Production Results
• Honeymoon quarterly drummed
production of 203 klbs (down 56%) and
IX production of 221 klbs (down 46%).
• Restated FY26 guidance to 1.40-1.45
Mlbs following rain disruption.
• Alta Mesa drummed production of
97 klbs (down 32%).
• NIMCIX column 4 completed in April
2026 with NIMCIX column 5 to be
completed by the end of FY26.
• Wellfield B5 commenced production in
Q3 FY26. Wellfield B6 to commence at
the end of FY26.
Strong Financial
Position
• Average realised price of $106.0/lb
(US$73.6/lb) from sales of $34.4 million
(US$23.9 million).
• C1 Cash Cost of $60/lb (US$41/lb) up vs
prior quarter of $30/lb (US$20/lb) due to
lower production.
• AISC of $93/lb (US$64/lb) up vs prior
quarter of $49/lb (US$33/lb).
• Reconfirmed C1 cost guidance of $36-
40/lb (US$24-26/lb) and AISC guidance of
$60-64/lb (US$40-42/lb).
• Balance sheet remains strong with
$211M of cash and liquid assets.
Further growth and
other initiatives
underway
• Released an updated Mineral Resource
Estimate (MRE) for Gould’s Dam with a
total of 38.7 Mt @ 388ppm U3O8 for
33.1 Mlbs of contained U3O8
1 and
• Jason’s Deposit update with a total
MRE of 13.3 Mt @ 410ppm U3O8 for
12.0 Mlbs contained U3O8.1
• Development pathway for both Gould’s
Dam and Jason’s Deposit has been
accelerated.
• Wide-spaced wellfields design
continues to confirm it as the optimal
pathway forward for Boss.
Q3 Highlights
Strong balance sheet, ongoing ramp up and progress on pathway forward
1. Refer to ASX announcement dated 19 March 2026 titled “Gould’s Dam and Jason’s Deposit Mineral Resource and Permitting Update” for detail. The company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the Mineral Resource Estimates in the original market
announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s finding are presented have not been materially modified from the
original market announcement.
Boss Energy | A global multi-mine Uranium producer 3
Honeymoon Production Results
Focus remains on infrastructure delivery and wellfields development
Honeymoon Quarterly Production
• Drummed production of 203 klbs lbs U3O8, down 253 klbs (56%).
• IX production of 221 klbs down 185 klbs (46%) due to heavy rain which
impacted production by restricting site access and limiting the delivery of
reagents and other goods required for production and plant
infrastructure ramp-up.
• Q4 FY26 production expected to increase to 356 klbs to 406 klbs as flow
increases, partially offset by an expected small decline in average tenor.
• Key activities for upcoming quarter are completion and commissioning of
NIMCIX column 5 and Wellfield B6.
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
500,000
3Q25 4Q25 1Q26 2Q26 3Q26
lbs
IX Production U3O8 Drummed
Boss Energy | A global multi-mine Uranium producer 4
Cost Performance
Cost guidance maintained at upper end of guidance range
Honeymoon Quarterly AISC and Realised price (A$/lb)
• C1 and All In Sustaining Cost increased due to a decline in drummed
production for the month which resulted in a lower fractionalisation of
fixed costs.
• C1 cost guidance of $36-40/lb (US$24-26/lb) and AISC guidance of $60-
64/lb (US$40-42/lb) reconfirmed towards the upper end of the guidance
range.
• Sustaining capex $1M lower reflecting a disruption to site access in
March. Sustaining capital spend for the quarter primarily reflected
wellfield construction costs at wellfields B6, EKT1 and B8.
• Project and supporting infrastructure capex was $3M lower, also
reflecting disruption to site access in March. Spend mainly related to
NIMCIX columns 4 and 5, the East Kalkaroo trunkline and the accelerated
delineation drilling program.
Key Metric Unit
Q3 FY26 Q2 FY26
AUD USD AUD USD
C1 Cash Cost $/lb 60 41 30 20
All In Sustaining Cost (AISC) $/lb 93 64 49 33
Capital expenditure
Sustaining $m 5 3 6 4
Project and Supporting Infrastructure $m 8 5 11 7
Total Capital Expenditure $m 13 9 17 11
0
50
100
150
Q1FY26 Q2FY26 Q3FY26
A$
AISC Realised price
Boss Energy | A global multi-mine Uranium producer 5
Financial Position
Boss remains in a strong financial position with exposure to rising uranium price
Sales and Inventory Units Q3 FY26 Q2 FY26
Sales and loan repayments1 US$000’s 23,906 25,886
Sales and loan repayments1 A$000’s 34,447 39,876
Average realised price2 US$/lb 73.6 74.0
Average realised price2 A$/lb 106.0 113.9
Sales lbs 325,000 350,000
Loan repayment lbs - -
Inventory on hand3 lbs 000’s 1,530 1,615
Cash and liquid assets Q3 FY26 Q2 FY26
Cash on hand A$000’s 38,024 52,857
Investments and other liquid assets A$000’s 48,876 44,912
Inventory on hand A$000’s 113,280 110,236
Trade receivable A$000’s 11,111 -
Total cash and liquid assets A$000’s 211,291 208,005
• Realised price reflects the sale of 125k lbs relating to a legacy contract. A
further 125k lbs will be delivered into this legacy contract in Q4 FY26 with
no further legacy contract deliveries in H1 FY27.
• Drummed inventory on hand decreased by 85 klbs to 1,530 klbs,
maintaining Boss’ exposure to a tightening uranium market.
• Balance sheet remains strong with $211.3M in cash and liquid assets.
• Of $34.4 million in Q3 FY26 sales, $11.1 million received in April 2026.
Boss Energy | A global multi-mine Uranium producer 6
Alta Mesa JV Production Results
Production increase relies on new wellfields and permitting
• Drummed production of 97 klbs down 46 klbs (32%) on the previous
quarter’ of 143 kbs (on a 100% basis).
• Boss received 35 klbs of drummed production, down from the prior
quarter of 68 klbs (49%) reflecting a decline in production.
• Permitting and bringing new wellfields online remain a priority.
• Alta Mesa East drilling ongoing, seeking to confirm the potential of
extensions of uranium mineralisation from Alta Mesa into Alta Mesa East.
Alta Mesa JV Quarterly Production (100%)
0
50,000
100,000
150,000
200,000
250,000
3QFY25 4QFY25 1QFY26 2QFY26 3QFY26
Drummed
(lbs)
Boss Energy | A global multi-mine Uranium producer 7
New Feasibility Study
Current understanding continues to be validated through technical studies
New Feasibility Study - Statement (Dec 25)1 Status Next Steps
Significant metal with good continuity, at
lower-grades.
• First of the internal 3D resource block
models completed.
• Resource delineation drilling ongoing.
• Updated interim JORC MRE and
continuation of delineation
drilling.
Good permeability & hydraulic connectivity
(flow rates and lixiviant control &
interaction).
• Completed 3D model of permeability
and initial Reactive Transport
Simulations.
• Commenced establishment of trial
patterns and wellfields.
• Continuation of modelling.
• Finalise the establishment of trial
wellfields.
Relatively low acid consumption given low
carbonate content and low acid-consuming
clays.
• Commenced additional mineral
characterisation and testwork.
• Completed initial Reactive Transport
Simulations with current wellfield
calibration.
• Refine inputs into the model and
run simulations with various
characteristics to test sensitivity.
Plume and groundwater behaviour
preventing excessive dilution of reagents.
• Completed initial Reactive Transport
Simulations on current Honeymoon
wellfields.
• Continual refinement of model
and assumptions
Honeymoon Deposit Characteristics – Current Understanding
Significant work being completed continues to support and derisk our Pathway Forward
Notes: 1. Refer to ASX announcement dated 18 December 2025 titled “Honeymoon Update - Amended” for detail.
Boss Energy | A global multi-mine Uranium producer 8
A “step-change” in our approach
Leading approach to ISR modelling
Wellfield Screens and Streamlines (Honeymoon)
• Reactive transport simulations is a computational technique that simulates the
movement of fluids and transport of dissolved chemical species through
porous substrate while simultaneously accounting for geochemical reactions.
• Development of the code commenced in the 1990 for safety assessment of
nuclear waste disposal in Europe.
• Typically used in highly complex studies associated with nuclear waste storage,
gas aquifer storage and environmental impact studies and applicable for ISR
Mining.
• Powerful tool for predicting fluid flow and geochemical reactions in the aquifer.
Reactive Transport Simulations
Boss Energy | A global multi-mine Uranium producer 9
Forming basis of the New Feasibility Study
Coupling hydrodynamics with chemical interactions between the fluid and host sequence
Permeability Distribution
Grade Distribution
Wellfield Design & Flow Rates
Fluid Flow (Streamlines)
pH (Mineral Dissolution / Dilution)
Uranium Depletion
1. Key inputs
• Hydrodynamic parameters
• Uranium distribution
• Spatial distribution of reactive minerals
• Wellfield Design (screen intervals,
injector & extractor locations)
• Flow rates (over time)
• Lixiviant chemistry
• Mineral kinetics
3. Key outputs
• Hydrodynamic behaviors
• pH evolution
• Plume chemistry
• Uranium leaching
• Mineral dissolution and precipitation
• Transportation of dissolved uranium
• Uranium pathway and extractor PLS
production
2. Reactive transport simulations
2 x Higher Performance Compute Nodes
(Singapore)
Boss Energy | A global multi-mine Uranium producer 10
Wide-spaced Wellfield
Wide-spaced trial patterns are being established
• Trial patterns will provide initial data during the flushing phase.
• Pattern areas cover 4x the surface area as compared to the current wellfield
design which increases the pounds under leach per wellfield.
• Trials have been established in several areas to optimise collection of data i.e.
trials are in previously contacted areas (HMT2), uncontacted areas (HMT1),
extension areas (HME1) and East Kalkaroo (EKT1).
• Pattern sizes range from 85m x 85m (60m injection to extraction well) to 100m
x 100m (71m injection to extraction well), an increase from 56m x 56m (40m
injection to extraction well) at Honeymoon.
Honeymoon Domain: Wellfield Designs
East Kalkaroo Domain: Wellfield Designs
Boss Energy | A global multi-mine Uranium producer 11
Gould’s Dam
The early development of the satellite deposits has been accelerated
Resource Category1
Ore Grade Metal
Mt ppm U3O8 kt U3O8 Mlbs U3O8
GOULD'S DAM
Indicated 7.5 465 3.5 7.7
Inferred 31.2 369 11.5 25.4
TOTAL 38.7 388 15.0 33.1
Mineral Resource update follows additional drilling and
improved understanding gained from the Honeymoon
Operation.
• Mineralisation is generally hosted in highly permeable unconsolidated sands with the
Mineral Resource constrained to permeable sequence considered amenable to in-situ
recovery (ISR) mining.
• The wide-spaced wellfield extraction approach being studied for Honeymoon is likely
to be applicable to Gould’s Dam, which could potentially lead to conversion of a
higher portion of the total Mineral Resource into a mine plan if successful.
• Mineral Resource update follows additional drilling and improved understanding
gained from the Honeymoon Operation. Total contained uranium has increased by
8.1Mlbs U3O8 (30%) and average grade has declined by 122ppm U3O8 (24%) from the
previous resource estimate (2016).
Notes
1: Refer to ASX announcement dated 19 March 2026 titled “Gould’s Dam and
Jason’s Deposit Mineral Resource and Permitting Update” for detail.
• Development pathway for both Gould’s Dam and Jason’s Deposit accelerated over the
past six months with all baseline and technical studies for permitting applications
being advanced.
Boss Energy | A global multi-mine Uranium producer 12
Jason’s Deposit
The early development of the satellite deposits has been accelerated
• Update follows additional drilling and improved geological and
mineralisation understanding.
• Total contained uranium increased by 1.3Mlbs U3O8 (9%) and
average grade has declined by 380ppm U3O8 (48%) from the
previous resource estimate (2017).
• Mineralisation remains open, providing scope for additional drilling
upside.
• The wide-spaced wellfield extraction approach being studied for
Honeymoon is likely to be applicable to Jason’s Deposit, which could
potentially lead to conversion of a material portion of the total
Mineral Resource into a mine plan if successful.
Resource
Category1
Ore Grade Metal
Mt ppm U3O8 kt U3O8 Mlbs U3O8
JASON’S DEPOSIT
Indicated 4.8 464 2.2 4.9
Inferred 8.5 380 3.2 7.1
TOTAL 13.3 410 5.4 12.0
Notes
1: Refer to ASX announcement dated 19 March 2026 titled “Gould’s Dam and Jason’s Deposit Mineral
Resource and Permitting Update” for detail.
Boss Energy | A global multi-mine Uranium producer 13
Summary
Honeymoon ramp-up and infrastructure progress
• Honeymoon Q3FY26 production impacted by adverse weather conditions
• Column 4 operational and column 5 will be in production during Q4FY26
• Significant progress made on the New Feasibility Study, with work
progressively validating and de-risking the pathway forward
• Revised production guidance to 1.40Mlb – 1.45Mlbs drummed uranium and
reconfirmed cost guidance
• Wide-spaced wellfields provide a scalable pathway across the broader
district, including Gould’s Dam and Jason’s Deposits
Appendices
Boss Energy | A global multi-mine Uranium producer 15
Appendix 1: Quarterly Cashflow bridge
52,857
23,237
(18,594)
(4,643)
(10,423) (1,257)
(2,758) (776)
380 38,024
Opening
Cash
Receipts
From
Customers
Honeymoon
Operating
Costs
Sustaining
Capex
Project &
Supporting
Infrastructure
Alta Mesa
Costs
G&A Exploration &
Investments
Other Closing
Cash
-
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
$000's
16
Boss Energy | A global multi-mine Uranium producer
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (Boss Energy or
Company).
NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the
recipient’s investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent
assessment and investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should
not rely on any statement or the adequacy and accuracy of any information. This Presentation is in summary form and does not
purpose to be exhaustive. This Presentation should be read in conjunction with Boss Energy’s periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of
the Information. Boss Energy and its directors, employees, agents and consultants shall have no liability (including liability to any
person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or
implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute that
can not be excluded.
FORWARD LOOKING STATEMENTS
All dollar amounts are in Australian dollars unless otherwise indicated. This announcement may contain certain statements and
projections provided by or on behalf of Boss Energy Limited with respect to the anticipated future undertakings. These forward-
looking statements reflect various assumptions by or on behalf of Boss Energy. Accordingly, these statements are subject to
significant business, economic and competitive uncertainties and contingencies associated with the mining industry which may be
beyond the control of Boss Energy which could cause actual results or trends to differ materially, including but not limited to price
and currency fluctuations, geotechnical factors, drilling and production results, development progress, operating results, reserve
estimates, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries, approvals
and cost estimates, environmental risks, ability to meet funding requirements, share price volatility. Accordingly, there can be no
assurance that such statements and projections will be realised. Boss Energy makes no representations as to the accuracy or
completeness of any such statement of projections or that any forecasts will be achieved. Additionally, Boss Energy makes no
representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under
statute or otherwise) is or will be accepted by Boss Energy or by any of their respective officers, directors, shareholders, partners,
employees, or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions or matters
(express or implied) arising out of, contained in or derived from this announcement or any omission from this announcement or of
any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In furnishing
this announcement, Boss Energy undertakes no obligation to provide any additional or updated information whether as a result of
new information, future events or results or otherwise. Nothing in this material should be construed as either an offer to sell or a
solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in isolation as a
basis to invest in Boss Energy.
EFFECT OF ROUNDING
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
PAST PERFORMANCE
Past performance information, including past share price performance of Boss Energy and pro forma financial information, given in
this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss Energy’s
(or anyone else’s) views on Boss Energy’s future financial performance or condition. Past performance of Boss Energy cannot be
relied upon as an indicator of (and provides no guidance as to) the future performance of Boss Energy. Nothing contained in this
Presentation nor any information made available to you is, or shall be relied upon as a promise, representation, warranty or
guarantee, whether as to the past, present or future.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy.
Keep in touch
+61 (8) 6263 4494
boss@bossenergy.com
ASX: BOE | OTCQX: BQSSF
March 2026 Quarterly Results
Share your feedback
Discover