Alta Mesa passes key milestone in uranium production ramp-up
Released
Released
Announcement PDF
ASX Release October 25, 2024
Alta Mesa passes key milestone in
uranium production ramp-up
Boss Energy Limited (ASX: BOE|OTCQX: BQSSF) is pleased to report that the production ramp-up at its 30
per cent-owned Alta Mesa Uranium Project in Texas has passed another important milestone, with the
first of three IX (ion exchange) plants nearing flow capacity.
The first IX plant was commissioned in June 2024 with the second IX plant planned to commence
operation in the first quarter of 2025 and the third IX plant planned to be online by year end of 2025.
Ion exchange is a filtration system which removes liquid uranium from groundwater before being dried
and processed into uranium yellowcake (U3O8).
Alta Mesa is ramping up to an annualised production rate of 1.5 million pounds U3O8. Boss’ share of this
production is 30 per cent.
The production update was reported by Alta Mesa’s 70 per cent owner enCore Energy Corp.
(NASDAQ:EU|TSXV: EU).
Paul Goranson, enCore’s Chief Executive said: “We have been very pleased with the initial phase of results
from Alta Mesa and production from the initial startup. We continue to work towards reaching full
capacity through 2025 with plans to be fully operational at all three of our ion exchange plants”.
Please refer to enCore’s announcement dated October 24, 2024 for further information1.
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Duncan Craib
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
1 enCore Energy Corp. announcement titled ‘enCore Energy Continues to Expand Uranium Production at the Alta Mesa Plant.’ dated October 24, 2024
https://www.sedarplus.ca/csa-party/records/document.html?id=9a0bcf2b03006157429d7041422f42509cbb0eb1d86676c035a5db57945e3a47
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Duncan Craib - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Paul Armstrong – Public Relations
+61 (08) 9388 1474
www.bossenergy.com
@Boss_Energy
Share your feedback
Discover