Boss Energy - 2026 Market Day Presentation
Released
Released
Announcement PDF
ASX Release 15 September 2026
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Matthew Dusci - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
Boss Energy – 2026 Market Day Presentation
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) (“Boss” or the “Company”) is pleased to provide a
release of the Market Day presentation that it will provide to institutional investors and analysts today
in Sydney.
The Market Day will provide an update on Boss’ strategy, operational priorities and growth
opportunities, underpinned by the Honeymoon New Feasibility Study and the Company’s
strengthened leadership and technical capability.
The program will also outline Boss’ aspiration to build a larger, lower-cost and longer-life uranium
business through operational improvements and the potential development of Gould’s Dam and
Jason’s Deposit.
A copy of the Market Day presentation is attached.
A recording of the presentation will be available by Friday 18 September, and the link to this recording
is: https://loghic.eventsair.com/113514/516881/Site/Register.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss
Energy Limited.
For further information, contact:
Matthew Dusci
Managing Director
P: +61 (8) 6263 4494
E: boss@bossenergy.com
1
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Aglobal multi-mine Uranium producer.
ASX: BOE
OTCQX: BQSSF
bossenergy.com
15 September 2026
Boss Energy - Market Day
2
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Disclaimer and Important Notices
This investor presentation (“Presentation”)has been prepared by Boss Energy Limited (ACN 116 834 336) (“Boss Energy”, “Boss” or “Company”).
NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitationto subscribe for securities in Boss Energy pursuant to the CorporationsAct 2001 (Cth) and has not been lodged with the Australian Securities and Investments
Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the recipient’s investment objectives, financialcircumstances or particular needs. Each recipient must make
his/herown independent assessment and investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should not rely on any statement or the adequacy and accuracy of any information. This
Presentation is in summary form and is not exhaustive. This Presentation should be read in conjunctionwith Boss Energy’s periodic and continuousdisclosure announcements lodged with the Australian Securities Exchange, which are
available to download at www.asx.com.au.
PAST PERFORMANCE
Past performance information, includingpast share price performance of Boss and past HoneymoonProject information, given in this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an
indicationof Boss’s (or anyone else’s) views on Boss’s future activities, guidance or financialperformance or condition. Past performance of Boss cannot be relied upon as an indicator of (and provides no guidance as to) the future
performance of Boss.
FORWARD LOOKING STATEMENTS
This Presentation contains certain forward-looking statements provided by or on behalf of Boss with respect to potential future matters. Forward-looking informationmay include, without limitation, statements regarding plans, strategies
and objectives of Boss, production and financial guidance, financialforecasts, estimates of project milestones and timing and expected costs or production outputs. In some cases, forward-looking information can be identified by terms
such as “may”, “will”, “should”, “expect”, “plan”, “anticipate”, “believe”, “intend”, “estimate”, “predict”, “potential”, “continue” or other similar expressions concerningmatters that are not historicalfacts.
Guidance as to production, unit costs and capital expenditure is based on assumptions, budgets and estimates existing at the time of assessment which may change over time impacting the accuracy of those estimates. These estimates are
developed in the context of an uncertain operating environment including in respect of inflationarymacroeconomic conditions, and uncertainties surrounding the risks associated with mining which may impact production and have a flow on
effect on sales. Actual results may therefore vary significantly depending on these risks and the timing required to address them.
Forward-lookingstatements reflect Boss’s expectations at the date of this Presentation, however they are not guarantees or predictions of future performance or statements of fact. Forward-looking informationinvolves known and unknown
risks, uncertainties and other factors (many of which are beyond the controlof Boss and its directors and management) which may cause the actual results, performanceor achievements of Boss and its business to be materially different
from any future results, performance or achievements expressed or implied by the forward-looking information. Accordingly, undue reliance should not be placed on forward-looking information.
The forward-lookingstatements in this Presentation reflect various assumptions by or on behalf of Boss (which assumptions may prove to be inaccurate). Accordingly, this is another reason why such statements are subject to significant
business, technical, legal, economic and competitive and other uncertainties and contingencies and other factors which may be beyond the control of Boss which could cause actual results or trends to differ materially from the forward-
looking statements in this Presentation, including but not limited to differences or inaccuracies arising from price and currency fluctuations, geotechnicalfactors, geological and miningfactors, estimated continuity of mineralisedhorizons,
metallurgical and processing factors, sales factors, drilling and production results, development progress, operating results, mineral resource estimates, legal issues, legislative, fiscal and regulatory developments, economicand financial
market conditionsin various countries, approvals and cost estimates, environmental risks, ability to meet funding requirements, share price volatility, uranium markets and other matters.
Accordingly, there can be no assurance that such forward-looking statements and projections will be realised.
Boss makes no representations as to the accuracy or completeness of any forward-lookingstatements or projections or that any forecasts will be achieved. Additionally Boss makes no representation or warranty, express or implied, in
relation to, and (to the maximum extent permitted by law) no responsibility or liability (whether for negligence, under statute or otherwise) is or will be accepted by Boss or by any of its officers, directors, shareholders, partners, employees, or
advisers as to or in relation to the accuracy or completeness of the information, statements, opinions ormatters (express or implied) arising out of, contained in or derived from this Presentation or any omission fromthis Presentation.
Boss does not undertake or accept any obligation or undertaking to release publicly any updates or revisionsto any forward-lookingstatements to reflect any change in Boss’s expectations or any change in events, conditionsor
circumstances on which any such statement is based, except as required by law.
Mineral Resource estimates are necessarily imprecise and depend on interpretations and geologicalassumptions, minerals prices, cost assumptions and statistical inferences(and assumptions concerningother factors, includingmining,
processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors) which may ultimately prove to be incorrect or unreliable.
Mineral Resource estimates are regularly revised based on actual explorationor production experience or new information and could therefore be subject to change. In addition, there are risks associated with such estimates, including
(among other risks) that minerals mined may be of a different grade or tonnage from those in the estimates and the ability to economicallyextract and process the minerals may become compromised or not eventuate.
Accordingly, this is another reason why no assurances can be given of whether the production guidance, financialforecasts or other forecasts or other forward-lookingstatements or informationin this Presentation will be achieved.
3
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Disclaimer and Important Notices
CURRENCY AND EFFECT OF ROUNDING
All dollar (“$”) amounts are in Australian dollars unless otherwise stated. All cost forecasts are in real 2026 terms. A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are
subject to the effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
MINERAL RESOURCE ESTIMATES
The information in thisPresentation that relates to the MineralResource estimate for the Honeymoon Deposit was reported in an announcement by the Company dated 27 August 2026 titled “HoneymoonNew Feasibility Study and MRE
Update”.
The information in thisPresentation that relates to the MineralResource estimate for Gould’s Dam and the Jason's Deposit was reported in an announcement by the Companydated 19 March 2026 titled “Gould’s Dam and Jason's
Deposit Mineral Resource and Permitting Update.”
The Company confirmsthat it is not aware of any new information or data that materially affects the informationincluded in the original market announcements referred to above and that all material assumptions and technical
parameters underpinningthe HoneymoonDeposit, Gould’s Dam and Jason's Deposit Mineral Resource estimates in the original market announcements referred to above continue to apply and have not materially changed.
PRODUCTION TARGET AND FORECAST FINANCIAL INFORMATION
The information in thisPresentation that relates to the productiontarget (and forecast financial information derived from the production target) for the HoneymoonDeposit was reported in an announcement by the Company dated 27
August 2026 titled “Honeymoon New Feasibility Study and MRE Update.”
The Company confirmsthat all the material assumptions underpinning the production target and forecast financial information derived from the production target in that announcement continue to apply and have not materially
changed.
The production target and forecast financial informationfor the HoneymoonDeposit referred to in this Presentation is based on 65% Indicated MineralResources and 35% Inferred Mineral Resources over the 9-year life of mine. The first
4 years of the production target is underpinnedby 89% Indicated Mineral Resources and 11% Inferred Mineral Resources. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty
that further explorationwork will result in the determinationof Indicated Mineral Resources or that the productiontarget will be realised.
The Company believes that it has a reasonable basis for providingthe production target and forward-looking statements in this Presentation announcement as the Inferred Mineral Resources are not the determining factor in project
viability (noting, most significantlythat Honeymoonis already in production). Refer to Section 12 of the New Feasibility Study (attached to the Company’sannouncement dated 27 August 2026 titled “Honeymoon New Feasibility Study
and MRE Update.”) for the material assumptions underpinning the production target and forecast financial information.
ASPIRATIONAL STATEMENTS
The statements which appear throughout this announcement regarding the aspiration for the Honeymoon ProcessingHub to produce 2.5M lbs U₃O₈ at an AISC of A$65/lb (US$45/lb) by the early 2030s are aspirational statements and
not a Production Target. The Companydoes not yet have reasonable grounds to believe these statements can be achieved. In particular, the statements are aspirationalbecause:
1. whilst the Company has undertaken various internal studies on the Gould's Dam deposit and Jason's Deposit, the Company has not yet completed a Scoping Study or a Feasibility Study or published a Production Target for
Gould’s Dam or Jason's Deposit. Substantial further work is required before such a Scoping Study, Feasibility Study or Production Target could be completed or published; and
2. the aspiration is dependent on integrating the Gould’s Dam and Jason'sDeposit with the existing Honeymoon Mineoperations. This remains subject to a number of variables, including: further drilling and resource definition;
hydrogeological, metallurgical and wellfield performance; success of the wide-spaced wellfield design which is still currently being tested at Honeymoon; ISR recovery assumptions; selection and implementation oftransport and
processing methods, including the proposed Jason'sDeposit trunkline and Gould’s Dam resin or eluate trucking options; Honeymoonplant and infrastructure capacity and upgrades; and obtainment of applicable regulatory and
environmental approvals.
Accordingly, there is no certainty that the aspiration will be achieved.
4
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Presenters and Q&A
Deep operational, technical and corporate expertise
Managing Director
and Chief Executive
Officer
Matt Dusci
Managing Director
of Numerco Limited
Scott Lawrence
Chief Financial
Officer
Justin Laird
General Manager
Conrad Wilkins
Head of Technical
Services and Planning
Olivier Regnault
Agenda
1.
Overview
+ Strategy
Matt Dusci
2.
Market
Scott Lawrence
3.
Sales
Justin Laird
4.
Capital
Management
Justin Laird
5.
People
Matt Dusci
6.
Honeymoon
Operations
Conrad Wilkins
7.
Wellfields
Olivier Regnault
8.
Gould’s Dam
+ Jason's
Deposit
Matt Dusci
9.
Alta Mesa
Matt Dusci
10.
Closing
Matt Dusci
Principal Geologist
(RSC)
Guillaume Lorilleux
General Counsel
Kathryn Walker
5
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Boss Energy. A global multi-mine Uranium producer
Business
Overview &
Strategy
Investor Presentation 5
6
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Boss Energy. A global multi-mine Uranium producer
Boss Energy
An established
producer:
Honeymoon provides an
operating mine, processing
infrastructure and workforce
from which to build
Uniquely positioned to
drive shareholder value
Foundations in place – turning this into reliable performance, growth and shareholder value
Specialist capability:
Our combined uranium
operating experience and
technical ISR expertise
support better decisions and
de-risk future opportunities
Financial strength and
flexibility:
Strong balance sheet and
strategic uranium inventory
Pathway for growth:
Potential for low- capital
growth across the asset
portfolio
Exposure to uranium
opportunity:
Our production base,
inventory and uncontracted
position provide exposure to
tightening uranium market
7
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Building a reliable, lower-cost, long-life uranium business
Business Strategy
Business Strategy
Building a reliable, lower-cost, long-life uranium business
Honeymoon — an organic pipeline of deposits with established infrastructure
Safe, reliable and predictable
production from the wide-
spaced wellfield design,
underpinned by operational
excellence.
Deliver and Optimise
Honeymoon
Produce from Jason's
Deposit and Gould’s Dam,
leveraging Honeymoon’s
installed processing
infrastructure — three
deposits, one plant.
Build the Regional
Production Hub
Increase the known Mineral
Resource and systematically
explore for new ISR-
amenable deposits across
the region to further leverage
established infrastructure.
Grow the Resource &
Discovery Pipeline
Key Enablers Our People Our Technical & Operational Expertise Our Culture
Ensure other assets in the
portfolio achieve an
acceptable return on capital.
Maximise and
Optimise the
existing portfolio
Beyond Honeymoon
8
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Deliver and Optimise Honeymoon
1. Refer to ASX announcement 27 August 2026 “Honeymoon New Feasibility Study and MRE Update”
2. Refer to the "Production Target and Forecast Financial Information" section of the "Disclaimer and Important Notices" section of this Presentation for further information.
Honeymoon New Feasibility Study1
The Challenge
The EFS design assumptions no longer reflected the orebody.
The cost reset
Incremental savings could not unlock the lower-grade resource.
The pathway forward
Wider spacing changes the economics of wellfield development.
Facing the challenge built the capability and urgency that reset
our cost structure and materially improved our understanding
13.8 Mlbs
Planned U₃O₈ production
Nine years operating period to 20352
A$50 / A$79
C1 / AISC per lb
Life-of-mine averages to 20342.
01
02
03
• ~A$30/lb lower like-for-like AISC
• ~28% higher PLS grade
• ~50% less wellfield infrastructure
• Cost base enables a lower cut-off grade
Step-change in economics
9
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Build the Regional Production Hub
Lower costs change how we view the mineralised system
The opportunity at Gould’s Dam and Jason's Deposit is defined by the cost of recovering ISR-amenable uranium, not by grade alone
Key learning from Honeymoon
Wide-spaced ISR lowers the
cost to recover each pound
• Fewer wells
• less infrastructure
• more effective leaching
New development lens
System scale +
ISR amenability
Grade, permeability, recovery
and cost assessed together
45.1Mlbs1
2× Honeymoon’s mineral resource
Gould’s Dam + Jason’s Deposit
Gould’s Dam and Jason's Deposit should be viewed as significant mineralised systems
— not simply as lower-grade satellite resources.
Reducing the cost threshold has the potential to convert a broader portion of these systems into economic development opportunities.
Strategic Implication
1. Refer to Appendix 1 for further details of Mineral Resource classificationfor Gould’s Dam and Jason's Deposit
10
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
One plant, three deposits
Build the Regional Production Hub
3 deposits
Honeymoon, Gould’s Dam and Jason's Deposit feeding a single plant
65.9Mlbs
Combined mineral resource across the three deposits2
1 processing hub
Honeymoon plant, utilities and workforce already in place
1. Refer to the “Aspirational Statements” section in the "Disclaimer and Important Notices" section of this presentation.
2. Refer to Appendix 1 for further details of Mineral Resource classificationfor Gould’s Dam, Jason's Deposit and Honeymoon
Satellite deposits, one plant — more pounds, minimised new infrastructure
• Low-capital growth
Latent back-end capacity lifted with minimal capital
• Longer mine life
Gould’s Dam and Jason's Deposit extend beyond the NFS
• Operating synergies
Fixed costs spread over more pounds — aspiration for the
AISC to be ~A$12/lb lower than the NFS by the early 2030s1
• Higher sustained output
Hub aspiration of 2.5Mlbs a year at A$65/lb AISC by the early 2030s1
• Staged capital
Spend phases in as each deposit starts
• Resilient supply
Feed from three orebodies, not one
Loaded Resin
Trucked
Gould’s Dam – loaded resin
33.1Mlbs resource, resin trucked ~75km — no long-distance pipelines
New Trunkline +
Intermediate Storage
Honeymoon Processing Hub Jason's Deposit – new trunkline
12.0Mlbs resource, 13km twin trunkline to Honeymoon
11
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Production and costs could be meaningfully improved
Build the Regional Production Hub
2.5Mlbs p.a.
Aspirational hub rate by the early 2030s, using installed
back-end capacity1
1.3Mlbs
1.9Mlbs
2.5Mlbs
A$88/lb
US$62/lb A$77/lb
US$54/lb
A$65/lb
US$45/lb
-
10
20
30
40
50
60
70
80
90
100
-
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
FY27 Honeymoon only Early 2030's Honeymoon (NFS) Early 2030's Production Hub at
NFS spacing
Kazatomprom 2026
AISC guidance range
Early 2040s
A$65/lb (US$45/lb)
Aspirational AISC at hub scale by the early 2030s, on the
NFS cost structure1
~A$12 /lb lower
Aspirational unit cost reduction by the early 2030s
from fractionalising fixed costs1
• A robust foundation
The NFS provides a robust foundation for
Honeymoon and pathway for value creation at
Jason's Deposit and Gould’s Dam.
• A step change in performance
Aspiration is to materially increase production, lower
unit costs and extend mine life beyond the
Honeymoon-only plan.
• Optimise three production sources
Integrate all three deposits through a regional operating
and processing hub to increase utilisation of existing
infrastructure.
Honeymoon only
Production hub
aspiration
AISC (A$/lb)
Aspiration Rate and AISC by Development Stage1
1. Refer to the “Aspirational Statements” section in the "Disclaimer and
Important Notices" section of this presentation.
12
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
The foundations of our success
Strategy enablers
Building a lasting competitive advantage through the strength of our team and our culture
Our people, technical capability and culture underpin delivery of our strategy
Our People
Our technical &
operating capability
Our Culture
• Renewed Board and leadership, with deep industry experience
• Building depth across technical and operational teams
• Developing our people to support the next phase of growth
• Integrated ISR expertise, from geology through to processing
• Operating data and modelling inform better decisions
• Applying Honeymoon learnings to optimisation and satellite growth
• Safety and care for our people at the centre of every decision
• One team, with clear ownership and accountability for delivery
• Challenging assumptions and learning to improve performance
13
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Focused on value creation
Capital discipline and shareholder value
Plan is to grow in production, operating margins and long-term value while being strategic on capital deployment.
Ensure margins
are generated
Focused on the
generation of margin
and costs – have laid a
new foundation for the
business through the
NFS
Remain leveraged
to tightening
uranium market
Remain strategically
uncontracted with
significant uranium
inventory
Leverage existing
capital – low capital
cost growth
Maximise the contribution
of Honeymoon’s
processing infrastructure
and operating capability –
ensuring low capital
growth pathway
Commit capital
where it earns a
return
Stage wellfield
investment and
satellite development
as technical
confidence and
approvals advance
Operational
Excellence &
Business Resilience
A culture of continuous
improvement and
delivery to plan
01 02 03 04 05
14
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Uranium Market
Outlook
14
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Macro Trends and Micro Factors
15
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Boss Energy. A global multi-mine Uranium producer
Micro Uranium Market Economics
The Macro
Market
Backdrop
Prevailing
Conditions
and Relative
Economics
Maturing
Market
Technology
Growth in
Transaction
Transparency
Feedback
from WNA
Symposium
The Wider
Outlook
Micro Uranium Market Economics
Micro Market
Drivers - The
Evolution
16
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Macro Picture
U3O8 demand is set to outrun supply
0
100
200
300
400
500
600
2025 2040 2040 Reference 2040 Upper
World reactor requirements, million lbs U3O8 per year
3.1bn lbs
of cumulative utility uranium requirements are uncovered by
contracts to the end of 2045.
UxC, via Cameco, 2026
2030s
the decade today's top-producing mines deplete — while
new mines now take 10–20 years to develop.
WNA; ConverDyn, 2025
90%
of 2024 reactor demand was met by mined supply —
the rest drawn from finite, shrinking secondary
sources.
World Nuclear Association,2025
179
278
390
531
World Nuclear Association,2025
17
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Macro Picture, Market Fundamentals
Mine supply is concentrated, constrained and ageing
0
20
40
60
80
100
120
140
160
180
200
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
World uranium mine production, million lbs U3O8 per year
WNA production data (tU, converted at 2,600 lbs U3O8/tU). 2024 output of 60,213 tU met just 90% of reactor requirements
(2023: 83%; 2020-2022: 74-76%) — the balance came from finite secondary supplies.
77 Mlbs
Kazatomprom’s reduced 2026 production quota (from 85
Mlbs) — with willingness to flex a further 20% lower.
Kazatomprom,via Sprott, 2026
Mid-2030s
when existing mines face resource depletion
— while new mines now take 10-20 years to develop.
WNA Nuclear Fuel Report 2025, ConverDyn
75%
Of world production comes from just three countries
— Kazakhstan (39%), Canada (24%) and Namibia (12%).
World Nuclear Association,2024 data
Sources: World Nuclear Association, World Uranium Mining Production (2024 data) & Nuclear
Fuel Report 2025. Sprott, Uranium Outlook 2026. ConverDyn via World Nuclear News (2025)
164
157 157
141 142
124 124
129
142
157
18
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Macro Picture, Market Fundamentals
The gap between demand and mined supply
0
50
100
150
200
250
300
350
400
2022 2024 2040 Reference
Reactor requirements vs mine production, million lbs U3O8 per year
Reactor requirements Mine production 233 Mlbs/yr
by which 2040 Reference demand (390 Mlbs) exceeds
today’s entire annual mine output (157 Mlbs).
Derived from WNA, 2025
3.1bn lbs
of cumulative utility uranium requirements are
uncovered by contracts to the end of 2045
UxC, via Cameco, 2026
116 vs 185
Mlbs placed under long-term contract in 2025, against ~185
Mlbs consumed annually — contracting below replacement
rate.
Cameco; Sprott 2026
2022 and 2024: WNA actuals (production, and requirements implied by WNA’s stated 78% / 90% mine-supply coverage). 2040: WNA
Reference Scenario demand vs mine output held at today’s level for scale — WNA expects existing mines to deplete from the mid-
2030s, so output without new mines would be lower still.
165
129
157
174 157
390
19
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Consumption Lead Time
The Front-End Nuclear Fuel Cycle
Mining & Milling
Uranium ore is
mined and milled
into yellowcake.
01
Conversion
U3O8 is purified
and converted to
UF6 gas.
02
Reactor
Assemblies are
loaded into the
core to generate
electricity.
05
Fuel Fabrication
Enriched uranium
becomes UO2
pellets in fuel
assemblies.
04
Front End Complete
Fabricated Fuel
Enrichment
U-235 is raised
from 0.7% to 3-5%
in centrifuges.
03
EUP - $/SWU
UF6 - $/KgU
U3O8 - $/lb
20
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Boss Energy. A global multi-mine Uranium producer
Sales
Strategy
Investor Presentation 20
21
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Marketing & Offtake
Deliberately under-contracted
73% of inventory and forecast NFS life-of-mine production is uncontracted, with forward sales executed on a rolling forward basis.
Life-of-mine contract position
73%
Uncontracted
16% Contracted
11% Inventory on hand
Strategically under-contracted
Only 16% of total inventory and LOM production is
committed, which is mostly covered by inventory on
hand, preserving substantial exposure to a rising spot price.
Forward sales
Uncommitted pounds are sold on a
forward basis, giving Boss greater
control over timing of sales.
Inventory as optionality
1.58Mlbs2 of drummed inventory
adds timing flexibility and further
leverage to price.
Marketing strategy
Calendar Year $60 $80 $100 $120 $140
2027 57 75 91 105 119
2028 57 76 94 111 127
2029 57 76 95 112 129
2030 58 77 96 113 130
2031 58 77 95 112 129
2032 59 78 98 117 136
2033 60 80 100 120 140
Weighted Average Realised Price (US$/lb)
1. Life-of-mine production based on production from Honeymoon only as set out in the NFS. Excludes aspirational production from Gould’s Dam and Jason's Deposit
2. As at 30 June 2026.
22
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Boss Energy. A global multi-mine Uranium producer
Capital
Framework
Investor Presentation 22
23
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Capital Management
A disciplined capital allocation framework
1.Balance sheet metrics as at 30 June 2026.
2.1.581Mlbs at UxC spot rate on 29 June 2026 of US$84.75 and AUD:USD of 0.6869
Ongoing transition to wide-spaced wellfield design to be funded organically.
Capital allocation framework
Operations
Value-accretive wellfield development
Acceleration of satellite resources
Maintain cash working capital balance
Inventory movements
01
02
03
04
05
Hold cash as a working capital balance.
Cash Target Range
Wellfield capital is committed only
where returns are accretive.
Value-Accretive Wellfields
Adjust inventory based on market conditions and
capital requirements. Realise additional value e.g.
inventory loan.
Inventory Movements
The transition to wide-spaced wellfield
design is funded from operations.
Organic Funding
Bring satellite deposits forward to
fractionalise fixed costs and realise value.
Accelerate Satellite Resources
Debt Free
No borrowings; balance sheet undrawn
$207M
Cash, inventory and liquid assets
at book value1
$195M
Inventory at market value2 vs $116M at
book value1
24
Investor Presentation
Boss Energy. A global multi-mine Uranium producer
Boss Energy. A global multi-mine Uranium producer
Our People
Our Team
24
Investor Presentation
25
Investor Presentation