Production starts at Alta Mesa Uranium Project, Texas
Released
Released
Announcement PDF
ASX Release June 14, 2024
Production starts at Alta Mesa
Uranium Project, Texas
Key milestone comes just eight weeks after production started at Boss’ Honeymoon
project in South Australia; Boss on track to become a ~3Mlbs-a-year producer
Boss Energy (ASX: BOE; OTCQX: BQSSF) is pleased to advise that production has started at its 30 per centowned Alta Mesa In-Situ Recovery (“ISR”) Central Processing Uranium Plant and Wellfields (“Alta Mesa
Project”) in South Texas.
Production is forecast to ramp up to a steady-state rate of 1.5Mlbs a year, with Boss retaining sale and
marketing rights over its pro-rata share.
The Alta Mesa Project, consisting of over 200,000 acres plus the central processing plant and wellfields, is
managed by experienced uranium producer, and 70% partner, enCore Energy Corp ("enCore") (NASDAQ:
EU) (TSXV: EU).
The key milestone comes just eight weeks after the start of production at Boss’ 100 per cent-owned
Honeymoon project, where commissioning is proceeding to plan and production is forecast to ramp up to
2.45Mlbs a year.
Boss acquired its 30 per cent interest in the Alta Mesa Project in February 2024 from enCore and its wholly
owned subsidiary, enCore Energy U.S. Corp., a highly credentialed United States uranium developer and
operator, for US$60 million cash (see ASX release dated February 27, 2024).
Boss Managing Director Duncan Craib said: “The start of production at the Alta Mesa Project is another
key milestone in the implementation of our strategy to be a global uranium supplier with a diversified
production base in tier-one locations.
“With operations now ramping up at both Honeymoon and Alta Mesa, we are on track to hit our combined
nameplate production target of 3Mlbs of uranium per annum.
“Our timing could hardly be better given the increasingly tight supply and demand fundamentals in the
uranium market.
“This highly favourable outlook was underpinned by US President Joe Biden’s recent signing of legislation
to ban the importation of uranium products from Russia.
“This was a game-changing event for the uranium market and in particular for uranium projects in North
America and Australia.
“Given that we are ramping up production in both locations and we have strong growth prospects at each
one, Boss is very well positioned to continue capitalising on this huge opportunity”.
Please refer to enCore’s announcement dated June 13, 2024 for further information.1
1 enCore Energy Corp. announcement titled ‘enCore Energy Commences Uranium Production at its Second South Texas Project’ dated June 13, 2024
https://www.sedarplus.ca/csa-party/records/document.html?id=b5b37208e04209072f3a850b53c88385cc67adc9220730b1094ad5024299b241
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Duncan Craib - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Paul Armstrong – Public Relations
+61 (08) 9388 1474
www.bossenergy.com
@Boss_Energy
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Duncan Craib
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
About Boss Energy Limited
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) (Boss Energy or the Company), is ramping up uranium
production at its Honeymoon Uranium Project in South Australia. Annual production at Honeymoon is
forecast to reach 2.45Mlbs of U3O8. Boss also owns 30 per cent of the Alta Mesa Project in Texas, USA.
Production at the Alta Mesa Project is ramping up to 1.5Mlbs of U3O8 a year. For more information please
visit www.bossenergy.com
Forward-Looking Statements
This announcement includes forward-looking statements. These forward-looking statements are based
on the Company’s expectations and beliefs concerning future events. Forward-looking statements are
necessarily subject to risks, uncertainties, and other factors, many of which are outside the control of Boss
Energy, which could cause actual results to differ materially from such statements. Boss Energy makes no
undertaking to subsequently update or revise the forward-looking statements made in this
announcement, to reflect the circumstances or events after the date of this announcement.
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
@Boss_Energy
Share your feedback
Discover