A global multi-mine Uranium producer
First mover advantage in a rising Uranium market
Macquarie Conference
7 May 2025
ASX: BOE | OTCQX: BQSSF
bossenergy.com
Boss has delivered on the Enhanced Feasibility Study and Guidance
Shareholder returns
Sep 16: Scoping
study complete
Nov 17:
Successful Field
Leach Trial
Complete early studies
and prove the chemistry
Dec 15:
Acquisition of
Honeymoon
May 17: PreFeasibility
complete
Jan 20:
Feasibility study
complete
Enhanced
Feasibility Mar 22: $125M
Study
Capital Raising
Upgrade the resource
and further studies
Feb 19: Mineral
Resource
Upgrade
Jan 24: Boss
acquires 30% of
Alta Mesa Mine
Raise capital, secure
inventory and finalise study
Mar 21: $60M
Capital Raising
Jun 22: Final
Investment Decision
Jul 24: Alta
Mesa restart
production
Jan 25: Declare
Honeymoon Commercial
production and provide
Guidance
Expand internationally and
commence production
Apr 24:
Honeymoon
restarts production
May 25: Honeymoon
on track to deliver
Guidance
Declare commercial production
and positive cash flow
April 25:
Honeymoon Free
Cash Flow positive
Total Shareholder Return (% p.a.)
Sep-15
Boss Energy
38.5
ASX 300 Metals & Mining
14.2
Sep-16
Sep-17
Sep-18
Notes:
(1) Chart shows share price performance to 5 May 2025, indexed from 1 September 2015
(2) TSR assumes dividends reinvested in the index (30 Aug 2015 – 5 May 2015)
Source: Bloomberg
Boss Energy | A global multi-mine Uranium producer
Sep-19
Boss
Sep-20
Sep-21
ASX 300 M&M
Sep-22
Sep-23
Sep-24
2
2
Boss remains well positioned in a volatile market
Resilient with first mover advantage
•
$229 million in cash and liquid assets.1
•
Honeymoon has become free cash flow positive in its first year of
ramp up.
•
Production: On track to meet production guidance of 850k lbs in FY25.
On track
•
Cost: On track to meet 2H25 C1 cost guidance of $A37-41/lb (US$2325/lb) - implying C1 margin of 68-71% based on Term Price.
Plant infrastructure
•
Investing in future wellfield infrastructure and NIMCIX columns 4-6 to
enable continued ramp up.
•
Progressing organic and inorganic growth opportunities whilst remaining
disciplined on capital allocation.
Strong Balance Sheet
Growth opportunities
Notes:
(1) As at 31 March 2025
Boss Energy | A global multi-mine Uranium producer
3
An International multi-mine ISR producer in Two tier One locations
Global Uranium Platform in Tier 1 Locations
Honeymoon (100% ownership)
Alta Mesa (30% ownership)
2.45Mlbs U308 p.a.
1.5Mlbs U308 p.a.
South Australia
Shipped and cash received
Texas
Drummed and delivered
Alta Mesa Project
Uranium friendly state
401K lbs U308 shipped
~US$53.5M cash received
Uranium friendly state
72K lbs U308 delivered
IX process proven
Ramp up per schedule
Proven management team
Exceptional drilling results
Key metrics already exceeding
Feasibility Study forecasts
Ramp up to 2.45Mlb/annum
proceeding to plan
Some of the most experienced ISR
and IX operators in the USA
Significantly exceeds the cutoff grade
required for ISR
Boss Energy | A global multi-mine Uranium producer
4
An International multi-mine ISR producer in Two tier One locations
With a pipeline of growth opportunities
Boss Energy - Australian exploration
19.7% Shareholder of Laramide Resources
South Australia
Northern Territory
Queensland & Northern Territory
United States & Kazakhstan
• Uranium friendly state
• Uranium friendly state
• Uranium friendly jurisdictions
• Completed infill drilling at for
the Gould’s Dam and Jasons
satellite deposits
• A stage-gated earn-in
agreement with the Eclipse
Group for the Liverpool
Uranium Project in the
highly prospective Alligator
Rivers Uranium Field
• Westmoreland Uranium
Project; one of Australia’s
largest and highest-quality
uranium development projects
~ MRE of 65.8M lbs U3081
• Murphy Project is comprised of
strategically located uranium
tenements over 683 km2 in the
Northern Territory
• La Sal Project, a conventional
hard-rock asset in Utah
• Consultants engaged to produce
a mineral resource update for
the Gould’s Dam and Jasons (Q3
FY2025)
• Continue to generate
exploration targets around the
Honeymoon operation that
could represent additional
undiscovered resources
• Churchrock-Crownpoint ISR
uranium project in New
Mexico
• La Jara Mesa ISR Project in
New Mexico
• Large greenfield uranium
exploration opportunity in
Kazakhstan featuring a 6,000
km2 land position in prolific
Chu-Sarysu Basin.
Note: (1) Refer to Laramide’s ASX Announcement “Laramide MRE Update for Westmoreland Uranium Project (amended)” released on 7 March 2025
Boss Energy | A global multi-mine Uranium producer
5
Honeymoon
Building mines takes time….
Honeymoon took half a century from discovery to being a commercially viable mine…
Honeymoon Uranium Mine History
Boss Energy | A global multi-mine Uranium producer
7
Boss remains on track to deliver production and cost guidance
Honeymoon Highlights
Further ramp up
and growth
initiatives underway
Key ramp up
milestones delivered
Strong Financial
Position
• Remain on track to deliver 850k
lbs of U3O8 drummed in FY2025
•
$229 million in cash and liquid assets,
including $64 million held in cash and
1.21M lbs inventory on hand1
•
Continued Honeymoon drilling and
ordering long lead items for
Wellfields
•
Honeymoon recorded its first quarter
of positive free cash flow2
•
Completion of NIMCIX columns 4-6
•
Progressing initiatives to further
derisk production ramp up
•
Updated independent mineral
resource estimates (MRE) for
Jasons and Goulds dam deposits
are anticipated for the next
quarter
• March quarter run rate of ~1.2m
lbs per year positions
Honeymoon to deliver on next
years target
• NIMCIX column 3 ramping up;
Columns 1 and 2 operating at
nameplate capacity
• Commercial production declared,
effective 1 January 2025
•
C1 cost from drummed uranium 2025
of A$33/lb (US$21/lb) 2 below 2H25
guidance of A$37-41/lb (US$23-25/lb)
Notes:
(1) As at 31 March 2025
(2) For the quarter ended 31 March 2025
Boss Energy | A global multi-mine Uranium producer
8
Strong production growth keeps Boss on track to meet guidance
Honeymoon Production Results
HONEYMOON QUARTERLY PRODUCTION
lbs
350,000
300,000
Metric
Unit
Guidance
Production
lbs
850,000
Cost
A$/lb
37-41
Cost
US$/lb
23-25
On track
March 2025 (3Q25) quarterly performance:
295,819 lbs U3O8 drummed (up 116% on Dec qtr)
246,869 lbs IX production (up 15% on Dec qtr)
On track
250,000
200,000
150,000
100,000
50,000
0
4Q24
Boss Energy | A global multi-mine Uranium producer
1Q25
IX Production
2Q25
U3O8 Drummed
3Q25
9
NIMCIX Columns:
#1 & 2 operating at nameplate
#3 commenced production March 2025
#4 being installed, to be commissioned September 2025
Columns #4,5 & 6 bases are in place
#5 & 6 being installed, to be commissioned December 2025
Boss Energy | A global multi-mine Uranium producer
10
Construction ahead
of schedule
Honeymoon Current Wellfield
Configuration
Wellfields
#B1 & 2 in production
Brooks Dam
Honeymoon
#B3 started production March 2025
#B4 scheduled for production 1QFY26
#B5 scheduled for production 2QFY26
#B6 scheduled for production 3QFY26
East Kalkaroo
Boss Energy | A global multi-mine Uranium producer
11
Exploration focussed on increasing production rate and mine life
Exploration
“These satellite deposits have the potential to drive growth as
well as enabling us to leverage existing infrastructure and
further capitalise on the opportunity presented by growing
global demand for uranium from tier-one locations”
Key activities for the quarter:
• Completed infill drilling at for the Gould’s Dam and Jasons
satellite deposit - a number of significant intersections, including
3.25m @ 3,873 pU308 (WRM176)
• Consultants engaged to produce a mineral resource update for
the Gould’s Dam and Jasons satellite deposits (Q4 FY2025)
• New exploration drilling on the Cummins Dam prospect has
defined a zone of mineralisation of approximately 1km x 1km,
which remains open
Key upcoming exploration activities:
• Further drilling on the Cummins Dam prospect in Q3 FY25
• Continue to generate exploration targets around the Honeymoon
operation, aimed at identifying high-priority targets that could
represent additional undiscovered resources
Boss Energy | A global multi-mine Uranium producer
12
Alta Mesa
Boss Energy | A global multi-mine Uranium producer
13
Alta Mesa continues to ramp up to nameplate capacity of 1.5 million pounds U3O8
Alta Mesa Highlights
Key ramp up
milestones delivered
•
Grand opening celebration of the
Alta Mesa Uranium Plant with
George W. Bush, the 43rd President
of the United States, 8th October
2024
•
Alta Mesa’s 1st IX circuit is operating
•
Uranium capture of 50,000 lbs U3O8
uranium realised between March 6
and March 31, 2025; (Boss’ share of
this production is 30 per cent)
•
March capture rate represents the
highest rate since the plant returned to
operations in June 2024, equivalent to
almost half of nameplate capacity.
at nameplate capacity, 2nd IX circuit
commenced production in March
2025, with the 3rd IX circuit planned
to be online in 2026
•
Wellfield solution head grades at
Alta Mesa peaked at approximately
140 mg/l U3O8 and averaged
approximately 65 mg/l U3O8
Boss Energy | A global multi-mine Uranium producer
Further ramp up
and growth
initiatives underway
Current production
update
•
Acceleration of enCore’s August 2025
contract delivery requirements to May
2025 due to the improved uranium
capture at the Alta Mesa
•
Alta Mesa is ramping up to an
annualised production rate of 1.5
million pounds U3O8 (of which
Boss is entitled to 30%, to sell as
its own inventory, unencumbered)
•
Alta Mesa Project, which consists
of over 200,000 acres plus the
central processing plant and
wellfields, is managed by
experienced uranium producer,
and partner, enCore
•
Progressing initiatives to further
derisk production ramp up
14
Market
Update
Boss Energy well positioned to benefit from rising Long-Term price
Market Update
Quarter ended
FY25
Unit
March
December
September
Sales
Lbs
150,000
200,000
200,000
Loan repayment
Lbs
118,000
-
-
Total Cash Received
US$
22,389
15,500
15,608
Realised price /lb
US$
83.5
77.5
78.0
AU$
180
160
140
Term price (which represents ~85% of volume
traded) is at an AUD all time high
120
•
Strong realised price reinforces contracting strategy.
•
Uranium exempt from US tariffs.
•
Utilities are re-entering the market following a period of
uncertainty caused by tariffs and sanctions.
•
•
•
Currently 65 reactors under construction - highest level
since 1990 (IEA)
New supply is disappointing as restarts stumble and new
development projects are rightly demanding higher
prices before they commence production.
This has all resulted in the Term Price reaching an all
time high in AUD terms of A$128/lb
100
80
60
40
20
0
2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024
U3O8 Spot Price
U3O8 Long-Term Price
Source: UxC, LLC https://www.uxc.com/
Boss Energy | A global multi-mine Uranium producer
16
Appendices
Appendix 1: Physicals Summary
Honeymoon
Unit
3Q FY25
2Q FY25
1Q FY25
IX Flow (total)1
m3
1,088,704
861,204
729,299
PLS to IX tenor
U3O8 mg/l
108
116
71
IX Recovery
%
95.5
97.8
97.2
IX Production (total)1
lbs
246,869
215,319
110,050
U3O8 Drummed (total)
lbs
295,815
137,084
89,516
Notes:
1. Conversions: There are 1,000 litres per m3 and 0.00000220462 lbs per mg.
Boss Energy | A global multi-mine Uranium producer
18
Honeymoon and Alta Mesa Resource Tables
HONEYMOON JORC EXPLORATION TARGETS AND MINERAL RESOURCE
ALTA MESA NI 43-101 MINERAL RESOURCE ESTIMATE (2023)
The information in this Presentation relating to the Enhanced Feasibility Study (EFS) is extracted from the announcement
entitled ‘Updated Feasibility Study identifies lower costs and increased financial returns’ dated 21st June 2021. Boss Energy
confirms that all the material assumptions underpinning the production targets, and forecast financial information derived
from the production targets, continue to apply and have not materially changed. As the EFS utilises a portion of Inferred
Mineral Resources, the ASX Listing Rules (Listing Rules) require a cautionary statement to be included in this Presentation. The
EFS is based on a Mineral Resources Estimate in accordance with the JORC 2012 guidelines (ASX: 149% Increase in Measured and
Indicated Resources at Honeymoon date 25 February 2019). The Company advises that the EFS uses a portion of Inferred
Resources; in the first 3 years (less than 1%), in the first 5 years (5%) and over the 11-year life of mine (19%). The Company
confirms that the use of Inferred Resources is not a determining factor to the Honeymoon Project’s economic viability. There
is a low level of geological confidence associated with Inferred Resources and there is no certainty that further exploration or
evaluation work will result in the determination of Indicated Resources or that the production targets reported in this
announcement will be realised.
For the purposes of Listing Rule 5.12, Boss Energy cautions that the mineral resources for the Alta Mesa Project are not
reported in accordance with the JORC Code. The mineral resource estimate at Alta Mesa is a foreign estimate prepared in
accordance with Canadian National Instrument 43-101. A competent person has not done sufficient work to classify the
foreign estimate as a mineral resource in accordance with the JORC Code, and it is uncertain whether further evaluation and
exploration will result in an estimate reportable under the JORC Code. Please refer to Annexure A for additional technical
information relating to the foreign estimate.
The mineral resource estimate and exploration target in this Presentation were reported by the Company in accordance with
Listing Rules 5.8 and 5.7 (respectively) on 25 February 2019 and 25 March 2019, respectively. The Company confirms it is not
aware of any new information or data that materially affects the information included in the previous announcement and
that all material assumptions and technical parameters underpinning the estimates in the previous announcement continue
to apply and have not materially changed. In relation to the exploration target, this does not include areas of the existing
mineral resource and the potential quantity and grade reported are conceptual only in nature. Insufficient exploration has
been conducted to estimate a mineral resource and it is uncertain whether future exploration will lead to the estimation of
a mineral resource in the defined areas.
Tonnes (Mt)
Grade (%U3O8)
Contained U3O8
(Mlbs)
Measured
3.1
0.110
7.6
Indicated
18.4
0.063
25.5
The information in this Presentation and in Annexure A provided under Listing Rules 5.12.2 to 5.12.7 that relates to the
foreign estimate for the Alta Mesa Project is based on information compiled by Mr Jason Cherry, and is an accurate
representation of the available data and studies for the Alta Mesa Project.
Mr Cherry is a member of the Australian Institute of Geoscientists (AIG) and has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify as a
Competent Person, as defined in the JORC 2012 edition of the “Australasian Code for Reporting of Mineral Resources and Ore
Reserves”. Mr Cherry has 17 years’ experience and is a full-time employee as Geology Manager for Boss Energy Ltd. Mr
Cherry consents to the inclusion in this Presentation of the matters based on this information in the form and context in
which they appear.
Resource
Category
Tonnes
(‘000)
Grade (%U3O8)
Contained
U3O8
(‘000 lbs)
Within existing
wellfields
Measured
54
0.152
164
Alta Mesa
Indicated
1,397
0.106
2,959
Mesteña Grande
Indicated
119
0.120
287
1,570
0.109
3,410
Total Measured &
Indicated Mineral
Resources
Alta Mesa
Inferred
1,263
0.126
3,192
Inferred
5,733
0.119
13,601
6,996
0.120
16,793¹
Inferred
30.9
0.057
38.5
Mesteña Grande
Total
52.4
0.062
71.6
Total Inferred Mineral
Resource
Boss Energy | A global multi-mine Uranium producer
19
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (Boss Energy or
Company). NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the
recipient’s investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent
assessment and investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should
not rely on any statement or the adequacy and accuracy of any information. This Presentation is in summary form and does not
purpose to be exhaustive. This Presentation should be read in conjunction with Boss Energy’s periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of
the Information. Boss Energy and its directors, employees, agents and consultants shall have no liability (including liability to any
person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or
implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute that
can not be excluded.
FORWARD LOOKING STATEMENTS
All dollar amounts are in Australian dollars unless otherwise indicated. This announcement may contain certain statements and
projections provided by or on behalf of Boss Energy Limited with respect to the anticipated future undertakings. These forwardlooking statements reflect various assumptions by or on behalf of Boss Energy. Accordingly, these statements are subject to
significant business, economic and competitive uncertainties and contingencies associated with the mining industry which may be
beyond the control of Boss Energy which could cause actual results or trends to differ materially, including but not limited to price
and currency fluctuations, geotechnical factors, drilling and production results, development progress, operating results, reserve
estimates, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries, approvals
and cost estimates, environmental risks, ability to meet funding requirements, share price volatility. Accordingly, there can be no
assurance that such statements and projections will be realised. Boss Energy makes no representations as to the accuracy or
completeness of any such statement of projections or that any forecasts will be achieved. Additionally, Boss Energy makes no
representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under
statute or otherwise) is or will be accepted by Boss Energy or by any of their respective officers, directors, shareholders, partners,
employees, or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions or matters
(express or implied) arising out of, contained in or derived from this announcement or any omission from this announcement or of
any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In furnishing
this announcement, Boss Energy undertakes no obligation to provide any additional or updated information whether as a result of
new information, future events or results or otherwise. Nothing in this material should be construed as either an offer to sell or a
solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in isolation as a
basis to invest in Boss Energy.
The information in this document relating to the Enhanced Feasibility Study(“EFS”) is extracted from the announcement entitled
‘Updated Feasibility Study identifies lower costs and increased financial returns’ dated 21 June 2021. Boss Energy confirms that
all the material assumptions underpinning the production targets, and forecast financial information derived from the production
targets, continue to apply and have not materially changed.
The Company advises that the EFS uses a portion of Inferred Resources in the first 3 years (less than 1%), in the first 5 years(5%)
and over the 11-year life of mine(19%). The Company confirms that the use of Inferred Resources is not a determining factor to the
Honeymoon Project’s economic viability. There is a low level of geological confidence associated with Inferred Resources and there
is no certainty that further exploration or evaluation work will result in the determination of Indicated Resources or that the
production targets reported in this announcement will be realised.
REFERENCE TO PREVIOUS ASX ANNOUNCEMENTS
The mineral resource estimate and exploration target in this announcement were reported by the Company in accordance with
listing rules 5.8 and 5.7(respectively)on 25 February 2019 and 25 March 2019, respectively. The Company confirms it is not aware
of any new information or data that materially affects the information included in the previous announcement and that all material
assumptions and technical parameters underpinning the estimates in the previous announcement continue to apply and have not
materially changed.
In relation to the exploration target, this does not include areas of the existing mineral resource and the potential quantity and
grade reported are conceptual only in nature. Insufficient exploration has been conducted to estimate a mineral resource and it is
uncertain whether future exploration will lead to the estimation of a mineral resource in the defined areas.
EFFECT OF ROUNDING
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
PAST PERFORMANCE
Past performance information, including past share price performance of Boss Energy and pro forma financial information, given in
this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss Energy’s
(or anyone else’s) views on Boss Energy’s future financial performance or condition. Past performance of Boss Energy cannot be
relied upon as an indicator of (and provides no guidance as to) the future performance of Boss Energy. Nothing contained in this
Presentation nor any information made available to you is, or shall be relied upon as a promise, representation, warranty or
guarantee, whether as to the past, present or future.
JORC CODE
It is a requirement of the Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the Joint
Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves ("JORC Code"). Investors
outside Australia should note that while ore reserve and mineral resource estimates of the Company in this Presentation comply
with the JORC Code (such JORC Code-compliant ore reserves and mineral resources being "Ore Reserves" and "Mineral
Resources" respectively), they may not comply with the relevant guidelines in other countries and, in particular, do not comply
with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the
"Canadian NI 43-101 Standards"); or (ii) Item 1300 of Regulation S-K, which governs disclosures of mineral reserves in
registration statements filed with the SEC. Information contained in this document describing mineral deposits may not be
comparable to similar information made public by companies subject to the reporting and disclosure requirements of Canadian or
US securities laws.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy.
As the EFS utilises a portion of Inferred Mineral Resources, the ASX Listing Rules require a cautionary statement to be included in
this presentation. The EFS is based on a Mineral Resources Estimate in accordance with JORC guidelines 2012 (ASX:149% Increase
in Measured and Indicated Resources at Honeymoon dated 25 February 2019).
Boss Energy | A global multi-mine Uranium producer
20
Boss Energy Limited
Macquarie Conference
Keep in touch
+61 (8) 6263 4494
boss@bossenergy.com
ASX: BOE | OTCQX: BQSSF
Share your feedback
Discover