Boss Energy AGM Presentation
Released
Released
Announcement PDF
A global multi-mine Uranium producer
Positioned to benefit from a rising Uranium market
Annual General Meeting 2024
20 November 2024
ASX: BOE | OTCQX: BQSSF
bossenergy.com
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
REFERENCE TO PREVIOUS ASX ANNOUNCEMENTS
This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (“Boss Energy” or “Company”).
The mineral resource estimate and exploration target in this announcement were reported by the Company in accordance with
listing rules 5.8 and 5.7(respectively)on 25 February 2019 and 25 March 2019, respectively. The Company confirms it is not aware
of any new information or data that materially affects the information included in the previous announcement and that all material
assumptions and technical parameters underpinning the estimates in the previous announcement continue to apply and have not
materially changed.
NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the Corporations Act 2001
(Cth) and has not been lodged with the Australian Securities and Investment Commission. This Presentation does not constitute investment advice and
has been prepared by Boss Energy without taking into account the recipient’s investment objectives, financial circumstances or particular needs. Each
recipient must make his/her own independent assessment and investigation of Boss Energy and its business and assets when deciding if an investment
is appropriate and should not rely on any statement or the adequacy and accuracy of any information. This Presentation is in summary form and does
not purpose to be exhaustive. This Presentation should be read in conjunction with Boss Energy’s periodic and continuous disclosure announcements
lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au. Boss Energy makes no representation or warranty
(either expressed or implied) as to the accuracy, reliability or completeness of the Information. Boss Energy and its directors, employees, agents and
consultants shall have no liability (including liability to any person by reason of negligence or negligent misstatement) for any statements, opinions,
information or matters (express or implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability
under statute that can not be excluded.
In relation to the exploration target, this does not include areas of the existing mineral resource and the potential quantity and
grade reported are conceptual only in nature. Insufficient exploration has been conducted to estimate a mineral resource and it is
uncertain whether future exploration will lead to the estimation of a mineral resource in the defined areas.
EFFECT OF ROUNDING
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
FORWARD LOOKING STATEMENTS
PAST PERFORMANCE
All dollar amounts are in Australian dollars unless otherwise indicated. This announcement may contain certain statements and projections provided by
or on behalf of Boss Energy Limited with respect to the anticipated future undertakings. These forward-looking statements reflect various assumptions
by or on behalf of Boss Energy. Accordingly, these statements are subject to significant business, economic and competitive uncertainties and
contingencies associated with the mining industry which may be beyond the control of Boss Energy which could cause actual results or trends to differ
materially, including but not limited to price and currency fluctuations, geotechnical factors, drilling and production results, development progress,
operating results, reserve estimates, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries,
approvals and cost estimates, environmental risks, ability to meet funding requirements, share price volatility. Accordingly, there can be no assurance
that such statements and projections will be realised. Boss Energy makes no representations as to the accuracy or completeness of any such statement of
projections or that any forecasts will be achieved. Additionally, Boss Energy makes no representation or warranty, express or implied, in relation to, and
no responsibility or liability (whether for negligence, under statute or otherwise) is or will be accepted by Boss Energy or by any of their respective
officers, directors, shareholders, partners, employees, or advisers as to or in relation to the accuracy or completeness of the information, statements,
opinions or matters (express or implied) arising out of, contained in or derived from this announcement or any omission from this announcement or of
any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In furnishing this announcement,
Boss Energy undertakes no obligation to provide any additional or updated information whether as a result of new information, future events or results
or otherwise. Nothing in this material should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities. It does not include
all available information and should not be used in isolation as a basis to invest in Boss Energy.
Past performance information, including past share price performance of Boss Energy and pro forma financial information, given in
this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss Energy’s
(or anyone else’s) views on Boss Energy’s future financial performance or condition. Past performance of Boss Energy cannot be
relied upon as an indicator of (and provides no guidance as to) the future performance of Boss Energy. Nothing contained in this
Presentation nor any information made available to you is, or shall be relied upon as a promise, representation, warranty or
guarantee, whether as to the past, present or future.
The information in this document relating to the Enhanced Feasibility Study(“EFS”) is extracted from the announcement entitled ‘Updated Feasibility
Study identifies lower costs and increased financial returns’ dated 21 June 2021. Boss Energy confirms that all the material assumptions underpinning the
production targets, and forecast financial information derived from the production targets, continue to apply and have not materially changed.
As the EFS utilises a portion of Inferred Mineral Resources, the ASX Listing Rules require a cautionary statement to be included in this presentation. The
EFS is based on a Mineral Resources Estimate in accordance with JORC guidelines 2012 (ASX:149% Increase in Measured and Indicated Resources at
Honeymoon dated 25 February 2019).
The Company advises that the EFS uses a portion of Inferred Resources in the first 3 years (less than 1%), in the first 5 years(5%) and over the 11-year life
of mine(19%). The Company confirms that the use of Inferred Resources is not a determining factor to the Honeymoon Project’s economic viability.
There is a low level of geological confidence associated with Inferred Resources and there is no certainty that further exploration or evaluation work will
result in the determination of Indicated Resources or that the production targets reported in this announcement will be realised.
Boss Energy | A global multi-mine Uranium producer
JORC CODE
It is a requirement of the Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the Joint
Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves ("JORC Code"). Investors
outside Australia should note that while ore reserve and mineral resource estimates of the Company in this Presentation comply
with the JORC Code (such JORC Code-compliant ore reserves and mineral resources being "Ore Reserves" and "Mineral
Resources" respectively), they may not comply with the relevant guidelines in other countries and, in particular, do not comply
with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the
"Canadian NI 43-101 Standards"); or (ii) Item 1300 of Regulation S-K, which governs disclosures of mineral reserves in
registration statements filed with the SEC. Information contained in this document describing mineral deposits may not be
comparable to similar information made public by companies subject to the reporting and disclosure requirements of Canadian or
US securities laws.
FOREIGN RESOURCE ESTIMATE
Please refer to Boss Energy's announcement to the ASX market announcements platform dated 6 December 2023 for additional
technical information relating to the foreign resource estimate for the Alta Mesa Project. Boss Energy confirms it is not in possession of
any new information or data relating to the foreign resource estimate that materially impacts on the reliability of the estimate or
Boss Energy's ability to verify the foreign estimate as a mineral resource in accordance with the JORC Code. Boss Energy
confirms that the supporting information provided in Boss Energy's announcement to the ASX market announcements platform
on 6 December 2023 continues to apply and has not materially changed.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy.
2
Honeymoon and Alta Mesa Resource Tables
HONEYMOON JORC EXPLORATION TARGETS
AND MINERAL RESOURCE
The information in this Presentation relating to the Enhanced Feasibility Study (EFS) is extracted from
the announcement entitled ‘Updated Feasibility Study identifies lower costs and increased financial
returns’ dated 21st June 2021. Boss Energy confirms that all the material assumptions underpinning
the production targets, and forecast financial information derived from the production targets,
continue to apply and have not materially changed. As the EFS utilises a portion of Inferred Mineral
Resources, the ASX Listing Rules (Listing Rules) require a cautionary statement to be included in this
Presentation. The EFS is based on a Mineral Resources Estimate in accordance with the JORC 2012
guidelines (ASX: 149% Increase in Measured and Indicated Resources at Honeymoon date 25 February
2019). The Company advises that the EFS uses a portion of Inferred Resources; in the first 3 years (less
than 1%), in the first 5 years (5%) and over the 11-year life of mine (19%). The Company confirms that
the use of Inferred Resources is not a determining factor to the Honeymoon Project’s economic
viability. There is a low level of geological confidence associated with Inferred Resources and there is
no certainty that further exploration or evaluation work will result in the determination of Indicated
Resources or that the production targets reported in this announcement will be realised.
The mineral resource estimate and exploration target in this Presentation were reported by the
Company in accordance with Listing Rules 5.8 and 5.7 (respectively) on 25 February 2019 and 25
March 2019, respectively. The Company confirms it is not aware of any new information or data that
materially affects the information included in the previous announcement and that all material
assumptions and technical parameters underpinning the estimates in the previous announcement
continue to apply and have not materially changed. In relation to the exploration target, this does
not include areas of the existing mineral resource and the potential quantity and grade reported are
conceptual only in nature. Insufficient exploration has been conducted to estimate a mineral resource
and it is uncertain whether future exploration will lead to the estimation of a mineral resource in the
defined areas.
Tonnes (Mt)
Grade (%U3O8)
Contained U3O8
(Mlbs)
Measured
3.1
0.110
7.6
Indicated
18.4
0.063
25.5
Inferred
30.9
0.057
38.5
Total
52.4
0.062
71.6
Boss Energy | A global multi-mine Uranium producer
ALTA MESA NI 43-101 MINERAL RESOURCE ESTIMATE (2023)
For the purposes of Listing Rule 5.12, Boss Energy cautions that the mineral resources for the Alta Mesa Project are
not reported in accordance with the JORC Code. The mineral resource estimate at Alta Mesa is a foreign estimate
prepared in accordance with Canadian National Instrument 43-101. A competent person has not done sufficient work
to classify the foreign estimate as a mineral resource in accordance with the JORC Code, and it is uncertain whether
further evaluation and exploration will result in an estimate reportable under the JORC Code.
Foreign Resource Estimate
Please refer to Boss Energy's announcement to the ASX market announcements platform dated 6 December
2023 for additional technical information relating to the foreign resource estimate for the Alta Mesa Project. Boss
Energy confirms it is not in possession of any new information or data relating to the foreign resource estimate that
materially impacts on the reliability of the estimate or Boss Energy's ability to verify the foreign estimate as a
mineral resource in accordance with the JORC Code. Boss Energy confirms that the supporting information
provided in Boss Energy's announcement to the ASX market announcements platform on 6 December 2023
continues to apply and has not materially changed.
The information in this Presentation that relates to the foreign estimate for the Alta Mesa Project is based on
information compiled by Mr Jason Cherry, and is an accurate representation of the available data and studies for the
Alta Mesa Project.
Mr Cherry is a member of the Australian Institute of Geoscientists (AIG) and has sufficient experience that is relevant
to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify
as a Competent Person, as defined in the JORC 2012 edition of the “Australasian Code for Reporting of Mineral
Resources and Ore Reserves”. Mr Cherry has 17 years’ experience and is a full-time employee as Geology Manager
for Boss Energy Ltd. Mr Cherry consents to the inclusion in this Presentation of the matters based on this
information in the form and context in which they appear.
Within existing wellfields
Alta Mesa
Mesteña Grande
Total Measured &
Indicated Mineral
Resources
Alta Mesa
Mesteña Grande
Total Inferred Mineral
Resource
Notes:
1 Reported on a 100% basis
Resource
Category
Tonnes (‘000)
Grade (%U3O8)
Contained U3O8
(‘000 lbs)
Measured
Indicated
Indicated
54
1,397
119
0.152
0.106
0.120
164
2,959
287
1,570
0.109
3,410
1,263
5,733
0.126
0.119
3,192
13,601
6,996
0.120
16,793¹
Inferred
Inferred
3
It’s all about timing.
Strategic Horizons
Vision & Strategy
• Be Australia’s Next Uranium
Producer
• 10 year mine life +
• 2.5Mlb U308 per annum
production
• 100Mlb exploration target
• Superior Total Shareholder
Return, campaign style, fiscal
discipline
• Solid relationships with key
stakeholders, government,
industry, investors, employees,
traditional owners
Boss has delivered two producing mines and has
a market capital growth of $1.3B and zero debt
Foundation & Development
• Proven Board & Management
• Skilled, committed, stable wellfield,
processing and exploration geology
team
• Proven chemistry - Successful
feasibility studies and Field Leach
Trials
• Strategic inventory of 1.25Mlb
U308 for working capital,
competitive market terms
• Self performing Project and
Construction team, engineering,
procurement, construction and
management
Boss Energy | A global multi-mine Uranium producer
Organic Growth
Mergers & Acquisitions
• Full pipeline of near-mine and
regional exploration targets in
South Australia
• Discipline First – value
accretive M&A with Alta Mesa
• Honeymoon 72Mlbs U308 JORC
Resource
• Tier 1 jurisdiction focus,
Australia, North America and
Canada
• Producing and receiving cash
from sales
• Focus on economic resources
which can produce
• Highly successful exploration
strategy, increasing JORC
Resource from 16.57Mlbs to
71.67Mlbs (~4.3x)
• ASX 200 and strong
institutional support for Boss
Energy strategy
•
Over 6,000 km2 of prospective
tenements in South Australia
• Base Metal Joint Ventures
• Recognised global producer, a
partner of choice for
consolidation
• BOSS IS OPEN FOR BUSINESS
4
A disciplined approach to raising capital.
Shareholder returns
Sep 16:
Scoping study
complete
Jan 20:
Feasibility
study
Nov 17: Field
Leach Trial
Completed early studies
and proved the chemistry
Dec 15:
Acquisition of
Honeymoon
Upgraded the resource and
completed further studies
May 17: PreFeasibility
complete
Annual Return (%)
Feb 19: Mineral
Resource Upgrade
Share price
TSR
Boss
40.0
40.0
ASX 300 M&M
10.7
16.2
Out of $443 million raised, $245 million remains
in cash and liquid assets1
Jun 21:
Enhanced
Feasibility study
Jun 22: Final
Investment
Decision
Raised capital, secured
inventory and finalise study
Mar 21: $60M
Capital Raising
Mar 22: $125M
Capital Raising
Jan 24:
Acquires
30% Alta
Mesa
Oct 24: Two columns
commissioned at
Honeymoon
Expand internationally and
commence production
Jul 24: Alta Mesa
restarts
production
Notes:
1.
As at 30 September 2024
2.
Chart shows share price performance indexed to 1 on 1 September 2015
Source: Bloomberg
Boss Energy | A global multi-mine Uranium producer
5
Building mines takes time….
Honeymoon took half a century from discovery to being a commercially viable mine…
Honeymoon Uranium Mine History
Boss Energy | A global multi-mine Uranium producer
6
An International multi-mine ISR producer in Two tier One locations
Global Uranium Platform in Tier 1 Locations
Honeymoon (100% ownership)
2.45Mlbs U308 p.a.
Alta Mesa (30% ownership)
2Mlbs U308 p.a.
Texas
First shipment completed
South Australia
Production and Sales
Uranium friendly state
On track for 850k lbs in FY25
1st sales and cashflow in Q3
CY24
Uranium friendly state
October 2024
IX process scaling
Ramp up per schedule
Proven management team
Exceptional drilling results
Two NIMCIX columns have
been commissioned with third
expected by December 2025
Ramp up to 2.45Mlb/annum
proceeding to plan
Some of the most experienced
ISR and IX operators in the USA
Significantly exceeds the cutoff
grade required for ISR
Boss Energy | A global multi-mine Uranium producer
Alta Mesa Project
7
Honeymoon Uranium mine site overview
RO and Water Treatment Plant
Boss Energy | Australia’s Next Clean Energy Producer
9
9
ISR is a proven cost-effective uranium extraction process with reduced
environmental impact relative to traditional mining
In-Situ Recovery (ISR) Mining
•
ISR accounts for ~ 60% global uranium mined, used
in Australia, Kazakhstan, USA
•
ESG friendly mining method - unlike conventional
mining, temporary ground disturbance, no ground
excavations, not tailings, minimal dust and less
water consumption
•
Barren leach liquor is injected through the uranium
hosted ore body, to recover high grade pregnant
liquor solution by production wells and pumped to
the surface.
•
Uranium is then extracted using ion exchange,
precipitated out and dried to produce U3O8.
•
~ 2/3 the cost of conventional mining and average
CAPEX less than 15% of conventional mines
Source: United States Nuclear Regulatory Commissions (www.nrc.gov) (1) World Nuclear
Association – World Mining Uranium Production (December 2020) (2) TradeTech – The
Nuclear Review (October 2016)
Boss Energy | A global multi-mine Uranium producer
Example Schematic (Source: Beverley Environmental Impact Statement (1998))
10
Boss Energy | Australia’s Next Clean Energy Producer
Wellfield Development
11
11
First two wellfields have been commissioned
Wellfield construction electrical, instrumentation, and piping materials on site and being
installed
Boss Energy | Australia’s Next Clean Energy Producer
12
12
Barren Leach Solution / Pregnant Leach Solution Ponds
13
Boss owned 400T crane removing redundant Solvent Extraction pulse columns
Boss Energy | Australia’s Next Clean Energy Producer
14
14
First NIMCIX elution column entering Honeymoon uranium mine site
Boss Energy | Australia’s Next Clean Energy Producer
15
15
Gypsum Pond Earthworks
Pouring Concrete for New IX columns
Wellfield construction electrical, instrumentation, and piping materials on site and being
installed
Boss Energy | Australia’s Next Clean Energy Producer
16
16
First two columns have been commissioned. Third column commissioned by December 2024
17
• Each NIMCIX column contributes 35-45,000 lbs U308 per month
• Annualised basis each columns contributes 420-540,000 lbs U308
• Finer details are set out in the published Feasibility Studies
Boss Energy | A global multi-mine Uranium producer
18
Honeymoon continues to ramp-up in line with EFS forecasts
Production ramp-up
•
On track to produce 850k U3O8 in FY25
•
Column two is commissioned and column three expected by December 2024
•
Parallel construction and production enables earlier production shipments and sales
•
Cost guidance to be provided once columns two and three are operating
Honeymoon U3O8 Production ramp up (lbs)
First shipment
760,484
Guidance
3 Columns
28,844
Actuals
1 Column
4Q24
Boss Energy | A global multi-mine Uranium producer
89,516
1Q25
2Q25-4Q25
19
Mining Licence of 36Mlb with a further defined 36Mlbs to be licenced
Substantial Exploration Target of 58Mlbs to 190Mlbs at grades up to 1,080ppm U3O81
Honeymoon Exploration Potential
• In addition to the JORC Resource of 71.6Mlb, Honeymoon has a
substantial Exploration Target1 of 58Mlbs to 190Mlbs at grades up to
1,080ppm U308
• Following strong infill drilling results Boss is undertaking technical
and economic studies on developing the satellite deposits as an
additional production source, ~36Mlb U308 indicated and inferred
resource
• Boss awarded Kinloch Project exploration tenements ~130km south
of Honeymoon. Also recently awarded three highly prospective
exploration tenements on the Eyre Peninsula in South Australia
• Boss now has a total uranium exploration tenement package of over
6,000 km2 in South Australia
• Joint Venture with First Quantum TSX: FM for earn-in arrangement
for discovery of copper
• Boss’ exploration strategy has already been highly successful,
increasing the JORC Resource at Honeymoon from 16.57Mlbs to
71.67Mlbs (~4.3x) since project acquisition in December 2015
Notes:
1.
Refer ASX announcement 25 March 2019. The potential quantity and grade of the Exploration Target is conceptual in nature. There has been
insufficient exploration to estimate a Mineral Resource and it is uncertain whether future exploration will result in the definition of a Mineral
Resource. Please refer to the cautionary statement and accompanying resource table in Slide 4 for further information.
Boss Energy | A global multi-mine Uranium producer
20
High grade ISR project in a Tier 1 jurisdiction with significant potential for growth
Alta Mesa ISR Uranium project
•
Located in South Texas – a prolific US district for sandstonehosted ISR production with historic production of ~80Mlb1
•
Most progressive permitting production jurisdiction in the US
•
Historically has produced the third largest amount of uranium
out of all ISR assets in the US, producing 4.6Mlb between 2005
and 2013 through ISR mining with an alkaline lixiviant1
•
Existing 20Mlb total high-grade resource of 1,200 ppm2
•
1.5Mlb plant capacity with a simple path to expand capacity
using existing licences and drying capacity of 2Mlb
ALTA MESA HISTORICAL PRODUCTION REFERENCE POINTS
Alta Mesa Processing Facility
ALTA MESA NI 43-101 MINERAL RESOURCE ESTIMATE (2023)
Production reference points3
Average production between 2005 and 2013
0.58Mlb
Maximum yearly production between 2005 and 2013
1.07Mlb
Licenced processing capacity
1.5Mlb
Notes:
1.
enCore Energy November 2023 Corporate Presentation
2.
Please refer to the cautionary statement and accompanying resource table in Slide 4 for further information.
3.
Technical Report Summary for the Alta Mesa Uranium Project, Brooks and Jim Hogg Counties, Texas, USA National Instrument 43-101, Technical Report
2023, BRS Engineering, using mid-point
Boss Energy | A global multi-mine Uranium producer
Within existing
wellfields
Alta Mesa
Mestena Grande
Resource
Category
Tonnes
(‘000)
Grade
(%U3O8)
Contained
U3O8 (‘000
lbs)
Measured
54
0.152
164
Indicated
1,397
0.106
2,959
Indicated
119
0.120
287
1,570
0.109
3,410
Total M&I Mineral
Resources
Alta Mesa
Inferred
1,263
0.126
3,192
Mestena Grande
Inferred
5,733
0.119
13,601
6,996
0.120
16,793
Total Inferred
Mineral Resource
21
Partnership able to leverage the combined experience in development, commissioning and operating
mining projects globally
Leading Development and Operating Experience
BOSS ENERGY
Wyatt Buck (Chair)
• GM of McArthur River Uranium Mine
• GM Key Lake Mill, the largest uranium
mining operation in the world.
• Executive GM for all of First
Quantum’s global assets
Duncan Craib (CEO and MD)
• Finance Director for construction and
commissioning of Husab uranium mine
in Namibia.
• CFO for Kalahari Minerals plc and its
43% interest in Extract Resources Ltd.
• MCA Uranium Forum Chair since 2021
Jon Owen (Project Manager)
• First Quantum Project Manager for
Sentinel copper mine in Zambia
• Construction and commissioning of
Cobre Panama copper/gold
processing plant
Mine development
and / or operating
involvement by
respective teams
Boss Energy | A global multi-mine Uranium producer
Jan Honeyman (NED)
• First Quantum Director of Human
Resources (across all operations)
• KBR Energy, Global Director, Talent
Management
Sashi Davies (Sales and Strategic
Advisor)
• Vice Chair World Nuclear Fuel Market
• Previously General Manager of CGN
Global Uranium Ltd
• Previously Head of Marketing for Extract
Resources (Husab mine in Namibia)
Bryn Jones (NED)
• COO Laramide, (New Mexico and
Queensland assets uranium assets)
• Manager technical services Heathgate
Resources
• Worley-SNC Lavelin JV Uranium Lead for
the Olympic Dam Expansion Project
ENCORE ENERGY
Bill Sheriff (Founder and Exec
Chair) –
• Founder and Chair of Energy
Metals Corp
• Responsible for compiling
largest domestic uranium
resource base in US history
prior to acquisition by Uranium
One Corp
Dennis Stover (Director &
Chief Technical Officer)
• Leading expert in ISR
recovery focussed on US
production
• Independent ISR consultant
for Honeymoon
• Previous CEO enCore
• Executive Vice President,
Americas for Uranium One,
Inc overseeing development
of Uranium One’s assets in
the US
Paul Goranson (Director & CEO)
• COO of Energy Fuels - Alta
Mesa and Nichols Ranch
• President, COO and Director
Uranerz - Nichols Ranch ISR
Uranium Project
• President, Cameco Resources
• Vice President of Mesteña
Uranium LLC
• Previous President of the
Uranium Producers of America
Susan Hoxie-Key (Director)
• Chairwoman of the World
Nuclear Fuel Market
• Lead Nuclear Engineer
Southern Nuclear Operating
Company
Peter Luthiger (COO)
• Managed the Alta Mesa ISR
project during its period of
production
22
Contracting
activity &
strategy
Boss has entered into
binding sales agreement
to sell 3.5Mlbs U308 to
major European / US
power utilities over 8yrs
from 2024 to 2033
Exposure to price
increases supported by
~$245m in liquid assets
and no debt1
Strategic inventory plus
diversity of supply with
no jurisdiction risk
Uranium prices have never been this high at the start of a contracting cycle
Alta Mesa Central Processing Plant, Texas, USA
Flexibility
•
•
Strategically retain
exposure to spot
price and market
upside
Strong Balance Sheet
has provided Boss
flexibility to enter into
contracts when it
wants to
Honeymoon Processing Plant and Wellfields, South Australia
Strong Relationships
Significant upside
•
In constant
discussions with
major global utilities
•
First production timed
with strong market
fundamentals
•
Boss seen as strong
counterparty given
strategic inventory
and diversity of
supply with no
jurisdiction risk
•
Additional contracts will
be layered into a rising
market
•
Boss upside remains
significant as term
prices continue to rise
Notes
1.
As at 30 September 2024
Boss Energy | A global multi-mine Uranium producer
23
Uranium prices are trading at 16-year highs ~ Term US$83/ lb U308 and Spot ~ US$ 83/ lb U308 price (Source:
TradeTech, LLC (www.uranium.info)
4 Key Uranium Industry Considerations
01
Supply is
tight
Supply to 2030 is tight across the cycle, and if Russia cuts supply to the US in
response to US sanctions on Russian supply this would put immediate upward
pressure on price
02
Kazakh
supply
limited
Supply from Kazakhstan will be more limited to the west as Russia and China
take more supply from this area and until sulphuric acid shortages are resolved
03
Rising long
term price
Spot pricing reflects discretionary buying while the rising term price is an
indicator of increasing concern about the supply deficit
04
New
markets
for nuclear
Demand for reliable clean energy is creating new markets for nuclear generation
as a source of supply for data centres. Data centre electricity usage, according to
new IEA report, to increase from 460 terawatt-hours (TWh) worldwide in 2022 to
1,000 TWh in 2026. This is approximate to the electricity consumption of Japan
Boss Energy | A global multi-mine Uranium producer
24
Inclement Weather Event
25
Key Milestones Achieved ~ from 2015 until today
Milestone
Date
Acquisition of Honeymoon Uranium Mine - global resources of 16.6Mlb U3O8
Dec 2015
Scoping study confirms low capital requirements and operat