BOE - SUBSTANTIAL INCREASE AND UPGRADE IN HONEYMOON RESOURCE
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
20 January 2016
SUBSTANTIAL INCREASE AND UPGRADE IN
HONEYMOON URANIUM RESOURCE
HIGHLIGHTS
•
Global Mineral Resource increased to 15.2 Mt @ 820ppm eU3O8 for 27.6 Mlb U3O8
- Maiden Measured Resource – 1.7 Mt @ 1720ppm eU3O8 for 6.5Mlb of U3O8
- Indicated Resources – 1.5 Mt @ 1270ppm eU3O8 for 4.2 Mlb U3O8
- Inferred Resources – 12 Mt @ 640ppm eU3O8 for 16.8 Mlb U3O8
•
66% increase in reported endowment at preferred cutoff of 250ppm U3O8 (27.6 Mlb of U3O8
at 250ppm U3O8 cutoff vs 16.6 Mlb at previously reported 500ppm cutoff)
•
31% increase in high grade endowment (at a directly comparable 500ppm cutoff) (6.9 Mt @
1420ppm eU3O8 for 21.7 Mlb U3O8 vs 5.3 Mt @ 1400ppm eU3O8 for 16.6 Mlb U3O8)
•
The Honeymoon Resource is one of the highest grade uranium resources held by an ASXlisted uranium developer
•
Additional historical high grade mineralised intercepts of up to 2.8 m @ 1800ppm eU3O8
over 1km outside current resource boundary paves way for future resource upgrades
which are one the focus points for activity
•
Resource estimations underway at other exploration targets contained within Boss’
2,600km2 exploration tenement package
Boss Resources Limited (ASX: BOE) is pleased to announce a substantial increase in the global Mineral
Resources reported in accordance to the JORC Code (2012) to 15.2 Mt at 820ppm eU3O8 for 27.6 Mlb of
contained U3O8 reported above a 250ppm U3O8 lower cutoff (Measured Resource of 1.7 Mt at 1720ppm
eU3O8 for 6.5 Mlb of contained U3O8, Indicated Resources of 1.5 Mt at 1270ppm eU3O8 for 4.2 Mlb of
contained U3O8 , and Inferred Resources of 12 Mt at 640ppm eU3O8 for 16.8 Mlb of contained U3O8) for
the broader Honeymoon deposit in the Curnamona Uranium Province, South Australia.
This represents a 66% increase in reported global metal endowment to the previous 2015 Inferred
Mineral Resource of 5.3 Mt at 1400 ppm eU3O8 for 16.6 Mlb of contained U3O8 which was reported
above a 500ppm U3O8 lower cut-off (Note: The 2015 Mineral Resource did not state resources at a
250ppm U3O8 lower cutoff so no direct comparison is possible) and a 31% increase in global metal
endowment when a directly comparable 500ppm eU3O8 cutoff is used (6.9Mt @ 1420ppm eU3O8 for
21.7Mlb of contained U3O8). The increase in endowment and Resource Classification is related to a
better understanding of the geology, mineralisation continuity and volume due to the advanced 3D
geostatistical modelling used. Benchmarking to similar operating uranium projects worldwide indicates
that a 250ppm eU3O8 lower cutoff should be the preferred reporting option.
Since the acquisition of the Honeymoon Project on 30 November 2015, Boss geologists have undertaken
an extensive review of the historical exploration, drilling and geology, and have generated a cohesive 3D
Suite 23, 513 Hay St, Subiaco WA
PO Box 1311, Subiaco WA 6904
P: +61 (8) 6143 6730
E: admin@bossresources.com.au
ABN 38 118 834 336
model (Figures 1 and 2) of the Brooks Dam, Honeymoon and East Kalkaroo mineralisation that covers
5km of the 50km mineralised trend hosted by the Yarramba Palaeochannel, directly around the main
Honeymoon processing facility (Figure 1). Boss understands that this is the first time the combined
resources have been modelled in 3D which will be invaluable in assisting the technical and development
teams to understand the orebody from both an exploration and mining perspective and will allow for
more accurate design of production wellfields and screen placement in each hole.
Figure 1: Location of the Honeymoon Resource update (top) and extent of the 3D model of +250ppm eU3O8 resource outline with drill positions;
and (bottom) mine infrastructure adjacent to the high-grade Measure and Indicated Resources.
2
The Honeymoon Project boasts one of the highest grade uranium resources held by any ASX-listed
uranium developer. Importantly, the resources are all within Boss’s existing Mining Lease (ML 6109) and
located next to its fully constructed and permitted production facility (Figure 1).
The current exploration database contains multiple high grade mineralised intercepts over 1km along
strike which are outside the existing resource boundaries highlighting the potential for future resource
expansion (Figure 1).
Based upon the review by the Boss technical team, there is an additional Exploration Target in the
Honeymoon region of between 7 and 14 Mt at a grade range of between 300 to 1500ppm U3O8 for a
potential endowment of between 8 to 23 Mlb of contained U3O8 along strike and exclusive of the current
resource. The global Exploration Target for Boss’s entire 2,600km2 tenement package is currently
estimated to between 42 to 100 Mlbs of contained U3O8 (32 Mt to 78 Mt at a grade between 450 to
1400ppm U3O8). (See ASX announcement: 8 December 2015.) This Exploration Target is conceptual in
nature and there has been insufficient exploration to estimate a Mineral Resource. It is uncertain if
further exploration will result in the estimation of a Mineral Resource.
The Boss technical team is currently working on estimating resources at a number of other exploration
targets contained within its Honeymoon Uranium Project. Further updates will be released to the
market when available.
Dr Marat Abzalov, Director of Geology for Boss, commented: “The resource upgrade is another milestone
for the Company which underscores our confidence in the Project. I am extremely pleased with the initial
upgrade. The 3D modelling highlights the tabular nature of the mineralisation which should bode well
for ISL extraction. The geology compares very favourably with highly successful uranium mines in other
parts of the world and the resource has great potential to increase with some very low cost infill drilling.
I am convinced that we are only dealing with a fraction of the overall potential at Honeymoon in what
we believe is an exciting and underestimated uranium province.”
About the 2016 Mineral Resource Update
The updated Mineral Resource for the Honeymoon Project is summarised below in Table 1. See
Appendix 1 for the JORC Code 2012 reporting criteria and input parameters.
Table 1
2016 Honeymoon Project Mineral Resource
Covering the Honeymoon, East Kalkaroo and Brooks Dam Deposits
Reported Above a preferred 250ppm eU3O8 lower cut-off.
Classification
Million
Tonnes
eU3O8 %
Contained U3O8
(M Kg)
Contained U3O8
(M Lb)
Measured
1.7
1720
2.95
6.51
Indicated
1.5
1270
1.92
4.24
Inferred
12.0
640
7.62
16.8
Total
15.2
820
12.50
27.56
Note: Figures have been rounded. Quoted resources have been adjusted to exclude previous
production of approximately 335t of U3O8.
3
The 2016 Mineral Resource estimate incorporates the results of 1,689 drill holes utilising PFN pU3O8
grade data (564 holes for 69,401m) and natural gamma eU3O8 grade data (1,125 holes for 135,973m) for
a total of 205,375 metres of drilling. Drill spacing ranges from 10-30m by 10-30m (Honeymoon deposit)
to 30-50 by 50-80m (East Kalkaroo deposit) and 50-80m x 50m (Brooks Dam deposit). The model was
generated using Isatis and Micromine software and utilised localised uniform conditioning (LUC) to
emulate a selective mining unit (SMU) of 10m (x) by 10m (y) by 0.5m (z) which is deemed appropriate
for an insitu mining scenario. An insitu dry bulk density of 1.9 t/m3 was used.
In detail, the resources were estimated as 3D model constructed into blocks of 10x10x0.5m. The procedure
for estimating U3O8 grade into the blocks of 10m x 10m x 0.5m is as follows:
•
Composite the drill hole data into 0.5m composites.
•
Create the empty block model (prototype model) using 10x10x0.5m cells.
•
Unfolding of the composited data and the empty block model. All further geostatistical studies were
carried in the unfolded space.
•
Variography analysis of the U3O8 grades (PFN and Gamma grades are used together). Estimation
was made using Multiple Indicator Kriging (MIK), therefore analysis of the mineralisation continuity
has required construction several indicator variograms.
•
Estimation of grade into the panels using MIK method. Two sizes of panels were used, 20x20x0.5m
for the closely drilled Honeymoon deposit area,( approximately 20m dril sapcing), other parts of the
deposit utilised a 60m x 60m x 0.5m parent cell.
•
The panels were partitioned onto the 10x10x0.5m blocks.
•
Uniform Conditioning (UC) was undertaken on the panels. This required additional tests, data
transformations and geostatistical modelling:
- Verification of the diffusive grade distribution model and multi-Gaussianity property of the U3O8
variable
- Declustering of the data in order to obtain non-biased estimate of the data mean.
- Modelling the distribution of the 10x10x0.5m blocks applying support correction to the punctual
anamorphosis.
- Modelling the variograms of the U3O8 values, which was made by transforming them to the
Gaussian variable, constructing the Gaussian variograms and then back-transforming to the raw
variable variograms.
- Estimating dispersion variance for the panels grade estimates.
- Undertake UC estimate of the panels. The methodology was applied twice, separately for the
detailed study area where panels were 20x20x0.5m and for remaining part of the domain
where panels are 60c60x0.5m in size.
-
Estimate grade of the 10x10x0.5m blocks using Localised Uniform Conditioning algorithm. The
blocks were ranked using Ordinary kriging. The LUC method was applied separately for
20x20x0.5m and 60x60x0.5m panels.
-
Combining two LUC models into a single block model and back-folding it to the real space.
4
Figure 2: Example cross-section of the Yarramba palaeochannels: (a) main lithotypes; (b) distribution of uranium mineralisation in the
palaeochannels at a 250ppm U3O8 cutoff.
5
About the Honeymoon Uranium Project
The Honeymoon Uranium Project (Figure 3) is located in the Curnamona Uranium Province, South
Australia, approximately 80km north-west from the town of Broken Hill near the SA / NSW border. The
Project consists of 1 granted Mining Lease, 5 granted Exploration Licenses, 8 Retention Leases and 2
Miscellaneous Purposes Licenses.
There are 2 main exploration regions: the Honeymoon Region (ELs 5215 and 5621) which hosts the
Honeymoon, Brooks Dam and East Kalkaroo Resources; and the Billeroo Region (ELs 5043, 5623 and
5622) which hosts the Gould’s Dam and Billeroo deposits which have historical non-JORC grade
estimates.
Figure 3: Honeymoon Uranium Project. The yellow shaded regions represent palaeodrainage channels which have potential to host
uranium mineralisation and are the focus of exploration efforts.
6
Exploration Team
Dr Marat Abzalov
Dr Abzalov graduated with High Distinction from the Kazan University in Russia in 1983 and obtained his
PhD (Geology) in 1987 from St. Petersburg University, Russia, completing a thesis on magmatic nickel
sulphide near the western Russian border with Finland. He has undertaken post-graduate studies in
Applied Mathematics at Murdoch University, Perth, and Geostatistics at the Centre of Geostatistique,
Fontainebleau, France.
With over 30 years of post-graduate experience in geology, Dr Abzalov’s work experience includes the
Russian Academy of Sciences, WMC Resources where his last role was Geology Manager – Projects, and
Rio Tinto, where he held the roles of Manager – Geostatistical Consultant and Exploration Manager –
New Opportunities (Eurasia) AND where he predominantly reviewed ISL uranium projects in Kazakhstan
and the USA.
During his professional career, Dr Abzalov has worked on 12 uranium projects worldwide, notably:
•
•
•
•
•
•
Rossing (Namibia) – resource model for a long term mine plan
Olympic Dam (Australia) – pre-feasibility study
Ranger (Australia) – optimisation resource definition drilling programme
Khan (Jordan) – technical director responsible for all aspects from conceptual exploration model to
resource definition drilling
Budenovskoe (Kazakhstan) – identified acquisition opportunity for Rio Tinto
Sweetwater (USA) – development of a new geochemical exploration approach
Mr Neil Inwood
Neil Inwood is a professional geologist with 20 years’ multi-commodity project and consulting
experience in Australia, Africa, USA, Europe, South America and Central Asia. Neil has a BSc in Geology
from Curtin University, an MSc in Geology from the University of Western Australia and has studied
geostatistics at Edith Cowen University.
Neil is also the Geology Manager for Cradle Resources and was a Principal Consultant with the
international mining consultancy group, Coffey Mining, and was the Competent Person (ASX) / Qualified
Person (TSX) for a variety of international uranium, gold, nickel, base metal and iron ore projects. Neil
has consulted on uranium projects in Australia, Czech Republic, Columbia, Hungary, Namibia and the
USA and was the lead resource consultant on the world-class Husab uranium deposit in Namibia. Other
uranium projects include:
•
•
•
•
•
•
•
Extract Resources – the Husab Uranium project in Namibia
Bannerman Resources – Etango Uranium Project in Namibia
Deep Yellow – Namibia and Australian Projects
Energia – Nyang ISL Project in Western Australia
Wildhorse Energy Ltd – Pecs Uranium project in Hungary
U3O8 Corp – Argentine and Brazilian U Projects (Berlin Project)
Atom Energy – Utah Projects
7
HONEYMOON GEOLOGY
The Honeymoon Uranium Project is located in the southern part of the Callabonna sub-basin in South
Australia. Uranium mineralisation within the project area is hosted by the Yarramba and Billeroo
palaeochannels (Figure 3). These consist of Palaeogene age palaeovalleys filled by a sequence of interbedded sand, silt and clay). Thickness of the palaeochannels at Honeymoon deposit area reaches a
maximum of 55m thick, and the base of the Yarramba channel is around a depth from surface of
approximately 110 metres.
The uranium mineralisation represents a classic basal channel type sandstone-hosted uranium roll-front
model. This model implies the movement of oxidised, uranium-bearing fluid through a largely reduced
aquifer, with mineralisation occurring at the redox front of the fluid. A geochemical zonation is
associated with the roll front, including oxidation of the sands upstream (orange and yellow limonite)
and abundance of pyrite/marcasites and organic matter downstream. Mineralisation is associated with
discreet accumulations of organic matter and pyrite within the palaeovalley sequence.
Distribution of the uranium accumulations within the palaeochannels is controlled by fluid pathways
that have transported the dissolved uranium and the distribution of organic matter which served as
reductants causing precipitation of uranium. Interplay of these two main factors has created a stacked
geometry of the “uranium rolls” commonly distributed as elongate pods along the strike of the
palaeovalley. These features are similar to the uranium mineralisation styles seen in the Shinarump,
Monitor Butte and Moss Back members of the Upper Triassic Chinle formation in the White Canyon
areas of the uranium mining districts of South Eastern Utah USA.
The Company is not aware of any reason why the ASX would not allow trading in the Company’s shares to
recommence immediately.
For further information, contact:
Evan Cranston:
+61 (0) 408 865 838
Grant Davey:
+61 (0) 447 753 163
Competent Persons’ Statements
The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Dr. M.
Abzalov, who is a Competent Person according to the JORC 2012 Code. Dr. M. Abzalov is a Fellow of the AusIMM. He has sufficient
experience in estimation Resources of uranium mineralisation, and have a strong expertise in the all aspects of the data collection,
interpretation and geostatistical analysis to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting Exploration Results, Mineral Resources and Ore Reserves’. Dr. M.Abzalov is employed as a director of Boss Resources Ltd.
Dr. M. Abzalov consents to the inclusion in the report of the matters based on their information in the form and context in which it
appears.
The information in this document that relates to the Honeymoon Project Exploration Target and associated Exploration Data is based
on information provided by Mr. Neil Inwood, who is a Fellow of the AUSIMM. Consent is granted only for the purposes of outlining an
Exploration Target, no warranty is made on the use of the exploration information and data for other purposes. Mr Inwood is a
consulting geologist and has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity undertaken to qualify as Competent Persons as defined in the 2012 edition of the “Australasian Code
for Reporting of Mineral Resources and Ore Reserves”. Mr. Inwood has consented to the inclusion of this information in this document
in the form and context in which it appears. An entity associated with Mr Inwood has shares in Boss Resources Ltd. This information
was initially reported to the ASX on 8 December 2015 and has not materially changed.
8
Appendix 1.
JORC Table 1: Section 1 Sampling Techniques and Data
Criteria of JORC
Code 2012
Sampling
techniques
Drilling
techniques
Drill
sample
recovery
Logging
Sub-sampling
techniques and
sample
preparation
Quality of assay
data
and
laboratory tests
Reference to the Current Report
Comments / Findings
Two types of data were used for the current estimation resources of the Honeymoon Project. These are eU3O8
estimated from the down-hole gamma-logs and pU3O8 obtained using down-hole PFN analyser.
All tools were maintained by specialised electronic companies in Adelaide, including Geoscience
Australia Pty Ltd and CIRAPL Pty Ltd.
Calibration was regularly undertaken using in-house calibration pits available at the Honeymoon Project and
externally, at the certified calibration facilities at Glenside, ConyIngham St, Adelaide.
Standard industry procedures were used for geophysical logging of the drill holes and estimation from the
geophysical logs for the eU3O8 (from the gamma-ray logs) and pU3O8 (from the PFN instruments) grades
Resources of the Honeymoon Project were developed using rotary mud drilling (100 mm to 228 mm in
diameter) accompanied by the down hole logging using gamma-ray based technologies and, more
recently, by the PFN instruments
Drill cuttings of the rotary-mud drilling were collected at 2 m intervals, geologically logged and
preserved as a physical record of the hole.
During a detailed drilling campaign in 2004 – 2006 seven rotary-mud drill holes were partially cored.
Core drilling was by conventional 100 mm triple-tube with 6” OD core barrel. Core recovery was highly
variable and in general poor.
Geophysical instruments were accurately calibrated as per industry standards.
Chip samples, collected at 2 m intervals, have been photographed and geologically logged.
Documentation has included colour, grain size, texture, sorting, alteration and oxidation state.
Downhole electric logs (resistivity, conductivity and porosity) were systematically used through the
palaeochannel.
All mineralised intervals were geologically logged with logging standards compliant with the industry
standards.
Not applicable, because grade was deduced from down-hole geophysical logs.
QA/QC of the geophysical data has included systematic control of the depth logged and control of the
recorded U3O8 grade values.
The historic data was validated by the PFN logs.
Geophysical tools estimate uranium content at large volumes, approximately 25 to 40 cm radius. The
volume is sufficiently large allowing accurate measure of the grade.
Not applicable, because grade was deduced from down-hole geophysical logs.
Geophysical tools used to collect data were as follows:
• Auslog Gamma (with Guard) S422
• Induction (run with guard) S423
• Prompt Fission Neutron tool PFN#4
• Prompt Fission Neutron tool PFN#8
• Prompt Fission Neutron tool PFN#27
• Prompt Fission Neutron tool PFN#32
• Gamma combined with guard S058
• Auslog 3 arm calliper A326
Holes were logged in down and up directions, which provided a good control of logging consistency.
All geophysical tools were regularly calibrated, using in-house facilities and the certified laboratories in
Adelaide.
QA/QC of the geophysical data has included systematic control of the depth logged and control of the
recorded U3O8 grade values.
The winches in the logging truck have their depth calibration checked periodically. This is made by
running out approximately 100m of cable and measuring the rewinding cable against a tape measure.
In addition, markers are placed on the cables which are checked on the computer at 50 and 100 metres.
Since each individual tool run measures gamma, post logging depth matching is undertaken within
9
Verification of
sampling and
assaying
Location of data
points
Data
spacing
and distribution
Orientation of
data in relation
to
geological
structure
Sample security
Audits
reviews
or
WellCad® so each tool is adjusted as necessary to the reference. Precision of 10 cm applied to collar
RLs and lithological boundary picks.
A QA/QC of PFN grades was undertaken by comparing PFN results with XRF assays of quarter core
(Lawie, 2006). His report states that: “the volume of rock ‘measured’ by the PFN is 630 times that of ¼
core, which must improve the representivity of the sample, and hence lower the field sampling error.”
The historic gamma-log data were validated by the PFN logs.
42 resource definition drill holes have been twinned with production wells allowing comparison with
historic gamma-log results with the PFN deduced grades.
Logging data is transferred from logging truck computers to servers in geological office as LAS files (an
industry standard log file format).
Geological logs are entered on paper then transcribed on to excel spreadsheet. Logging was carried
out by either in house U1A loggers or external logging contractors (Borehole Wireline Pty. Ltd. and
Independent Logging services). Significant intersections were then verified by U1A site geologists.
Primary data is recorded directly to computer hard disk in the logging truck and transferred to a
server at the end of the days logging. Each log is reviewed by the logger and a copy of the raw data
file and the prepared log were then handed over to the site geologist. The site geologist will make any
depth corrections required and then use the log to interpret geology.
Copies of raw LAS files, geological logs of chip cuttings and final WellCad Logs are kept on the server.
The site geologist makes depth corrections as required and then uses the log to interpret geology.
For the HML program, Haines Surveys established a 40m grid over the Honeymoon deposit area using
a Trimble 4000 Real Time Kinematic (RTK) GPS system, whilst simultaneously collecting gravity
readings. Accuracy of the system is better than 2cm both vertically and horizontally. This grid,
preserved by wooden pegs, was used to locate the majority of the drilling in these programmes, with
the rig being positioned to within sub-metre accuracy from the locating peg. Any off-grid holes were
triangulated using measurements from at least three surrounding pegs.
While the completed holes were being logged, each collar was also picked up using a handheld GPS,
to ensure the correct grid peg location was used. Final RLs for all holes were calculated from an
Inverse Distance Squared gridded model of the AHD levels collected during Haines’ Survey
For all later series of holes, positions are set out using a Garmin handheld GPS, after drilling, hole
locations are picked up with a differential GPS system that is coupled to the Omnistar augmentation
system to improve accuracy.
The projection adopted for surveying is GDA 94, MGA zone 54 with AHD elevation. All surveys were
tied to the existing registered base stations.
Topographic control was improved by Aerometrx Pty. Ltd flying 10cm pixel aerial photography which
was rectified using registered survey points installed at site before plant construction began.
Drill holes on the Honeymoon deposit are spaced at an average of about 10-30 x 10-30m, however,
locally the distances between drill holes are 5 x 5 m.
Drill hole spacing on East Kalkaroo vary, with some lines 50m apart, some 80m apart with along the
line spacing of around 50m.
Drill hole spacing on Brooks Dam are also variable with most lines 50m to 60m apart on 50m centres.
All holes are vertical, targeting the predominately flat lying sand units of the Eyre Formation.
These grids are suitable for estimation Mineral Resources.
Uranium grade is composited to 0.5 m.
All holes are drilled vertically which provides an accurate intersection of the flat laying mineralised
bodies.
Estimation is based on geophysical logs so no physical samples required. Geophysical logs are held on
a secure database, backed up to the Company’s secure server.
Data has been verified several times by independent consultants and found of a quality and accuracy sufficient
for estimation mineral resources. The most recent reports are as follows:
• Lawie, D, 2006 (ioGlobal)
• Bampton, 2006 (ORES)
• Skidmore, 2006 (Uranium One)
10
•
•
Jankowski, 2006 (SRK)
Valliant and Bergen, 2012 (RPA)
JORC Table 1: Section 2 Reporting of Exploration Results
Criteria of JORC
Code 2012
Reference to the Current Report
Mineral
tenement and
land
tenure
status
The Project consists of 1 granted Mining Lease, 5 granted Exploration Licenses, 8 Retention Leases and
2 Miscellaneous Purposes Licenses.
Exploration
done by other
parties
The Honeymoon deposit and surrounding areas of the Yarramba palaeochannel have been intensely
explored and systematically drilled starting from 1969.
Comments / Findings
The Mining license expires in 2023, exploration licenses expire in 2017 (except EL 5043 which expires
in 2016).
The Honeymoon Project was evaluated several times, with the degree of details varying from scoping
studies to bankable feasibility undertaken in 2006. The resource estimation reports are:
• Bampton (1998)
• Bampton (1999a,b,c)
• Bampton (2000)
• Stoker (2001). In 2001, P. Stoker estimated the project resources as 2.8 Mt of uranium
mineralisation at the average grade of 0.12% U3O8. This yields 3,300 t U3O8 based on no minimum
thickness and a cut-off grade of 0.01% U3O8 at Honeymoon and 1.2 Mt grading 0.074% U3O8
containing 910 t U3O8 with a grade-thickness (GT) of 0.38 and a cut-off grade of 0.01% U3O8 in East
Kalkaroo (Stoker, 2001).
• Bampton (2006). In 2006, K.Bampton estimated 1.2 Mt, grading 0.24% U3O8, containing 2,900 t
U3O8 based on data from drilling programs in 2005 and 2006.
• Cherry (2013). In 2013 J.Cherry revised the resources using 2D polygonal method and
grade*tonnage contours.
Geology
Palaeochannel type sandstone hosted uranium rolls
Drill
hole
Information
See previously exploration announcements and drillhole collar diagrams.
The topography in this region is predominantly flat.
All holes were drilled vertically with an average hole length of approximately 120m.
70
70
60
Average RL (m) of the SAMPLES in the given layer
60
Average RL (m) of the SAMPLES in the given layer
Accumulation
(ppm x metre)
Grade
(U3O8 ppm)
50
40
30
20
10
0
50
40
30
20
10
0
Eyre (Upper)
Eyre (Middle)
Eyle (Lower)
-10
-10
-20
-20
0
200
400
600
Average U3O8 (ppm) grade per 1 m layer
11
800
0
200,000
400,000
600,000
800,000
Accumulation per 1 m layer
1,000,000
Data
aggregation
methods
Aggregation was not undertaken.
Relationship
between
mineralisation
widths
and
intercept
lengths
Drill traverses are oriented at right angle across the domain strike.
Diagrams
Appropriate and relevant diagrams have been included in the announcement.
Balanced
reporting
Balanced reporting has been adhered to. See previous exploration announcements and 2015 resource
statement.
Other
substantive
exploration data
Mineralisation is still open along the strike of the domain.
Further work
Current study was focused on estimation resources of the Honeymoon Project which is located within
the median part of the palaeochannel. Strike length of the domain was constrained by the available
drill holes and does not represent an actual termination of the uranium rolls. Several drill holes, drilled
along the strike of the Honeymoon deposit have intersected high grade uranium mineralisation
suggesting that the deposit can be extended along the strike.
Holes are drilled vertically down.
Exploration targets in the areas adjacent to the Honeymoon Domain
12
JORC Table 1: Section 3 Estimation and Reporting of Mineral Resources
Criteria of JORC
Code 2012
Database
integrity
Site visits
Geological
interpretation
Reference to the Current Report
Comments / Findings
Historic logging was collected onto paper via analog chart. The analog charts were digitised during the
late 1990’s. The library of the analog charts was kept by U1A and has been sighted by the CP.
Geological logs were handwritten onto paper forms and later transcribed into digital form via input
into spreadsheet, the original handwritten logs form part of the library.
Downhole Logging data for all recent drilling has been in digital format directly into industry standard
LAS files stored on servers.
Geological logging was done on paper, then entered into Excel spreadsheets or entered directly into
Excel.
All downhole logging data was loaded into a Microsoft Access database and a series of checks
undertaken where no serious transcription errors have been found.
Queries have been run on the data set to check for missing intervals, extreme values (high-low),
logging speed too high and any suspect data has been checked or removed if needed. During this
process, 3 holes that had incorrect calibration factors were found, their grade was recalculated using
the correct calibration parameters.
M. Abzalov has visited site as part of