ASX Release 4 September 2024
Honeymoon Uranium Project, South Australia
Production ramp-up hits key milestone as first
NIMCIX column achieves nameplate capacity
Commissioning of second NIMCIX column underway, ensuring Honeymoon remains on
track to meet FY25 production target of 850,000lbs of U308 as set out in Feasibility Study
Highlights
Operations
•
Commissioning and ramp-up to steady-state production proceeding to plan, with key
production metrics meeting Feasibility Study forecasts
•
First NIMCIX production column achieves nameplate uranium production
•
A total of 72,516lbs of uranium produced in the months of July and August
•
Preliminary updates on costs to be provided once the second and third IX circuits (NIMCIX
columns) are commissioned
Construction
•
NIMCIX production column 2 constructed with hydrotesting completed
•
Wet commissioning and sequence testing of column 2 underway, on target for production in
September 2024 as scheduled
•
Second wellfield being flushed in preparation to supply Pregnant Leach Solution (PLS) to
column 2
•
RO Plant 2 commissioned and operating in line with expectations
•
Construction of NIMCIX column 3 on target for commissioning and production in December
quarter, 2024
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) is pleased to provide an update on the strong progress
being made as part of the commissioning and production ramp up at its Honeymoon Uranium Mine.
Boss Managing Director Duncan Craib said: “We continue to meet or exceed all of our key targets and
are comfortably on track to meet our production guidance.
“The first IX circuit is now operating at nameplate capacity, proving that the technology works at the
rate and scale forecast in the Feasibility Study. This is a pivotal point in the project’s development.
“Commissioning of the second IX circuit is underway and construction of the third is advancing rapidly.
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Duncan Craib - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Paul Armstrong – Public Relations
+61 (08) 9388 1474
www.bossenergy.com
@Boss_Energy
“Supplies of the pregnant leach solution, grades and extraction rates are meeting or exceeding our
targets and overall uranium production rates are rising in line with the schedules in the Feasibility
Study”.
Honeymoon Production Results for months of July and August 2024
On 22 April 2024, the Company was pleased to announce a major milestone with production of the first
drum of uranium at its 100 per cent-owned Honeymoon Uranium Project in South Australia.
As expected, and in-line with Feasibility Study forecasts, Honeymoon’s production continues to increase
as set out in the results for the combined months of July and August 2024.
In August 2024, NIMCIX column 1 achieved nameplate production.
Bringing each new NIMCIX production column online will result in a proportional increase in production
and lower the cost per pound produced.
Table 1: Operational physicals for the June 2024 Quarter and combined July and August 2024
Process
Wellfields online
Wells online
IX Columns operational
IX Flow (total)1
PLS to IX tenor (weighted
average)2
IX Recovery (weighted
average)2
IX Production (total)1
U3O8 Drummed (total)
Unit
(m3)
(U3O8
mg/l\L)
(%)
(lbs)
(lbs)
June Quarter 2024
July & August 2024
1
16
1
327,066
80
1
16
1
480,311
70
99.7
98.0
57,364
28,844
72,516
51,863
Notes: (1) Conversions: There are 1,000 litres per m3 and 0.0000022 lbs per mg. (2) The weighted average is
calculated based on total flow for the quarter.
Plant recovery continues to improve with production optimisation. The variance between IX Production
and U308 drummed is due to a build-up of inventory in circuit as well as losses from the circuit. During
commissioning and ramp up, losses from the precipitation and dewatering circuits were higher than
design which has been a focus for the operations team over the previous month. Losses have been
reduced to circa 3.5% in August as improvements were, and continue to be, implemented.
It is important to note that while the tenors being achieved from initial wellfields exceed the average
LOM tenors forecast in the Feasibility Study1, the project is still in the ramp-up phase and therefore
these tenors should not be extrapolated across the LOM. Boss’ production guidance remains based on
the forecast tenors contained in the Feasibility Study.
Given the time taken to ramp-up wellfields in ISR projects, preliminary cost updates will be provided
once columns 2 and 3 are commissioned.
Since acquiring Honeymoon in December 2015, Boss has invested significant time and capital in making
technical improvements to the project. Boss has now been able demonstrate that the first NIMCIX
column can operate at nameplate uranium production which adds confidence that the Company will
meet its FY25 production target of 850,000 lbs of U308 as set out in Feasibility Study.
1
Refer to ASX: BOE announcement dated 21 June 2021.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
Page 2
Honeymoon Ramp-up Activities
Construction of NIMCIX column 2 is complete and will commence production towards the end of
September. NIMCIX column 3 remains on track for completion and production in December quarter
2024.
Figure 1: From left to right, NIMCIX columns 1, 2 and 3
As hydrotesting is now complete on column 2, Honeymoon will finalise the control circuits and sequence
testing, and run the system with RO water followed by PLS in September 2024.
Columns 4, 5 and 6 will be commissioned in 2025 to enable ramp-up to continue to be in line with
Feasibility Study forecasts, to achieve Honeymoon’s nameplate capacity of 2.45Mlb/annum of U3O8.
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Duncan Craib
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
Forward-Looking Statements
This announcement includes forward-looking statements. These forward-looking statements are based
on the Company’s expectations and beliefs concerning future events. Forward-looking statements are
necessarily subject to risks, uncertainties, and other factors, many of which are outside the control of
Boss Energy, which could cause actual results to differ materially from such statements. Boss Energy
makes no undertaking to subsequently update or revise the forward-looking statements made in this
announcement, to reflect the circumstances or events after the date of this announcement.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
Page 3
Share your feedback
Discover