventory
Key Metric Unit Q1 FY27 Q4 FY26
Sales US$000’s 24,586 24,421
Sales A$000’s 35,183 34,809
Sales lbs 300,621 325,000
Average realised price US$/lb 81.8 75.1
Average realised price A$/lb 117.0 107.1
Inventory on hand lbs 000’s 1,641 1,581
A$000’s Q1 FY27 Q4 FY26 QoQ ($)
Cash on hand 39,200 49,671 (10,471)
Investments and other liquid assets 31,428 41,369 (9,941)
Inventory on hand1
124,236 116,272 7,964
Trade receivable - -
Total cash and liquid assets 194,864 207,311 (12,448)
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 7
Boss expects to achieve an average realised sales price in Q2 FY27 of circa US$87-89/lb. Deliveries for the
legacy contract (which typically achieves a realised price of 65-70% of the average prevailing spot price
preceding delivery) is expected to be 124 klbs per quarter in both Q3 FY27 and Q4 FY27. The uranium
market continues to remain supportive with the Term price remaining at an all-time-high.
Honeymoon Construction Activities - Wellfields
During the quarter, construction activities focussed on bringing new wellfields online (EKT1, EKT2, EKT3
and HMT1). The wellfield status and location of each wellfield are set out below.
Table 6: Wellfield status
Name Domain Spacing* Status
B6 East Kalkaroo 30 Commenced production in June 2026
EKT1 East Kalkaroo 58 Currently flushing, expect production Q2 FY27
HMT1 Honeymoon 70
Under construction, expect production Q3 FY27. This wellfield has 4
five-spot patterns and is in the lowest grade area of the resource.
EKT2 East Kalkaroo 49 Under construction, expect production Q4FY27
EKT3 East Kalkaroo 49 Under construction, expect production Q1FY28
*Injector to extractor spacing. All wellfields shown above (except for HMT1) are intended to operate with 16 five-
spot patterns, transitioning to an injector to extractor spacing of 49 m, with 8 five-spot patterns as outlined in the
NFS.
Figure 2: Wellfields Map (Honeymoon)
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 8
Activities to bring on new wellfields were in line with expectations other than the rain event which
resulted in a small delay in the commencement of flushing at EKT1 and some construction activities at
HMT1, EKT2 and EKT3. Early flushing performance from EKT1 continues to support the expected viability
of the wide-spaced wellfield design.
Honeymoon Construction Activities – Process facilities
During the quarter, Boss progressed key processing facilities projects outlined in the NFS to support the
planned production ramp-up including:
• Water treatment plant - Stage 1: Remains on track for completion by Q4 FY27. Work during the
quarter included a specialist review of the existing WTP, incorporating plant verification and
assessment of cleaning requirements, softener settling performance, hydraulic constraints and
other opportunities to optimise and debottleneck the existing plant and reverse osmosis (RO)
circuits.
• Water treatment plant - Stage 2: Remains on track for completion by Q3 FY28. Activities
completed included initial scoping of the major capacity expansion to approximately 300 m³/h RO
feed, including evaluation of BLS bleed preconditioning and iron recovery and a duplicate
neutralisation and softening treatment train, and defined the targeted test-work programme
required to establish the design basis and process design criteria.
Resource Delineation and Exploration Activities
During the quarter, work was focused on geological and mineralisation modelling of the delineation
drilling completed at Brooks Dam North at the end of the previous quarter. Rainfall delays and the
temporary reallocation of rigs to prioritise production wellfield development deferred the
commencement of drilling at Jason’s Deposit.
Boss plans to commence substantial drilling programs in Q2 FY27 to increase resource confidence and test
growth opportunities across the Honeymoon catchment. Planned activities in this current quarter include:
• Jason’s Deposit – Resource Delineation and Extension: A program of 137 mud rotary holes for
approximately 15,576 m, targeting increased confidence in the existing Mineral Resource and
potential resource growth through drilling of priority areas within the unclassified mineralised
envelope. Drilling is scheduled to commence in Q2 FY27, with results expected by Q4 FY27.
• Jason’s Deposit – Orebody characterisation: A program of 15 diamond core holes for
approximately 1,890 m to improve understanding of the deposit’s hydrogeological, mineralogical
and mineralisation characteristics. Drilling has commenced and results are expected by Q4 FY27.
• Honeymoon Catchment Exploration – Priority drill targets: A program of up to 80 aircore holes for
approximately 9,894m is planned to test high-priority greenfield targets within proximity to
existing and/or future potential production infrastructure across both the Honeymoon and
Gould’s Dam project areas. This program is scheduled to commence in the second half of Q2 FY27
and be completed during Q3 FY27.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 9
New Feasibility Study – Wide-spaced wellfield design
Boss completed the New Feasibility Study which supports the technical and economic viability of a wide-
spaced ISR wellfield design. The NFS forecasts continued economic uranium production at Honeymoon
until at least FY34, with life-of-mine production of approximately 13.8 Mlbs U₃O₈ drummed over a nine-
year operating period.
The wide-spaced design is expected to mitigate the impact of the lower Mineral Resource Estimate (MRE)
and is forecast to reduce life-of-mine AISC by approximately $30/lb on a like-for-like basis compared with
applying the original planned wellfield spacing to the updated MRE.
The wellfield design is enabled by Honeymoon’s unique combination of favourable deposit characteristics,
including a combination of high permeability and hydraulic connectivity, effective aquifer confinement,
low natural groundwater-flow velocity and low acid consumption.
The NFS draws on an integrated technical approach to ISR mine planning, combining geological and
hydrogeological modelling with deposit-scale reactive transport modelling (RTM), calibrated against
extensive historical and commercial operating data.
Further details of the NFS, including the technical work underpinning the wide-spaced wellfield design,
are provided in Boss’s ASX announcement dated 27 August 2026 and the accompanying NFS presentation.
Investors can access the recorded webcast via the webcasts and presentations page on the Boss Energy
website.
Growth Activities – Honeymoon Production Hub
During the quarter, Boss outlined its aspiration to develop Honeymoon as a regional production hub,
processing uranium from Honeymoon, Jason’s Deposit and Gould’s Dam through its existing processing
infrastructure. The aspirational production and cost at the Honeymoon processing hub is to produce at
2.5 Mlbs per annum at an AISC of $65/lb.3
Boss has accelerated technical studies, environmental assessments and approvals work to advance the
satellite deposits. Their development has the potential to increase annual production, reduce unit costs
and extend the operating life of the Honeymoon processing hub.
Progress during the quarter included:
• Honeymoon Mine Extension (HME): Boss completed and submitted the Environment Protection
and Biodiversity Conservation Act 1999 (EPBC) referral, supported by extensive studies and
consultation with regulators. A referral decision is expected in Q2 FY27. Preparation of the Mining
Lease Application is progressing and will incorporate relevant requirements arising from the
referral process. Boss anticipates coordination between Commonwealth and State regulators to
support an accredited assessment pathway.
• Jason’s Deposit: EPBC referral documentation is well advanced. The technical work required for
this stage is complete, and environmental studies are nearing completion.
• Gould’s Dam: Technical studies continue to assess the preferred configuration for processing
uranium through the Honeymoon plant. Significant rainfall temporarily restricted access for
environmental fieldwork. Access has since resumed, and the delay is not expected to materially
affect the planned EPBC referral submission timing.
Technical work underpinning the Honeymoon NFS is being applied to the evaluation of Jason’s Deposit
and Gould’s Dam. The improved understanding of the geology, hydrogeology and wide-spaced wellfield
design provides a stronger basis for assessing satellite development options. Combined with the use of
Honeymoon’s existing processing infrastructure and operating platform, this work has the potential to
reduce capital intensity, wellfield development requirements and operating costs.
3
Refer to ASX announcement dated 15 September 2026, titled “Boss Energy – 2026 Market Day Presentation” for further details, in particular the
“Aspirational Statements” section in the "Disclaimer and Important Notices" section of the presentation.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 10
Alta Mesa Joint Venture (Boss 30% / enCore Energy Corp 70%)
Production during the quarter from the Alta Mesa operation, a joint venture with enCore Energy Corp
(NASDAQ: EU; TSXV: EU) (enCore), totalled 10 klbs U3O8 drummed compared to the previous quarter's
production of 45 klbs U3O8 drummed (on a 100% basis), a decrease of 35 klbs. Boss did not receive any
product for the quarter compared with 13 klbs U3O8 drummed received in the prior quarter. The decline
in production is attributed to permitting delays at the state level (Texas Commission on Environmental
Quality), resulting in production delays as new wellfields are not brought on in time to make up for
production declines in existing wellfields. These delays resulted in production operations at the Alta Mesa
plant being stopped until new wellfields are brought online.
Final permitting for new wellfields (PAA3 Extension and PAA8) are expected to be received in Q2 FY27 and
Q3 FY27 respectively.
Corporate
During the quarter, Boss elected to withdraw from the Eclipse Metals option and earn-in agreement over
the Liverpool Uranium Project (Alligator Rivers Uranium Field, NT) following a review of exploration
priorities and capital allocation.
Mr Peter Botten commenced as an Independent Non-Executive Director and Chair of the Company,
effective 30 September 2026.
Mr Botten is a highly respected business leader with more than 45 years of experience in the energy and
resources sectors. He is best known for his leadership of Oil Search Limited, where he served as Managing
Director and CEO for more than 25 years and led the company through a period of significant growth,
including the development of the PNG LNG Project, one of the largest resource developments in the Asia-
Pacific region.
Mr Botten succeeded Mr Wyatt Buck, who remains on the Board as an Independent Non-Executive
Director. Boss thanks Mr Buck for his leadership and contribution as Chair through an important period in
the Company’s development.
The Company also appointed Kathryn Walker as General Counsel. Kathryn brings more than 20 years'
experience advising on major projects, infrastructure, energy and natural resources transactions, and was
previously General Counsel at Symphony Infrastructure Partners and a partner at Piper Alderman.
During the quarter, the Australian Securities Exchange notified the Company of its reclassification from a
‘mining exploration entity’ to a ‘mining producing entity’. As a result, Boss is no longer required to lodge
an Appendix 5B quarterly cash flow report. Boss continues to lodge quarterly activities reports, now under
Listing Rule 5.1 as a mining producing entity.
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Matt Dusci
Managing Director and Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 11
Forward-Looking Statements
This announcement contains certain forward-looking statements provided by or on behalf of Boss with
respect to potential future matters. Forward-looking information may include, without limitation,
statements regarding plans, strategies and objectives of Boss, production and financial guidance, financial
forecasts, estimates of project milestones and timing and expected costs or production outputs. In some
cases, forward-looking information can be identified by terms such as “may”, “will”, “should”, “expect”,
“plan”, “anticipate”, “believe”, “intend”, “estimate”, “predict”, “potential”, “continue” or other similar
expressions concerning matters that are not historical facts. Guidance as to production, unit costs and
capital expenditure is based on assumptions, budgets and estimates existing at the time of assessment
which may change over time impacting the accuracy of those estimates. These estimates are developed
in the context of an uncertain operating environment including in respect of inflationary macroeconomic
conditions, and uncertainties surrounding the risks associated with mining which may impact production
and have a flow on effect on sales. Actual results may therefore vary significantly depending on these risks
and the timing required to address them.
Forward-looking statements reflect Boss’s expectations at the date of this announcement, however they
are not guarantees or predictions of future performance or statements of fact. Forward-looking
information involves known and unknown risks, uncertainties and other factors (many of which are
beyond the control of Boss and its directors and management) which may cause the actual results,
performance or achievements of Boss and its business to be materially different from any future results,
performance or achievements expressed or implied by the forward-looking information. Accordingly,
undue reliance should not be placed on forward-looking information.
The forward-looking statements in this announcement reflect various assumptions by or on behalf of Boss
(which assumptions may prove to be inaccurate). Accordingly, this is another reason why such statements
are subject to significant business, technical, legal, economic and competitive and other uncertainties and
contingencies and other factors which may be beyond the control of Boss which could cause actual results
or trends to differ materially from the forward-looking statements in this announcement, including but
not limited to differences or inaccuracies arising from price and currency fluctuations, geotechnical
factors, geological and mining factors, estimated continuity of mineralised horizons, metallurgical and
processing factors, sales factors, drilling and production results, development progress, operating results,
mineral resource estimates, legal issues, legislative, fiscal and regulatory developments, economic and
financial market conditions in various countries, approvals and cost estimates, environmental risks, ability
to meet funding requirements, share price volatility, uranium markets and other matters. Accordingly,
there can be no assurance that such forward-looking statements and projections will be realised.
Boss makes no representations as to the accuracy or completeness of any forward-looking statements or
projections or that any forecasts will be achieved. Additionally Boss makes no representation or warranty,
express or implied, in relation to, and (to the maximum extent permitted by law) no responsibility or
liability (whether for negligence, under statute or otherwise) is or will be accepted by Boss or by any of its
of
Share your feedback
Discover