More high-grade drill results at Alta Mesa Uranium Project
Released
Released
Announcement PDF
ASX Release October 16, 2024
More high-grade drill results at Alta
Mesa Uranium Project, Texas
Boss Energy Limited (ASX: BOE|OTCQX: BQSSF) is pleased to report more strong drilling results from its
30 per cent-owned Alta Mesa ISR Uranium Project in South Texas.
The results of the drilling, which was designed to expand the producing wellfield capacity, continue to
significantly exceed the cut-off grade thickness requirements for In-Situ Recovery (ISR) of uranium.
The results were reported by Alta Mesa’s 70 per cent owner enCore Energy Corp (NASDAQ:EU|TSXV: EU).
EnCore also reports that production from its first wellfield continues to progress with increases in the
number of Alta Mesa production and injection wells on schedule for 2024 and continuing into 2025.
The Alta Mesa wellfield drilling operations, which commenced in March 2023, are advancing rapidly with
80 holes drilled since the previous update announced on March 18, 20241. In total, 749 drill holes have
been completed through mid-September 2024. At present there are seven (7) drill rigs in full operation at
Alta Mesa, with plans to double that number over the next twelve (12) months.
Please refer to enCore’s announcement dated October 15, 2024 for further information2.
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Duncan Craib
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
1
enCore Energy Corp. Announcement titled 'enCore Energy Encounters Highest Grade Drill Results at Alta Mesa Uranium Project; Provides Status
on South Texas Production Operations' dated March 18, 2024
https://www.sedarplus.ca/csa-party/records/document.html?id=ce7cfbfb51537487f6e2afdf08ad57e975b307e414c9229afce2926422a4190f
2 enCore Energy Corp. announcement titled ‘enCore Energy Continues to Encounter High Grade Drill Results from the Alta Mesa Uranium Project.’
dated October 15, 2024
https://www.sedarplus.ca/csa-party/records/document.html?id=744fc68bc7324711050b527b28fee210b7280edc50dc28686e95c17c76bb4c2d
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Duncan Craib - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Paul Armstrong – Public Relations
+61 (08) 9388 1474
www.bossenergy.com
@Boss_Energy
Share your feedback
Discover