BOSS RESOURCES INVESTOR PRESENTATION
Released
Released
Announcement PDF
Honeymoon Uranium Project, South Australia
Near term production with substantial exploration upside in underexplored
Uranium Province
Investors presentation, February 2016
DISCLAIMER
The information contained in this presentation or subsequently provided to any recipient of this presentation whether orally or in writing by or on behalf of Boss Resources
Limited (“Boss”) or its respective employees, agents or consultants (Information) is provided to the recipients on the terms and conditions set out in this notice. The purpose
of this presentation is to provide recipients with information relating to Boss Projects.
This presentation does not constitute investment advice and has been prepared by Boss without taking into account the recipient’s investment objectives, financial
circumstances or particular needs. Each recipient must make his/her own independent assessment and investigation of Boss and its business and assets when deciding if an
investment is appropriate and should not rely on any statement or the adequacy and accuracy of any information. This presentation is in summary form and does not purpose
to be exhaustive. This presentation should be read in conjunction with Boss’ periodic and continuous disclosure announcements lodged with the Australian Securities
Exchange, which are available to download at www.asx.com.au.
Boss makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of the Information. Boss and its directors, employees,
agents and consultants shall have no liability (including liability to any person by reason of negligence or negligent misstatement) for any statements, opinions, information or
matters (express or implied) arising out of, contained in or derived from, or for any omissions from the presentation, except liability under statute that can not be excluded.
This presentation may contain forward-looking statements. Forward-looking statements are only predictions and are subject to risks, uncertainties and assumptions which are
outside the control of Boss. Actual values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties,
recipients are cautioned not to place reliance on forward-looking statements.
This presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss pursuant to the Corporations Act 2001 (Cth) and has not been lodged
with the Australian Securities and Investment Commission.
The information in this presentation that relates to Exploration Results and Mineral Resources is based on information compiled by Dr. M. Abzalov, who is a Competent Person
according to the JORC 2012 Code. Dr. M. Abzalov is a Fellow of the AusIMM. He has sufficient experience in estimation Resources of uranium mineralisation, and have a
strong expertise in the all aspects of the data collection, interpretation and geostatistical analysis to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves’. Dr. M.Abzalov is employed as a director of Boss Resources Ltd. Dr. M. Abzalov
consents to the inclusion in the report of the matters based on their information in the form and context in which it appears. This information was initially reported to the ASX
on 1 September 2015 and 20 January 2016 and has not materially changed.
The information in this presentation that relates to the Honeymoon Project Exploration Target and associated Exploration Data is based on information provided by Mr. Neil
Inwood, who is a Fellow of the AUSIMM. Consent is granted only for the purposes of outlining an Exploration Target, no warranty is made on the use of the exploration
information and data for other purposes. Mr Inwood is a consulting geologist and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity undertaken to qualify as Competent Persons as defined in the 2012 edition of the “Australasian Code for Reporting of Mineral
Resources and Ore Reserves”. Mr. Inwood has consented to the inclusion of this information in this document in the form and context in which it appears. An entity
associated with Mr Inwood has shares in Boss Resources Ltd. This information was initially reported to the ASX on 8 December 2015 and has not materially changed.
The Exploration Target is conceptual in nature as there has been insufficient exploration to define a Mineral Resource. It is uncertain if further exploration will result in the
determination of a Mineral Resource under the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, the JORC Code” (JORC 2004).
The Exploration Target is not being reported as part of any Mineral Resource or Ore Reserve.
2
HIGHLIGHTS
PERMITTED
Fully permitted Uranium
operation (only 1 of 4 in
Australia)
3
TARGET
100mlb exploration target
Huge 80+ km potentially
mineralised strike
2,600km under explored
uranium province
27mlb U3O8 JORC Resource
INFRASTRUCTURE
LOW CAPEX
$170m plant and
infrastructure in place
Unique option on Uranium price –
operations can commence with
low CAPEX targeting cash costs of
<$25/lb production
CORPORATE STRUCTURE
Existing Shares (ASX:BOE)
855 million
Performance Rights*
40 million
Options ($0.02 Aug 18)
10 million
Cash (31 Dec 2015)
$2.4 million
Market Capitalisation (at $0.042)
$36 million
Top 100 Shareholders
Share Price Movement
0.06
0.05
0.04
0.03
0.02
~ 80%
0.01
0
Shareholder Breakdown
Directors & Related Parties – 14%
Offshore Holdings – 12%
Australian High Net Worth
and Retail – 70%
4
Nominee Companies – 4%
*10 million rights convert if share price is greater than 7.5c for 20 consecutive ASX trading days
3.3 million rights convert if share price is greater than 8.5c for 20 consecutive ASX trading days
13.3 million rights convert on discovery and decision to mine of 75kt Ni JORC resource on Scandinavian Projects
13.3 million rights convert on discovery and decision to mine of 125kt Ni JORC resource on Scandinavian Projects
DIRECTORS
• Evan Cranston
Chairman
Mr. Cranston is a corporate lawyer with experience in publicly listed entities including capital raisings,
offerings, and liaison with market analysts and investors.
• Marat Abzalov
Executive Director - Geology
Mr. Abzalov has a PhD in Geology. Marat has recently completed an invited study of ISL styles of
mineralization, including those in Australia. He is also an ex-Exploration manager for Rio Tinto Eurasia, with
extensive experience in Kazakhstan uranium projects.
• Grant Davey
Executive Director
Mr Davey is a mining engineer with 20 years of senior management and operational experience in the
construction and operation of Uranium, gold, platinum and coal mines in Africa, Australia, South America
and Russia.
• Peter Williams
Technical Director
Mr. Williams is an explorationist/geophysicist with over 30 years experience. He has extensive experience in
West Africa, Australia, Fennoscandia, and Canada.
5
PEER COMPARISON
ASX LISTED STOCKS
Company
Toro Energy
(ASX:TOE)
Vimey (Energy &
Minerals)
(ASX:VMY)
Initial
Capex
(AUD$)
Mining
Permit
Resource
mlb
Grade
PPM
Mining
Type
Market
Cap
C1
Costs
US$/lb
Comments
315m
✗
75.3
485
Bulk
surface
$124m
33
$29.5m invested by
Sentient
378m
✗
65.6
520
Surface
$68m
23
RCF provided $30m
funding
476
ISL
$158m
43
Recent raising $69m
RCF, Paladin, Blackrock,
JP Morgan
Peninsula
Resources
46m
(stage 1)
✓
51.2
(Lance
Deposit)
Berkeley
Resources
169m
✗
84.0
483
Hard rock
Open pit
$86m
24
In feasibility studies
Energia
190m
✗
18.4
310
ISL
$19m
20
Sold to Paladin $15.8m
exploration project
Constructed
✓
27.6
820
ISL
$36m
Target
<25
(ASX:PEN)
(ASX:BKY)
(ASX:EMX)
Boss Resources
(ASX:BOE)
6
HONEYMOON
PROJECT TIMELINE
ISL Leach Facility Field Leach trials
Honeymoon
Constructed
Successfully
EIS Completed
Discovered (Never operated)
completed
1970’s
1982
1998
2001
Feasibility
Postponed for
Feasibility
Commenced Further drilling
2002
2004
New Feasibility Honeymoon construction
Commissioning
Study 400tpa
commenced
ISL mine
51%/49% JV with Mitsui commences
2006
2008
2011
Mitsui sells
49% to U1A
2012
Placed on BOSS Resources
Care &
Acquires
Maintenance Honeymoon
2015
2013
US$137.50
FUKUSHIMA
DISASTER
US$112.50
US$87.50
US$62.50
US$36.95
US$12.50
CORPORATE TIMELINE
1997
7
Southern Cross
(SXR) acquires HM
from MIM
2005
SXR merges with Aflease
Gold & Uranium Pty Ltd
(SXR Uranium One Inc.)
2008
Rosatom Acquires
16.6% in
Uranium One
2011
Rosatom Increases
stake In Uranium
One to 51.1%
2013
Rosatom Acquires
100% of Uranium One
HONEYMOON
TRANSACTION
•
Acquiring 80% of Uranium 1 Australia Pty Ltd (option to acquire 100%)
-
8
20% free carried to DFS acquisition at independent valuation
•
Site access fee A$200,000 payable on signing HOA - PAID
•
A$2.48 million payable 3 months after signing SPA
•
A$3 million payable on anniversary of 2 years of signing the SPA
•
A$4 million payable on anniversary of 4 years of signing SPA
•
Later of 5 years or 3 months of production
-
A$2 million in cash or Boss shares (our elective)
-
A$3 million from Net Operating Cash Flow (10% per annum)
AUSTRALIAN
URANIUM PROJECTS
•
One of the highest grade un-mined
uranium resources in Australia
•
1 of 4 fully permitted uranium projects
in Australia (3 in South Australia)
•
Curnamona Basin – a significant
underexplored uranium province
•
Exploration target of up to 100 Mlb
U3O8 on 2600km2 of tenement area
•
Currently on care and maintenance
LEGEND
Operational Mine
Major Deposit
Former Mine
9
HONEYMOON RESOURCE
Significant existing high-grade resources – highest grade amongst ASX listed peers
2016 Honeymoon Project Mineral Resource
Covering the Honeymoon, East Kalkaroo and Brooks Dam Deposits
Reported Above a preferred 250ppm eU3O8 lower cut-off.
Classification
Million
Tonnes
eU3O8
ppm
Contained U3O8
(M Kg)
Contained U3O8
(M Lb)
Measured
1.7
1720
2.95
6.51
Indicated
1.5
1270
1.92
4.24
Inferred
12.0
640
7.62
16.8
Total
15.2
820
12.50
27.56
Note: Figures have been rounded. Quoted resources have been adjusted to exclude previous production of approximately 335t of U3O8.
10
HONEYMOON
URANIUM PROJECT
11
•
Located 75Km NW of Broken Hill, in the Curnamona
Region of South Australia
•
Project contains the Honeymoon Resource, a highgrade sandstone hosted Uranium deposit amenable
to insitu-leach mining techniques
•
Holdings include the granted Honeymoon ML, 4 EL’s
and 8 RL’s
•
Mineralisation occurs at 90-120m depth in
unconsolidated sand aquifers at the base of a
Palaeochannel
•
Over 2,500 historical and recent drill holes have been
completed between 1960-2012
•
Recent airborne electromagnetic survey has outlined
significant targets warranting further investigation
•
Multiple styles of uranium mineralisation identified
EASTERN TENEMENTS
EXPLORATION POTENTIAL
•
•
Recently upgraded resource increase by 66% - 2 months
from acquisition
Regional exploration target of 11-25Mt at between 380 and
1200 ppm U3O8 for between 18-47MLb of contained U3O on
Eastern Tenements1
•
30 km of potentially mineralised strike
•
Drill ready targets - historical drilling shows numerous >
1,000ppm U3O8 intercepts associated with well defined paleo
channels.
–
Three priority regions – Yarramba, Jasons and Lawlors.
–
Early potential for resource definition
•
Regional scale assessment recently undertaken - Airborne EM
survey conducted to identify Tertiary palaeochannels with
brackish groundwater: prospective host for uranium
mineralisation
•
Advanced targeting model utilising numerical prospect
scoring system developed
12
YARRAMBA
NOTRH
JASONS
LAWLOR
S
ML6109 - Honeymoon
Historical & Recent Drilling Intercepts
1The Exploration Target is conceptual in nature as there has been insufficient exploration to define a Mineral Resource. It is uncertain if further exploration will result in the determination of a
Mineral Resource under the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, the JORC Code” (JORC 2004). The Exploration Target is not being
reported as part of any Mineral Resource or Ore Reserve.
HONEYMOON RESOURCE
SIGNIFICANT EXPANSION POTENTIAL
13
RESOURCE LOCATION
14
TYPICAL HONEYMOON SECTION
•
•
•
Mineralisation within permeable Basal Eyre sands and gravels
Uranium mineralogy of acid-soluble uraninite, coffinite, and uranium phosphates
Mineralisation 115-125m below surface
Basal Clay (Seal)
Basal Sand (Ore
Horizon)
15
Upper Eyre
Formation
Namba Clay
(~75m)
HONEYMOON MINERALISATION
Basal Clay (Seal)
HML137C – 87.4m
(0% U3O8)
Oxidised Sands
HML137C – 102.30m
0% U3O8
Coarse Organics (Wood)
HML109C – 107m (~8.0% U3O8)
Redox Interface
HML137C – 109.70m
(~0.1% U3O8)
Basal Sand
Reduced Gravel
HML137C – 114.80m
(~0.6% U3O8)
Basal Sand
Reduced Gravel
HML137C – 114.80m
(~0.6% U3O8)
16
ISL PROCESS
Process Flow
An acidic leach solution containing an
oxidant is pumped through injection wells
into uranium-bearing solution.
The solution migrates through the strata
sands oxidising and mobilising uranium as a
soluble complex.
The solution, now referred to as pregnant
leach solution (PLS) is intercepted by
production wells, located between the
injection wells, and pumped to the surface.
17
INFRASTRUCTURE
Production Bore
Processing Facility
Water treatment plant
Control Room
Settling Ponds
Camp
18
WESTERN TENEMENTS
EXPLORATION POTENTIAL
•
54 km potentially mineralised strike
•
Exploration target of 21-53Mt at between 480 and 1400ppm U3O8
for between 24 and 53MLB of U3O82
•
Previously defined grade estimates in the Retention Leases
–
–
Validation and resource estimation underway
Some 300 drillholes drilled in recent years to be incorporated for the first
time
Goulds Dam / Billeroo system underrated:
•
–
–
–
12 km strike length
Under drilled
Highly prospective ground
•
EL5043 has pegmatite hosted mineralisation up to 3.5% U3O8 (grab
sample)
•
Broader Exploration licence under application
–
–
–
–
Potential for new paleochannels
Along trend of mineralised fluids
Massively under explored
Grades of up to 1% eU3O8 reported from historical drilling (1960 –
EAR19)
The Exploration Target is conceptual in nature as there has been insufficient exploration to define a Mineral Resource. It is uncertain if further exploration will result in the determination of a Mineral
19 Resource
under the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, the JORC Code” (JORC 2004). The Exploration Target is not being reported as part of
2
any Mineral Resource or Ore Reserve.
MILESTONES
✓ Project Acquisition
–
Lowest cost per lb acquisition in recent history
✓ Resource Upgraded
–
Increased Honymoon resource 66% to 27mlb U3O8
Further Resource Calculations underway
–
Convert exploration target into JORC resources
• Goulds Dam Target
• Jasons Target
Commence exploration Q2 2016
–
Target known mineralised areas for low cost additional resource
Option Study
–
–
20
Commence a process option study SX, IX, Eluex – March 2016
Expansion options depending on resource size
MARKET
WHY URANIUM?
Strong growth in demand
•
•
•
•
•
•
•
434 operating energy facilities require 78ktpa of U3O8
71 energy facilities under construction
167 energy facilities planned
300+ energy facilities proposed
2 energy facilities re-started in Japan with an additional
21 energy facilities applying for re-starting
Sept 2014 “Cooperation in the peaceful uses of nuclear
energy” signed with India
New reactors being announced monthly
Significant challenges towards establishment
of further supply
•
•
•
21
Delays in bringing further substantial projects into
production: environmental, financing , permitting
No expansion of existing operations
Secondary supplies under Russia-US HEU program ceased
end of 2013 (24Mlb/pa)
Source: www.sdu.sk
MARKET DEMAND
GLOBAL REACTOR GROWTH & URANIUM DEMAND
•
Global nuclear generation capacity will increase 70% over
the next decade from 374,067MWe to 636,693MWe
•
71 reactors under construction & 173 new reactors planned
•
Annual uranium demand will increase from 177mlbs to
280mlbs by 2020, representing a 58% increase
•
Additional 390mlbs will be needed for new initial cores
71
•
•
434
•
•
22
OPERABLE REACTORS
DECEMBER 2013
Generation Capacity: 374,067 MWe
Annual Uranium Demand: 64,978 tonnes U
UNDER
CONSTRUCTION
Generation Capacity: 74,886 MWe
Annual Uranium Demand: 13,000 tonnes U
173
•
•
PLANNED
REACTORS
Generation Capacity: 187,740 MWe
Annual Uranium Demand: 32,600 tonnes U
MARKET
NUCLEAR POWER – THE BEST SOLUTION
•
Nuclear power provides the best solution for a nonpolluting 24:7 base load power source
•
Zero Carbon Emissions
•
Over 430 existing nuclear plants, focused in Europe,
North America, Russia, South Korea and Japan
•
1.7 billion of the world’s population is still without
electricity
•
Emerging economies will need to implement a
combination of nuclear, coal, gas and renewables to
meet their growing power requirements
•
Nuclear power needs to be made readily accessible
and affordable to the emerging economies to
ensure that non-polluting sources are chosen in the
hunt for more power
23
MARKET
USA ELECTRICITY PRODUCTION COSTS, 2012, Dollars per MWhr
$36 Nuclear - CGS
$22 Nuclear - Average CGS-type
$23
Gas
$40
Coal
$70
Wind
$100
Solar
$19
Hydro
24
2012 ($) Costs per MWhr Produced
(after EIA, BPA and McCullough)
MARKET
URANIUM SUPPLY & DEMAND
•
Uranium consumption has exceeded
production for many years but recycled
supplies have left the market in
oversupply – sources of recycled
materials are now almost exhausted
Historical Uranium
Production vs. Usage
Military Requirements
Commercial Requirements
Uranium Production
Million lbs U3O8
Key sources of recycled materials
nearly exhausted:
200
Down blended weapons grade material Russian HEU agreement ends in 2013 Removes 24mlbs of secondary supply
Re-enriched or stripped tails - both
Russia and USA have largely exhausted
usable tails stockpiles
Excess government & utility inventory Inventories from US Dept. of Energy,
which will continue for 3-5 years at
most, have been acquired by TRAXYS
160
•
•
•
180
140
120
100
80
60
40
20
1945
1955
1965
1975
1985
1995
2005
Source: tradetech.com
25
0
MARKET
CHINESE NUCLEAR GENERATION 2012 - 2020
•
•
Between 2010 and 2013, China
purchased ~$15B of U3O8
China’s demand for U3O8 is forecast
to increase over 19 times by 2020
Annual
Uranium Demand
80,000
Mwe
Generation
Capacity
40,000
45,000
MTU
Mwe
22,000
13,995
MTU
Mwe
2,354
MTU
2012
26
2015
China imported 18,968 tU in 2013.
According to the Chinese General Administration of Customs, China imported 18,968 tU (~49.3 million pounds U3O8) in 2013. The country
reportedly imported uranium from five countries: Kazakhstan, Uzbekistan, Australia, Namibia, and Canada. China paid US$2.4 billion for its
uranium imports in 2013, (US$48.68 per pound U3O8 ).
2020
Graph Source: World Nuclear Association; China
Guongdong Nuclear Power Corporation; China
National Nuclear Corporation
COMPETITIVE ADVANTAGE
BOSS RESOURCES
27
TEAM
ASSETS
APPROVAL
LICENCED
Executives with project
management, development,
financing, and operation
experience
Honeymoon Uranium
asset in South Australia
Underestimated
uranium province
100mlb U3O8 target
All approvals
are in place
Only developed project
in Australia which is fully
licensed and able to be
brought into production
Suite 23, 513 Hay Street
Subiaco, WA 6008
+61 8 6143 6730
Evan Cranston
Grant Davey
+61 (0) 408 865 838
+61 (0) 447 753 7163
www.bossresources.com.au