Annual Report to shareholders
Released
Released
Announcement PDF
ANNUAL REPORT 2024
Boss Energy Ltd
ABN 38 116 834 336
ANNUAL REPORT 2024
Table of Contents
Corporate Directory ......................................................................................................................................... 1
Chairman’s Letter ............................................................................................................................................ 2
Review of Operations ...................................................................................................................................... 4
Directors’ Report ........................................................................................................................................... 11
Remuneration Report – Audited .................................................................................................................. 20
Auditor’s Independence Declaration ........................................................................................................... 46
Consolidated Statement of Profit or Loss and Other Comprehensive Income....................................... 48
Consolidated Statement of Financial Position ........................................................................................... 49
Consolidated Statement of Changes in Equity .......................................................................................... 50
Consolidated Statement of Cash Flows ...................................................................................................... 51
Notes to the Consolidated Financial Statements ....................................................................................... 52
Note 1
Basis of preparation ..................................................................................................................... 52
Note 2
Significant Incomes and Expenditures ...................................................................................... 62
Note 3
Income Tax Expense .................................................................................................................... 63
Note 4
Earnings Per Share ...................................................................................................................... 64
Note 5
Cash and Cash Equivalents ........................................................................................................ 65
Note 6
Trade and Other Receivables ...................................................................................................... 66
Note 7
Inventories .................................................................................................................................... 66
Note 8
Other Assets ................................................................................................................................. 66
Note 9
Plant & Equipment ....................................................................................................................... 67
Note 10
Right of Use Asset ....................................................................................................................... 67
Note 11
Intangible Assets .......................................................................................................................... 67
Note 12
Mine Properties in Development ................................................................................................ 68
Note 13
Investments in Uranium............................................................................................................... 68
Note 14
Other Financial Assets ................................................................................................................ 69
Note 15
Trade and Other Payables ........................................................................................................... 69
Note 16
Provisions ..................................................................................................................................... 70
Note 17
Issued Capital ............................................................................................................................... 71
Note 18
Reserves ....................................................................................................................................... 72
Note 19
Capital and Leasing Commitments ............................................................................................ 75
Note 20
Segment Reporting ...................................................................................................................... 76
Note 21
Financial Risk Management ........................................................................................................ 78
Note 22
Related Parties ............................................................................................................................. 80
Note 23
Group Entities ............................................................................................................................... 81
Note 24
Parent Entity Disclosures ............................................................................................................ 82
Note 25
Contingent Liabilities ................................................................................................................... 82
Note 26
Subsequent Events ...................................................................................................................... 82
Note 27
Auditors’ Remuneration .............................................................................................................. 82
ANNUAL REPORT 2024
PAGE I OF II
ANNUAL REPORT 2024
Consolidated Entity Disclosure Statement ................................................................................................. 83
Directors’ Declaration ................................................................................................................................... 84
Independent Auditor’s Report ...................................................................................................................... 85
Corporate Governance .................................................................................................................................. 89
Compliance with ASX Recommendations .................................................................................................. 90
Additional Information .................................................................................................................................. 96
ANNUAL REPORT 2024
PAGE II OF II
ANNUAL REPORT 2024
Corporate Directory
Directors
Mr Wyatt Buck
Mr Duncan Craib
Mr Bryn Jones
Ms Jan Honeyman
Company Secretary
Mr Derek Hall
Principal Place of Business and
Registered Office
Level 1, 420 Hay Street
Subiaco WA 6008
Ph: +61 8 6263 4494
Website: www.bossenergy.com
X: @Boss_Energy
Email: boss@bossenergy.com
Auditors
KPMG
235 St George’s Terrace
Perth WA 6000
Stock Exchange Listings
Australian Securities Exchange (ASX Code: BOE)
OTCQX Market (OTCQX Code: BQSSF)
Share Registry
Automic Registry Services
Level 5, 126 Phillip Street
Surry Hills NSW 2000
Ph: +61 2 9698 5414
ANNUAL REPORT 2024
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director
PAGE 1 OF 98
ANNUAL REPORT 2024
Chairman’s Letter
Dear Fellow Shareholder
I am pleased to present Boss Energy’s 2024 Annual Report.
It was a pivotal year for Boss as we started production at our Honeymoon uranium project in South Australia.
This marked the culmination of an incredible nine-year journey and reflected the huge amount of hard work,
determination and skill from our exceptional staff and contractors. On behalf of the Board, I thank you all for
the role you played in helping Boss to achieve this remarkable feat.
At the time of writing, we were in the throes of ramping up production at Honeymoon, having established during
the commissioning phase that our technology works as planned in the project Feasibility Study. This includes
demonstrating conclusively that our lixiviant chemistry used in the wellfields and ion exchange technology in
the processing plant works at a commercial scale. As a result, Boss now holds the title of being the only pureplay Australian uranium producer on the ASX.
It was a remarkable achievement to be one of the first uranium mines globally to come back online in this new
price cycle. I am particularly proud of the team for adopting the self-perform construction strategy at
Honeymoon which has enabled the team to solve the production issues encountered by the previous owner.
Through engagement with global experts and domestic agencies, Boss was able to successfully adopt the ion
exchange processing method which accounts for around 60 per cent of global production. The self-perform
model has also enabled Boss to retain the expertise ‘in-house’ and allowed Boss to commence production in
April from the first ion exchange column and first wellfield while continuing to build columns two to six and
develop new wellfields.
While it took Boss nine years to bring Honeymoon back into production, the deposit was actually discovered
over half a century ago, in 1972. The time taken to successfully produce uranium at commercial scale at
Honeymoon reflects the difficulty of bringing new uranium mines into production. We know that the world needs
more uranium to meet its net-zero goals but we believe that new mines will not come on stream as quickly as
many expect.
We think that this will have a positive impact on the uranium price and Boss is well positioned to benefit as a
result. Our strategy remains firmly on track and at the time of writing, Honeymoon was continuing to ramp up
production with column two close to being commissioned and construction of column three also progressing
to schedule. Boss’ position is strengthened by its robust balance sheet which further derisks the ramp up
period. Boss has cash and liquid assets of $274.1 million and no debt.
In December 2023, we were delighted to announce our collaborative partnership with US-based enCore
Energy Corp. This saw us acquire a 30 per cent interest in enCore’s Alta Mesa In-Situ Recovery (ISR) Uranium
Project in South Texas. Alta Mesa has a total operating capacity of 1.5 million pounds (lbs) U3O8 per year and
commenced production in June 2024. The companies have also agreed to a strategic collaboration to jointly
research and develop enCore’s proprietary Prompt Fission Neutron (PFN) technology for uranium exploration
and production.
While many of the achievements of our team over FY24 are covered in detail later in this report, I would like
to briefly recount some of them here:
•
The successful ongoing commissioning of Honeymoon which produced 57,364 pounds of uranium
and is on track to produce at least 850,000 lbs in FY25.
•
Becoming the first ASX-listed multi-mine uranium producer, with Boss’ 30 per cent owned Alta Mesa
joint venture in South Texas also commencing production.
•
Maintaining a safe working environment for our team members, which was demonstrated by
recording a TRIFR of 2.2 which is below mining industry averages.
ANNUAL REPORT 2024
PAGE 2 OF 98
ANNUAL REPORT 2024
•
The Company’s inclusion in the benchmark S&P ASX-200 Index, reflecting the substantial increase
in its market capitalisation, trading volumes and the diversity of our share register. It was only last
year that the Company was included in the benchmark S&P ASX-300 Index.
In closing, I would like to acknowledge everyone who has contributed to our ultimate goal, including my fellow
Board members, Managing Director and CEO, Duncan Craib and senior management team, team members,
consultants and advisers and, most importantly, our shareholders for their ardent support. The Federal
Government and the South Australian Government continue to provide their support for the Honeymoon
Project, for which we are grateful.
I would also like to acknowledge and pay our respects to the Traditional Owner groups, the Ngadjuri,
Adnyamathanha & Wilyakali, on whose land our operations in Australia are situated. Without their support,
consent and agreement, we would not have been able to bring Honeymoon back into production.
Yours sincerely,
Wyatt Buck
Chairman
ANNUAL REPORT 2024
PAGE 3 OF 98
ANNUAL REPORT 2024
Review of Operations
Boss has become a global multi-mine uranium producer, with the Honeymoon and Alta Mesa Projects now in
production. A review of each project is set out below.
Honeymoon Uranium Project (100 per cent ownership)
Boss brought the Honeymoon Uranium Project (Honeymoon) into production in April 2024 which marked the
culmination of 9 years of work by Boss team members, contractors and consultants. It was over half a century
ago that the Honeymoon deposit was first discovered and over a decade ago since the previous owner put the
site on care and maintenance.
Whilst Boss started the year with a solid foundation, having already completed many of the improvements that
were required to bring Honeymoon into production, further technical work remained to be completed in FY24
before the plant could be switched on. The key project milestones completed in FY24 were:
•
Pre-conditioning of the wellfields to remove unwanted chlorides and calcium prior to uranium being
extracted. This was achieved through the successful construction of the supporting wellfield
infrastructure, gypsum repository pond, water treatment and reverse osmosis plant.
•
Filling the pregnant leach solution processing ponds with production-tenor uranium which proved
that the lixiviant being used could effectively leach uranium from the wellfields.
•
Construction of the first of six NIMCIX columns which showed that uranium was successfully loading
onto, and being stripped off, the resin beads.
•
Completion of the drying and packaging area which included bringing a new horizontal electrical kiln
(calciner) online, which is one of the first in Australia.
•
Successful commissioning, with Boss proving its lixiviant chemistry and ion exchange technology at
commercial scale.
•
Continued construction of NIMCIX columns two and three on site and columns four to six already
fabricated and ready to be shipped to Honeymoon.
Development Milestones
The Honeymoon restart project saw its peak construction activities occur in FY24. This included a site
workforce of over 130 people, consisting of operations staff, construction staff and contractors all assisting in
the construction, commissioning and ramp up of the project.
Key milestones and accomplishments over the period are:
•
Construction completion, commissioning and operation of the water treatment plant, RO plant and
first wellfield. The primary focus of this area is to pre-flush the wellfields prior to the extraction of
uranium. Removal of chlorides and calcium is important for efficient ion exchange operation.
•
Upgrade and Commissioning of all reagent infrastructure required for not only wellfield flushing, but
for operation of ISR lixiviants, ion exchange chemistry and precipitation.
•
Completion of the first ion exchange circuit and the supporting system for operation. This included
the largest concrete pour (over 450 cubic meters) in the region for 15 years. Over 150 tonnes of
steel was erected and tanks assembled with piping, electrical and instrumentation completed.
•
Precipitation circuits and thickening area were refurbished and modified to suit both batch and
continuous precipitation.
•
Complete overhaul and successful commissioning of the drying and packaging plant replacing the
existing dryers with high temperature kilns and replacing the filter press with dual stage centrifuges.
ANNUAL REPORT 2024
PAGE 4 OF 98
ANNUAL REPORT 2024
•
Overland piping and pump systems complete and operating to wellfields, raw water and liquid
disposal.
•
Upgraded control systems which were installed and programmed to suit a plant and mine to operate
with increased autonomy.
•
Full commissioning and operation of the complete process plant from wellfield to drum achieved in
April 2024. This effort proves the design lixiviant chemistry below ground, the customised resin
loading and stripping dynamics, as well as our precipitation process and chemistry. Ramp up of the
electric kiln was successful, further reducing the need for fossil fuels in our uranium production.
•
Construction continues with column two close to being commissioned and construction of column
three also progressing to schedule.
Alta Mesa Project (30 per cent ownership)
On 27 February, Boss announced that it had completed the acquisition, from enCore Energy Corp (TSX.V:EU;
NYSE:EU) (enCore), of a 30 per cent stake in the Alta Mesa ISR Project (the Alta Mesa Project) in South
Texas for US$60 million cash.
The Alta Mesa Project is a high-grade uranium ISR project in South Texas, a prolific US district for sandstonehosted ISR production, having produced ~80Mlb historically.1 South Texas is the most progressive permitting
production jurisdiction in the United States.
enCore is a highly credentialed US uranium developer and operator, having recently commissioned the Rosita
ISR re-start project in the United States within 20 months from when it began. The enCore team previously
ran the Alta Mesa Project before it was placed on care and maintenance post-Fukushima. enCore is the initial
manager, and the acquisition established a strategic relationship between Boss and enCore which includes:
•
Boss receiving an exclusive Australian licence for, and collaborating on the development of,
enCore’s Prompt Fission Neutron (PFN) exploration and production tool technology.
•
Boss subscribing for US$10m of equity in enCore at a price of US$3.90 per share.
•
Boss lending 200,000lbs of physical uranium on commercial terms to deliver into enCore’s sales
contracts (the Uranium Loan Agreement). The repayment of the physical uranium and any
outstanding interest is due on 26 February 2025 (or such later date the repayment date is extended,
or brought forward, to in accordance with the Uranium Loan Agreement). The physical uranium and
interest are repayable in either uranium or cash at the election of Boss.
•
Developing future opportunities to collaborate on joint acquisitions.
Uranium Market Analysis
The uranium term price has continued to rise steadily over the past financial year having increased, in the 12
months, from US$56/lb to US$79/lb.2 The uranium spot price has been more volatile, having reached over
US$100/lb in February 2024 and reducing to US$78/lb at the time of writing. During the last financial year, the
majority of spot demand has been discretionary with intermediaries and funds, rather than utilities, accounting
for most spot market transactions. The volatility in the spot market reflects its illiquid nature, with a few hundred
thousand pounds enough to materially impact the spot price.
The steady increase in the uranium term price is reflective of increasing demand for uranium in the near,
medium and long term. This demand has been driven by lifetime extensions, plans to restart shutdown
reactors and the drive to meet net zero targets. We are also seeing exceptional near-term growth in electricity
demand from data centres which is accelerating the commercial development of small modular reactors.
1
enCore presentation November 2023 https://encoreuranium.com/wp-content/uploads/2023/11/EU-Corporate-Deck-FINAL-Nov-1723.pdf
2
From 31 July 2023 to 31 July 2024
ANNUAL REPORT 2024
PAGE 5 OF 98
ANNUAL REPORT 2024
The uranium market fundamentals are very strong. While demand is increasing, supply is struggling to keep
up with demand. Supply chain issues persist, costs of production are increasing, geopolitical tensions continue
and most of the new supply that has come online in the past year has been from expansions of existing mines
and restart projects, such as Honeymoon. New mines are needed during this decade. Planned projects will
need a strong and supportive investment environment, if they are to come on stream on time. For greenfield
projects the typical time from discovery to first production is in the order of 10 to 15 years with several technical,
economic and regulatory hurdles to be overcome during that period. Many of the deposits that are in the
development pipeline were discovered in the 1950s and 60s and it will take substantial investment in
exploration to discover the high-quality uranium deposits that are needed to meet future demand.
There is a strong interest from utilities in supply of uranium from politically stable countries. Boss, as a new
producer, located in South Australia, is ideally positioned to benefit from the high level of contracting that is
necessary to meet unfilled utility demand in the coming years.
Exploration and evaluation activities
The Company’s exploration strategy remains consistent with prior years, which has been to increase
Honeymoon’s production rate and mine life. The key activities to support this strategy are to:
•
Conduct the necessary activities at Jason’s Dam and Gould’s Dam Deposits to enable feasibility
studies and the application of a mining license for these deposits.
•
Conduct greenfields exploration on ground proximal to the Honeymoon plant whereby uranium
could be economically trucked or trunked back to the Honeymoon plant.
At Jason’s Dam and Gould’s Dam, Boss continued a delineation program to provide data which will be used
in wellfield planning and other advanced pre-development activities. It will also enable Boss to complete
detailed geological and mineralisation models which will support the ongoing development work and
preparation for an ISR Mining Lease proposal.
Boss was also awarded two new greenfields exploration projects by the Government of South Australia:
•
Kinloch Project: Includes four highly prospective exploration tenements in eastern South Australia
under a minerals rights sharing arrangement between Boss and copper developer Coda Minerals
(ASX: COD). The geological setting of this area is broadly analogous to the Lake Eyre Basin to the
north, where Boss is actively exploring and exploiting palaeovalley-hosted uranium deposits
including Honeymoon, Jasons and Goulds Dam.
•
Eyre Peninsula: Includes three highly prospective exploration tenements on the Eyre Peninsula in
South Australia. All three tenements cover portions of the Yanninnee Palaeovalley system which
extends across the central and northwestern portions of the Eyre Peninsula and are considered
prospective for palaeochannel and Proterozoic unconformity style uranium mineralisation.
Combined with the Honeymoon and Kinloch tenements, Boss now has a total uranium exploration tenement
package of over 6,000 km2 in South Australia, where Boss can utilise its expertise in this deposit style and
leverage the infrastructure of Honeymoon.
ANNUAL REPORT 2024
PAGE 6 OF 98
ANNUAL REPORT 2024
Strategic holding of Uranium Inventory
Boss continues to hold a strategic 1.25Mlbs of uranium stockpile and has produced 57,364lbs of inventory
which together are valued at $171.3 million.3 The strategic uranium holding provides several significant
benefits for Boss, including:
•
Enhanced financial position to support the restart of Honeymoon.
•
Increased flexibility in project funding and offtake negotiations with customers.
•
De-risking Honeymoon restart during commissioning phase.
•
Remaining fully leveraged to any future appreciation of uranium price on the back of tight supplydemand fundamentals.
Earn-in Agreement with Global miner to fund Base and Precious Metals Exploration
Boss entered into an exploration earn-in agreement, in February 2022, with First Quantum Minerals Ltd
(TSX:FM) (FQM) in respect to base and precious metal rights over five tenements within the Honeymoon
Project.
The agreement provides FQM with the right to earn a 51 per cent interest in any base or precious metal
discovery at Honeymoon by spending $6 million on exploration and a further 24 per cent interest by solefunding expenditure up until a Decision to Mine.
In May 2024 this year, Boss announced that FQM’s maiden copper exploration program had intersected
basement-hosted base metal mineralisation below the Yarramba Palaeovalley which holds the uranium. In
light of these results, FQM committed to proceeding with Phase 2 of the farm-in program.
The agreement enables Boss to remain fully focussed on its core business of uranium exploration,
development and production while having exposure at no cost to the significant potential associated with a
base and precious metals exploration program led by a global major.
Key Appointments
Boss has continued to strengthen its senior management team during the year to ensure that the team remains
stage-appropriate to reflect the increased complexity of the business associated with becoming a multi-mine
producer in two tier one jurisdictions.
The workforce on site has continued to grow with 101 team members in total, including senior management.
The corporate office has also increased, to 18 team members as Boss invests in its financial and governance
capabilities to support Boss becoming a multi mine uranium producer in two tier 1 jurisdictions.
Outlook
As of the date of this report, Boss remains on track to ramp up production in line with feasibility study estimates.
With liquid assets of $274.1 million4 and no debt obligations, Boss is well-positioned to support the ramp up.
Ongoing tightness in the uranium market augurs well for the term price over coming years. Consistent with
this, Boss continues to receive requests for proposals (RFPs) in respect to offtake and long-term contracts
generally.
3
As at 30 June 2024, the uranium inventory has been classified as an Investment in uranium ($109.7 million, which reflects inventory
held for long term purposes), Inventory ($30.3 million, which reflects inventory earmarked for delivery to a customer in Q1 FY25 and
unsold inventory produced) and Trade and other receivables ($31.3 million, which reflects the Uranium Loan Agreement with enCore).
4
As at 30 June 2024, comprised of uranium inventory valued at $171.3 million, cash on hand of $67.1 million and listed investments of
$35.7 million (mainly reflecting the Company’s investment in enCore).
ANNUAL REPORT 2024
PAGE 7 OF 98
ANNUAL REPORT 2024
Other Developments
On 6 December 2023, S&P Dow Jones Indices announced the inclusion of Boss in the S&P/ASX 200.
Reference to Previous ASX announcements
In relation to the results of the Enhanced Feasibility Study announced on 21 June 2021, the Company confirms
that all material assumptions underpinning the production target and forecast financial information included in
that announcement continue to apply and have not materially changed.
The mineral resource estimates in this report were reported by the Company in accordance with ASX listing
rule 5.8 on 25 February 2019. The Company confirms it is not aware of any new information or data that
materially affects the information included in the previous announcement and that all material assumptions
and technical parameters underpinning the estimates in the previous announcement continue to apply and
have not materially changed.
Forward-Looking Statements
This report includes forward-looking statements. These forward-looking statements are based on the
Company’s expectations and beliefs concerning future events. Forward-looking statements are necessarily
subject to risks, uncertainties and other factors, many of which are outside the control of Boss, which could
cause actual results to differ materially from such statements. Boss makes no undertaking to subsequently
update or revise the forward-looking statements made in this announcement, to reflect the circumstances or
events after the date of this announcement.
ANNUAL REPORT 2024
PAGE 8 OF 98
ANNUAL REPORT 2024
Mineral Resource Statement
The following information is provided in accordance with Listing Rule 5.21.
Mineral Resource Estimation Governance Statement
Boss ensures that the Mineral Resource estimates are subject to appropriate levels of governance and internal
controls. The Mineral Resources have been generated by employees and consultants of the Company who
are experienced in best practices in modelling and estimation methods and have undertaken reviews of the
quality and suitability of the underlying information used to generate the resource estimations. The Mineral
Resource estimates follow standard industry methodology using geological interpretation, calibrated Prompt
Fission Neutron (PFN), gamma-derived eU3O8 and geochemical assay results acquired through drilling.
Boss reports its Mineral Resources in accordance with the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves” (the JORC Code) (2012 Edition). Competent Persons named
by the Company qualify as Competent Persons as defined in the JORC Code. There has been no movement
in the Mineral Resource between 2023 and 2024 and as such the table below sets out Mineral Resources for
both 2023 and 2024 for the Honeymoon Uranium Project in South Australia.
Honeymoon Project Mineral Resource at 30 June 2024 and 30 June 2023
Lower cut-off of 250 ppm U3O8
Resource
Classification
Tonnage
(Million Tonnes)
Average Grade
(ppm U3O8)
Contained Metal
(Kt, U3O8)
Contained Metal
(Mlb, U3O8)
4.9
10.7
Jason’s (March 2017)
Inferred
6.2
790
Gould’s Dam (April 2016)
Indicated
4.4
650
2.9
6.3
Inferred
17.7
480
8.5
18.7
Honeymoon Re-Start Area (January 2019)
Measured
3.1
1,100
3.4
7.6
Indicated
14.0
610
8.7
19
Inferred
7.0
590
4.1
9.1
TOTAL HONEYMOON URANIUM PROJECT
Measured
3.1
1,100
3.4
7.6
Indicated
18.4
630
12.0
25.5
Inferred
30.9
570
18.0
38.5
Tot