Becoming a multi-mine Uranium producer
Alta Mesa Investment and Strategic Joint Venture with enCore
Energy and A$215m Capital Raising
6 December 2023
ASX: BOE | OTCQX: BQSSF
bossenergy.com
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
Not for release to US wire services or distribution in the United States.
This investor presentation (“Presentation”) is dated 6 December 2023 and has been prepared by Boss Energy Limited (ACN 116
834 336) (“Boss Energy” or “Company”). This presentation has been prepared in relation to:
•
a proposed placement of new fully paid ordinary shares in Boss Energy (“New Shares”) to certain strategic investors,
institutions and other sophisticated and professional investors in accordance with section 708A of the Corporations Act 2001
(Cth) (“Corporations Act”) to raise approximately A$205 million (before costs) (“Placement”); and
•
an offer to eligible Boss Energy shareholders to apply for New Shares under a share purchase plan as further described in this
Presentation (“SPP”), to raise A$10 million.
Together, the Placement and SPP are referred to as the “Equity Raising” or “Offer”. The Offer is not underwritten. The information
contained in this Presentation or subsequently provided to any recipient of this Presentation whether orally or in writing by or on
behalf of Boss Energy or its respective employees, agents or consultants (“Information”) is provided to the recipients on the terms
and conditions set out in this notice. The purpose of this Presentation is to provide recipients with information relating to the
Placement, Boss Energy’s Honeymoon uranium project and Boss Energy’s proposed joint venture with enCore Energy Corp
(TSX.V:EU; NYSE:EU) (“enCore”).
This Presentation has been authorised for release by the board of Boss Energy.
SUMMARY INFORMATION
By reviewing or retaining these materials, or attending or participating in this Presentation, you acknowledge and represent that
you have read, understood and accepted the terms of this “Disclaimer and Important Notices”. This Presentation contains
summary information about Boss Energy, and its activities current only at the date of this Presentation. This Presentation is for
information purposes only. The information in the Presentation is of a general nature only and does not purport to be complete.
This Presentation should be read in conjunction with Boss Energy’s most recent financial report and other periodic and continuous
disclosure announcements lodged with the Australian Securities Exchange (“ASX”) which are available at www.asx.com.au and
also available on Boss Energy’s website at www.bossenergy.com. Certain information in this Presentation may have been
obtained from research, surveys or studies conducted by third parties, including industry or general publications. Neither Boss
Energy nor its representatives have independently verified any such information sourced from third parties or industry or general
publications.
NOT AN OFFER
This Presentation is not a prospectus, product disclosure statement or other disclosure document under the Corporations Act, or
other offering document under Australian law or any other law. This Presentation, and the information contained in it, is provided
for information purposes only and is not an offer or solicitation or an invitation or recommendation to subscribe for, acquire or buy
securities of Boss Energy (including New Shares), or any other financial products or securities in any place or jurisdiction.
The distribution of this Presentation (including an electronic copy) in the United States or elsewhere outside of Australia may be
restricted by law. If you come into possession of this Presentation, you should observe such restrictions. Any non-compliance with
these restrictions may contravene applicable securities laws. Refer to the “Foreign Offer Jurisdictions” section in this Presentation
for more information. By accessing this Presentation you represent and warrant that you are entitled to receive such Presentation
in accordance with these restrictions and agree to be bound by the limitations contemplated by them.
recipient’s investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent
assessment and investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should
not rely on any statement or the adequacy and accuracy of any information. This Presentation is in summary form and does not
purpose to be exhaustive. This Presentation should be read in conjunction with Boss Energy’s periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of
the Information. Boss Energy and its directors, employees, agents and consultants shall have no liability (including liability to any
person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or
implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute that
can not be excluded.
FORWARD LOOKING STATEMENTS
All dollar amounts are in Australian dollars unless otherwise indicated. This Presentation may contain certain statements and
projections provided by or on behalf of Boss Energy Limited with respect to the anticipated future undertakings. These forwardlooking statements reflect various assumptions by or on behalf of Boss Energy. Accordingly, these statements are subject to
significant business, economic and competitive uncertainties and contingencies associated with the mining industry which may be
beyond the control of Boss Energy which could cause actual results or trends to differ materially, including but not limited to price
and currency fluctuations, geotechnical factors, drilling and production results, development progress, operating results, reserve
estimates, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries,
approvals and cost estimates, environmental risks, ability to meet funding requirements, share price volatility. Accordingly, there
can be no assurance that such statements and projections will be realised. Boss Energy makes no representations as to the
accuracy or completeness of any such statement of projections or that any forecasts will be achieved. Additionally, Boss Energy
makes no representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence,
under statute or otherwise) is or will be accepted by Boss Energy or by any of their respective officers, directors, shareholders,
partners, employees, or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions or
matters (express or implied) arising out of, contained in or derived from this Presentation or any omission from this Presentation
or of any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In
furnishing this Presentation, Boss Energy undertakes no obligation to provide any additional or updated information whether as a
result of new information, future events or results or otherwise. Nothing in this Presentation should be construed as either an offer
to sell or a solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in
isolation as a basis to invest in Boss Energy.
EFFECT OF ROUNDING
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
PAST PERFORMANCE
Past performance information, including past share price performance of Boss Energy and pro forma financial information, given in
this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss Energy’s
(or anyone else’s) views on Boss Energy’s future financial performance or condition. Past performance of Boss Energy cannot be
relied upon as an indicator of (and provides no guidance as to) the future performance of Boss Energy. Nothing contained in this
Presentation nor any information made available to you is, or shall be relied upon as a promise, representation, warranty or
guarantee, whether as to the past, present or future.
NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
Corporations Act and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the
Boss Energy | Australia’s Next Clean Energy Producer
2
Disclaimer and Important Notices
JORC CODE
It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the
Joint Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves ("JORC Code"). Investors
outside Australia should note that while ore reserve and mineral resource estimates of the Company in this Presentation comply
with the JORC Code (such JORC Code-compliant ore reserves and mineral resources being "Ore Reserves" and "Mineral
Resources" respectively), they may not comply with the relevant guidelines in other countries and, in particular, do not comply
with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the
"Canadian NI 43-101 Standards"); or (ii) Item 1300 of Regulation S-K, which governs disclosures of mineral reserves in
registration statements filed with the SEC. Information contained in this document describing mineral deposits may not be
comparable to similar information made public by companies subject to the reporting and disclosure requirements of Canadian or
US securities laws.
INVESTMENT RISK
As noted above, an investment in shares in Boss Energy (including New Shares) is subject to investment and other known and
unknown risks, some of which are beyond the control of Boss Energy. Boss Energy does not guarantee any particular rate of
return or the performance of Boss Energy, nor does it guarantee the repayment of capital from Boss Energy or any particular tax
treatment. Prospective investors should have regard to the risks outlined in this Presentation, including the “Key Risks” section of
this Presentation, when making their investment decision and should make their own enquires and investigations regarding all
information in this Presentation, including but not limited to the assumptions, uncertainties and contingencies which may affect
future operations of Boss Energy and the impact that different future outcomes may have on Boss Energy. These risks, together
with other general risks applicable to all investments in listed securities not specifically referred to, may affect the value of shares
in Boss Energy (including New Shares) in the future. There is no guarantee that the New Shares will make a return on the capital
invested, that dividends will be paid on the New Shares or that there will be an increase in the value of the New Shares in the
future. Accordingly, an investment in Boss Energy should be considered highly speculative and potential investors should consult
their professional advisers before deciding whether to subscribe for New Shares.
DISCLAIMER
Macquarie Capital (Australia) Limited, Canaccord Genuity (Australia) Limited and Bell Potter Securities Limited (together the
“Joint Lead Managers”) are acting as joint lead managers to the Placement.
have not relied on any statements made by a Limited Party in relation to the Placement and you further expressly disclaim that
you are in a fiduciary relationship with any of them.
The Joint Lead Managers and their affiliates and related bodies corporate are full service financial institutions engaged in various
activities, which may include (but are not limited to) underwriting, securities trading, financing, corporate advisory, financial
advisory, investment management, investment research, principal investment, hedging, market making, market lending, brokerage
and other financial and non financial activities and services including for which they have received or may receive customary fees
and expenses. In the ordinary course of their various business activities, the Joint Lead Managers and their affiliates or related
bodies corporate may purchase, sell or hold a broad array of investments and actively trade securities, derivatives, loans,
commodities, currencies, credit default swaps and other financial instruments for their own account and for the accounts of their
customers, and such investment and trading activities may involve or relate to assets, securities and/or instruments of Boss
Energy, and/or persons and entities with relationships with Boss Energy. The Joint Lead Managers and their affiliates and related
bodies corporate may also communicate independent investment recommendations, market colour or trading ideas and/or publish
or express independent research views in respect of such assets, securities or instruments and may at any time hold, or
recommend to clients that they should acquire, long and/or short positions in such assets, securities and instruments. One or more
entities within the Joint Lead Managers' respective groups may provide other financial services to Boss Energy or its affiliates and
related bodies corporate. The Joint Lead Managers are acting as lead managers and bookrunners to the Placement for which they
have received or expect to receive fees and expenses.
Determination of eligibility of investors for the purposes of all or any part of the Placement is determined by reference to a
number of matters, including legal requirements and the discretion of Boss Energy and the Joint Lead Managers. To the maximum
extent permitted by law, Boss Energy, the Joint Lead Managers and their respective Limited Parties expressly disclaim any duty or
liability (including for negligence) in respect of the exercise of that discretion or otherwise. Any participant in the Placement
acknowledges that allocations under the Placement are at the sole discretion of the Joint Lead Managers and Boss Energy. To the
maximum extent permitted by law, the Joint Lead Managers and Boss Energy disclaim any duty or liability (including for
negligence) in respect of the exercise of that discretion. Furthermore, Boss Energy reserves the right to vary the timetable for the
Placement (with the consent of the Joint Lead Managers) including by closing the Placement bookbuild early or extending the
Placement bookbuild closing time (generally or for particular investors), without recourse to them or notice to any participant in
the Placement. Moreover, communications that the Placement or Placement bookbuild is "covered" (i.e. aggregate demand
indications exceed the amount of the New Shares) are not an assurance that the Placement will be fully distributed.
The Joint Lead Managers, together with their respective related bodies corporate, shareholders or affiliates and their respective
officers, directors, employees, affiliates, agents or advisers (each a “Limited Party”) have not authorised, permitted or caused the
issue, lodgement, submission, dispatch or provision of this Presentation and do not make or purport to make any statement in this
Presentation and there is no statement in this Presentation which is based on any statement by a Limited Party.
No representation or warranty, express or implied, is made by Boss Energy, its related bodies corporate, any of their respective
officers, directors, employees, agents or advisers, nor any Limited Party as to the accuracy, reliability, completeness or fairness of
the information, opinions and conclusions contained in this Presentation. In particular, the Limited Parties have not independently
verified such information and take no responsibility for any part of this Presentation or the Placement.
To the maximum extent permitted by law, Boss Energy, its related bodies corporate, their respective officers, directors, employees,
agents or advisers, and each Limited Party, expressly disclaims any and all liability, including, without limitation, any liability
arising out of fault or negligence, for any direct, indirect, consequential or contingent loss or damage arising from the use of
information contained in this Presentation. Statements made in this Presentation are made only at the date of the Presentation.
Boss Energy is under no obligation to update this Presentation. The information in this Presentation remains subject to change by
Boss Energy without notice.
The Limited Parties make no recommendations as to whether you or your related parties should participate in the Placement nor
do they make any representations or warranties to you concerning the Placement, and you represent, warrant and agree that you
Boss Energy | Australia’s Next Clean Energy Producer
3
Honeymoon and Alta Mesa Resource Tables
HONEYMOON JORC EXPLORATION TARGETS AND MINERAL RESOURCE
The information in this Presentation relating to the Enhanced Feasibility Study (“EFS”) is extracted from the
announcement entitled ‘Updated Feasibility Study identifies lower costs and increased financial returns’ dated 21st
June 2021. Boss Energy confirms that all the material assumptions underpinning the production targets, and forecast
financial information derived from the production targets, continue to apply and have not materially changed. As the
EFS utilises a portion of Inferred Mineral Resources, the ASX Listing Rules (“Listing Rules”) require a cautionary
statement to be included in this Presentation. The EFS is based on a Mineral Resources Estimate in accordance with
the JORC 2012 guidelines (ASX: 149% Increase in Measured and Indicated Resources at Honeymoon date 25
February 2019). The Company advises that the EFS uses a portion of Inferred Resources; in the first 3 years (less
than 1%), in the first 5 years (5%) and over the 11-year life of mine (19%). The Company confirms that the use of
Inferred Resources is not a determining factor to the Honeymoon Project’s economic viability. There is a low level of
geological confidence associated with Inferred Resources and there is no certainty that further exploration or
evaluation work will result in the determination of Indicated Resources or that the production targets reported in this
announcement will be realised.
The mineral resource estimate and exploration target in this Presentation were reported by the Company in
accordance with Listing Rules 5.8 and 5.7 (respectively) on 25 February 2019 and 25 March 2019, respectively. The
Company confirms it is not aware of any new information or data that materially affects the information included in
the previous announcement and that all material assumptions and technical parameters underpinning the estimates
in the previous announcement continue to apply and have not materially changed. In relation to the exploration
target, this does not include areas of the existing mineral resource and the potential quantity and grade reported are
conceptual only in nature. Insufficient exploration has been conducted to estimate a mineral resource and it is
uncertain whether future exploration will lead to the estimation of a mineral resource in the defined areas.
Tonnes (Mt)
Grade (%U3O8)
Contained U3O8
(Mlbs)
Measured
3.1
0.110
7.6
Indicated
18.4
0.063
25.5
Inferred
30.9
0.057
38.5
ALTA MESA NI 43-101 MINERAL RESOURCE ESTIMATE (2023)
For the purposes of Listing Rule 5.12, Boss Energy cautions that the mineral resources for the Alta Mesa
Project are not reported in accordance with the JORC Code. The mineral resource estimate at Alta Mesa is a
foreign estimate prepared in accordance with Canadian National Instrument 43-101. A competent person has
not done sufficient work to classify the foreign estimate as a mineral resource in accordance with the JORC
Code, and it is uncertain whether further evaluation and exploration will result in an estimate reportable
under the JORC Code. Please refer to Annexure A for additional technical information relating to the foreign
estimate.
The information in this Presentation and in Annexure A provided under Listing Rules 5.12.2 to 5.12.7 that
relates to the foreign estimate for the Alta Mesa Project is based on information compiled by Mr Jason Cherry,
and is an accurate representation of the available data and studies for the Alta Mesa Project.
Mr Cherry is a member of the Australian Institute of Geoscientists (AIG) and has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration, and to the activity being
undertaken to qualify as a Competent Person, as defined in the JORC 2012 edition of the “Australasian Code
for Reporting of Mineral Resources and Ore Reserves”. Mr Cherry has 17 years’ experience and is a full-time
employee as Geology Manager for Boss Energy Ltd. Mr Cherry consents to the inclusion in this Presentation
of the matters based on this information in the form and context in which they appear.
Resource
Category
Tonnes (‘000)
Grade (%U3O8)
Contained U3O8
(‘000 lbs)
Within existing wellfields
Measured
54
0.152
164
Alta Mesa
Indicated
1,397
0.106
2,959
Mesteña Grande
Indicated
119
0.120
287
1,570
0.109
3,410
Total Measured &
Indicated Mineral
Resources
Alta Mesa
Inferred
1,263
0.126
3,192
Mesteña Grande
Inferred
5,733
0.119
13,601
6,996
0.120
16,793¹
Total Inferred Mineral
Resource
Total
52.4
0.062
71.6¹
Note:
1.
Reported on a 100% basis.
Boss Energy | Australia’s Next Clean Energy Producer
4
SUMMARY
BOSS ENERGY
BOSS ENERGY | AUSTRALIA’S PREMIER URANIUM JURISDICTION
5
5
Alta Mesa JV and strategic relationship with enCore
Transaction Overview
• Boss Energy to purchase 30% of Alta Mesa for US$60m cash, forming an asset JV and strategic relationship with the owner, enCore Energy¹
• Alta Mesa is a high-grade uranium mine with 3.41 million pounds at 0.109% U3O8 measured and indicated and 16.97 million pounds at 0.120% U3O8 inferred N.I. 43-101
compliant resources², and significant resource growth potential
• Fully licensed 1.5Mlbpa capacity plant with simple pathway to expansion and is expected to commence production 1H 2024
• Alta Mesa has produced the third largest amount of uranium relative to all US In-Situ Recovery (“ISR”) assets, having produced 4.6Mlb³ before being placed on care and
maintenance post-Fukushima
• Post acquisition, Boss Energy expects to become a multi-mine ISR uranium producer in 1H 2024 with producing assets in South Australia and South Texas
• Both geographies are tier 1 mining and energy jurisdictions with significant historical and current ISR uranium operations
• Honeymoon remains on time and on budget, with significant exploration and expansion optionality
• Production-grade uranium generated during pre-flushing of start-up wells
• Processing ponds to be filled with Pregnant Leach Solution this year
• Study commencing for Honeymoon expansion from 2.45Mlb to 3.3Mlb
• Significant exploration success, including at Goulds’ Dam
• Strategic relationship formed between Boss Energy and enCore - combines two teams with significant global construction & operating expertise:
• Strategic Collaboration Agreement for the use and joint development of enCore’s Prompt Fission Neutron (PFN) technology
• Boss Energy to subscribe for US$10m of enCore ordinary shares at a price of US$3.90 per share and provide 200klbs of physical uranium secured loan to enCore for 12 months,
at commercial rates to be repaid in-kind or cash
• Allows Boss Energy to focus on growth at Honeymoon whilst establishing a US platform by leveraging enCore’s strong operating experience. The enCore operating team
previously ran Alta Mesa and have just successfully commissioned the Rosita ISR project re-start, in just 20 months
• Boss Energy to raise up to A$215m via a A$205m placement under its existing placement capacity and A$10m SPP, at A$3.95 per share
Boss Energy | Australia’s Next Clean Energy Producer
Notes:
1.
Refer to Annexure C for further information about enCore.
2.
Please refer to the cautionary statement and accompanying resource table in Slide 4 for further information.
3.
From enCore Corporate Presentation November 2023, https://encoreuranium.com/wp-content/uploads/2023/11/EU-Corporate-Deck-FINAL-Nov-17-23.pdf
6
Financial and Operating Highlights
AT CURRENT US$80/lb SPOT URANIUM, AUD:USD 0.65 AND RAISING PRICE OF A$3.95
Capital raising and valuation
Boss Energy’s post transaction asset portfolio
Pricing
Capital raising price
Discount to last closing price on 5 Dec 2023
Honeymoon Project
A$/sh
3.95
%
4.8
Ownership
%
100
Location
Boss Energy enterprise value at raising price
South Australia
Market cap pre raising
A$m
1,394
Equity raised
A$m
215
Pro-forma Market cap post raising
A$m
1,609
Cash post transaction
A$m
171
Initial plant capacity
Mlbpa
2.45
Value of strategic inventory
A$m
154
AISC
US$/lb
25.6
Pro-forma Enterprise value post raising
A$m
1,284
%
30
Total resource
71.6Mlb at 0.062% U3O8
Production commencement
1Q 2024
Alta Mesa Project
Use of funds (excluding A$10m SPP)
Acquisition of 30% of Alta Mesa and transaction costs
A$m
96
Ownership
Alta Mesa restart, exploration & working capital
A$m
35
Location
enCore Equity investment and spend on PFN technology
A$m
23
Honeymoon growth (expansion studies & exploration)
A$m
45
Other transaction and capital raising costs
A$m
6
Total
A$m
205
Total resource (100%) 4
South Texas
3.41 million pounds at 0.109%
U3O8 measured and indicated
and 16.97 million pounds at
0.120% U3O8 inferred N.I. 43101 compliant resources
Expected production commencement
Notes:
1.
Undiluted capital structure. Excludes options and performance rights.
2.
Cash balance as at 30 September 2023.
3.
Before transaction costs associated with the Offer.
4.
Please refer to the cautionary statement and accompanying resource table in Slide 4 for further information.
5.
ISR typically takes 2-5 years to ramp to full plant capacity.
Boss Energy | Australia’s Next Clean Energy Producer
Initial plant capacity (100%) 5
1H 2024
Mlbpa
1.5
7
TRANACTION
OVERVIEW &
RATIONALE
BOSS ENERGY
BOSS ENERGY | AUSTRALIA’S PREMIER URANIUM JURISDICTION
8
8
Platform transaction structured for alignment and a long-term partnership with enCore
Key Transaction Terms
Alta Mesa 30% JV
• Boss Energy to acquire a 30% stake in enCore’s Alta Mesa ISR project in South Texas for US$60m cash consideration
• Boss Energy and enCore to create a 30/70 incorporated JV, whereby enCore is Manager & Operator of the JV
• Each of Boss Energy and enCore to have control over their own respective share of uranium produced from Alta Mesa
PFN Technology Strategic
Collaboration Agreement
• Boss Energy and enCore have entered into a Strategic Collaboration Agreement on the use and joint development of enCore’s intellectual property over
Prompt Fission Neutron (PFN) technology for uranium exploration and production
• Exclusive licence in Australia, and non-exclusive licence outside of Australia, for use of enCore’s PFN IP
• Allows for close to real time assays for uranium that cannot be achieved using conventional coring and assay methods
• PFN tools are utilised in sandstone hosted uranium deposits, primarily in Australia (Heathgate, Honeymoon, Alligator) and USA (enCore, Uranium One)
enCore US$10m HeadCo
Investment
• Boss Energy to subscribe for US$10m in enCore fully paid ordinary shares at US$3.90 per share
Uranium Loan
• Boss Energy to loan 200klbs of its physical uranium (of 1.25Mlbs) to enCore until the earlier of 28 Feb 2025 or 12 months from utilisation
• Interest rate of 9% per annum
• Repayment of principal and interest will be in physical uranium or cash
Conditions Precedent to
Transaction
• Customary CPs to Transaction including, but not limited to:
• Successful completion of Boss Energy capital raising
• CFIUS and any other regulatory approvals
• If the Alta Mesa transaction does not complete for any reason, Boss Energy will consider alternative uses or a means of returning the proceeds received
Boss Energy | Australia’s Next Clean Energy Producer
9
Transaction consistent with Boss’ strategy
Strategic Rationale
✓
Foothold in Tier 1 US geography with exposure to a quality high grade ISR project with 3.41 million pounds at 0.109% U3O8 measured and
indicated and 16.97 million pounds at 0.120% U3O8 inferred N.I. 43-101 compliant resources and significant growth potential¹
✓
Boss Energy expects to become a multi-mine ISR uranium producer, with both Honeymoon and Alta Mesa operating in 1H 2024
✓
Boss Energy portfolio of assets are based in South Australia and South Texas, both Tier 1 mining and energy jurisdictions with significant
historical and current ISR mining operations
✓
Acquisition accelerates growth in inventory, life of mine, production rates and cashflow
✓
Maintains exposure to uranium price, with all additional pounds from Alta Mesa currently uncontracted
✓
Boss Energy remains debt free with A$154m² of strategic inventory. Expected to have multiple cash-flowing mines in 1H 2014 which may allow
for balance sheet optimisation and use of debt capacity for future growth
✓
ISR is a proven cost-effective uranium extraction process with reduced environmental imp