June 2026 Quarterly Results Presentation
Released
Released
Announcement PDF
ASX: BOE | OTCQX: BQSSF
bossenergy.com
June 2026
Quarterly Results Presentation
Strong finish to FY26 with FY26 production & cost guidance
achieved
A global multi-mine Uranium producer
30 July 2026
Boss Energy | A global multi-mine Uranium producer 2
FY26 Production Guidance1
362Klbs
Q4 production of U₃O₈
Δ 79%
vs Q3 FY26
1.41Mlbs
FY26 production of U₃O₈
Δ 65%
vs FY25
FY26 Cost Guidance1
C1 A$39/lb
FY26 Result
AISC A$61/lb
FY26 Result
Financial Position
$207.3M
Cash & liquids assets
With no debt
C1 A$45/lb
Q4FY26 Result
AISC A$70/lb
Q4FY26 Result
Financial position
• Cashflow positive for FY26 with
cash increasing by $13.1M during a
capital-intensive year
• Remained disciplined on capital
• Inventory grown to 1.581Mlbs
U3O8
Growth pipeline
• Feasibility Study Updated study
targeted for end of August 2026
• Satellite deposits Gould’s Dam &
Jasons Deposit advancing with
ability to utilise existing
infrastructure
Infrastructure
• Commissioned NIMCIX Columns 4
& 5 and East Kalkaroo Trunkline
• Six wellfields Producing and
online, driving record flow
Corporate & Board
• Board Peter Botten appointed new
Chair
• Governance Board strengthened
for the next growth phase
Notes (1): FY26 Cost Guidance was revised lower during the year following positive results from continuous cost reduction programs. FY26 Production Guidance was revised lower during the year following heavy
rainfall in March 2026. See announcement dated 28 January 2026 titled “Q2 December FY26 Quarterly Report” and announcement dated 15 April 2026 titled “Honeymoon Update FY26 Production” for details.
Q4 and FY26 Highlights
A strong finish to FY26 with delivery of revised guidance and positive free cash flow
Boss Energy | A global multi-mine Uranium producer 3
0
50
100
150
200
250
300
350
400
450
500
Q4FY25 Q1FY26 Q2FY26 Q3FY26 Q4FY26
klbs
IX Production U3O8 Drummed
Heavy rainfall
during Q3 causing
reduced production
guidance
Strong
recovery in Q4
+79% vs Q3
FY26 Revised production guidance achieved
1.41MLbs U₃O₈ +65% vs FY25
Key infrastructure commissioned and operating:
• Commissioned NIMCIX columns 4 & 5 to bring total to 5 operating NIMCIX
columns.
• Capital decision on NIMCIX column 6 expected.
Q1 FY27
• Expect similar decline in average tenor, as was recorded from Q3FY26 to
Q4FY26, with total flow to be consistent with Q4FY26.
Honeymoon Quarterly production – U₃O₈ (kLbs)
Production recovery in Q4 and delivery of FY26 guidance:
• Strong recovery in production for Q4 +79% vs Q3.
• Delivered FY26 production guidance – revised due to heavy rainfall in Q3.
Honeymoon Operation
Commissioned substantial supporting infrastructure to support record flow
Record quarterly flow:
• 3.5M cubic metres - up 83% vs Q3.
• Enabled by additional infrastructure.
Boss Energy | A global multi-mine Uranium producer 4
Commissioned wellfields and supporting infrastructure
• Wellfield B6 began producing in line with expectations.
• East Kalkaroo Trunkline commissioned.
New wellfields are being planned and are under construction
• First full wellfields utilising the wide-spaced wellfield design.
• EKT1 commences flushing in August 2026 with leaching in Q2FY27.
• EKT2 commences flushing in Q3FY27 and leaching in Q4FY27.
• Production well drilling has now been accelerated following increased
confidence in wide-spaced wellfield design.
Wellfield activities across Honeymoon
Honeymoon Wellfields
Continue to plan and construct new wellfields to support future production
Existing wellfields continue to produce
• All five Honeymoon (B1-B5) wellfields continue to produce in line with
FY26 plan.
• Only recently required more proactive wellfield operations on older
wellfields demonstrating strong flow.
Boss Energy | A global multi-mine Uranium producer 5
0
20
40
60
80
100
120
140
Q1FY26 Q2FY26 Q3FY26 Q4FY26
A$
AISC Realised price
Honeymoon Quarterly AISC and Realised price (A$/lb) Significant investment in sunk capital
• A capital-intensive year following completion in NIMCIX columns
4 & 5 and East Kalkaroo trunkline.
Operating cashflow positive
• All in sustaining margin of $37/lb, based on Q4 average realised
price and AISC.
Remain disciplined on capital
• Delivered within total capital expenditure guidance ($66M).
• Have continued investment in wide-spaced wellfields as the optimal
pathway forward.
FY26 Key Metric (AUD) Unit Q4 Q3
Full Year
Actual
Guidance
Revised2
Guidance
Initial
C1 Cash Cost $/lb 45 60 39 36-40 41-45
All In Sustaining Cost (AISC) $/lb 70 93 61 60-64 64-70
Capital expenditure
Sustaining $M 7 5 24 30-33 29-32
Project and Supporting Infra. $M 14 8 42 30-33 27-30
Total Capital Expenditure $M 21 13 66 30-66 56-62
Notes: (1) AUD/USD Q4: 0.6869 Q3: 0.6845. (2) Updated Guidance, see annoncement dated 28 January 2026 titled
“Q2 December FY26 Quarterly Report”
Cost Performance
Met FY26 revised cost guidance
Cost in line with revised cost guidance:
• Delivered revised cost guidance (revised lower in January following
successful implementation of cost reduction programs).
• High end of C1 and AISC range given weather impacts in Q3 FY26, as
previously advised.
Boss Energy | A global multi-mine Uranium producer 6
Sales and Financial Position
Strengthened financial position with cash and inventory growth
Sales and Inventory Units Q4 FY26 Q3 FY26 FY26
Sales and loan repayments US$000’s 24,421 23,906 111,541
Sales and loan repayments A$000’s 34,809 34,447 166,554
Average realised price US$/lb 75.1 73.6 74.4
Average realised price A$/lb 107.1 106.0 111.0
Sales lbs 000’s 325 325 1,400
Loan repayment lbs 000’s - - 100
Inventory on hand lbs 000’s 1,581 1,530 1,581
Cashflow Positive
• Boss was cashflow positive as a whole in FY26, consistent with FY26
guidance.
• Cash increased by $13.1M, during a capital-intensive year.
Strong Balance Sheet
• Balance sheet remains strong during a year of transition, with $207M in
cash and liquid assets, and no debt, supporting organic funding of
ongoing transition to a wide-spaced design.
Grown strategic inventory
• Inventory on hand of 1.581Mlbs with a market value of ~A$190M.1
• Accumulated 172klbs U3O8 drummed.
Continue to remain strategically under-contracted
• Recorded $34.8M (US$24.4M) of sales for 325klbs at an average realised
price of $107.1/lb (US$75.1/lb).
• Q1FY27 realised price expected to be US$80-82/lb.
106 110 113 116
48 53 38 50
54 45 49 41
5 0 11 0
212 208 211 207
0
50
100
150
200
Q1FY26 Q2FY26 Q3FY26 Q4FY26
Inventory on hand Cash on hand
Investments and other liquid assets Trade receivable
$M
Notes (1): Based on uranium price of US$85/lb and AUD/USD 0.70
Cash and liquid assets ($M)
Boss Energy | A global multi-mine Uranium producer 7
Quarterly and FY26 Cashflow bridge
Cashflow positive for FY26 during a capital-intensive year
FY26
Cashflow
Q4
Cashflow
• Positive operating cashflow in Q4FY26 demonstrates
strength in wellfield economics.
• Remained disciplined on wellfield development.
• +$13.1M Cash increase in FY26.
• Positive result given challenges faced and transition
commenced during the year.
• +$11.6M Cash increase in Q4FY26 with continued
investment in project and supporting infrastructure.
• Substantial investment ($33.3M) in project and
supporting infrastructure to support future production.
• NIMCIX column 6 investment put on hold until greater
certainty gained.
Boss Energy | A global multi-mine Uranium producer 8
Alta Mesa JV Production Results
Production increase relies on permitting
• Drummed production of 45 klbs of U3O8 compared to the previous
quarter's drummed production of 97 klbs of U3O8 (on a 100% basis).
• Boss received 13 klbs of drummed production reflecting its 30% pro rata
share of shipped production, a 22 klbs decrease from the prior quarter of
35 klbs of U3O8.
• The decline in production is attributed to permitting delays at the state
level (Texas Commission on Environmental Quality), resulting in
production delays.
• Continue to work with enCore, as manager of the Alta Mesa JV, to
improve production performance.
0
50,000
100,000
150,000
200,000
250,000
Q4FY25 Q1FY26 Q2FY26 Q3FY26 Q4FY26
Drummed (lbs)
Alta Mesa Quarterly production (100%) – U₃O₈ (kLbs)
Boss Energy | A global multi-mine Uranium producer 9
Status of New Feasibility Study
Proceeding directly to feasibility-level outcome ahead of schedule
Key Takeaway: Increasing confidence that wide-spaced wellfield design can improve project economics
Feasibility priorities for Honeymoon
• Bring in low-grade mineralisation into the wellfield design.
• Fundamentally shift cost structure to ensure solid margins on lower-grade material.
Changes
• Proceeding directly to a feasibility-level outcome, rather than producing two study documents
within a short period, as previously proposed.
Timing
• New Feasibility Report (including updated Life-of-Mine Plan and updated JORC Mineral Resource
Estimate) targeted for release end of August 2026 (originally end of September 2026).
Progress
• Completed delineation drilling and continued reactive transport simulations based on actual
operating data.
• Comprehensive technical work program since Q4 2025 has significantly expanded the operational
dataset of Honeymoon and provided higher confidence in the resource’s future.
• Working through potential ramp up profile.
Outcomes
• Increased confidence that the wide-spaced wellfield design:
• Builds upon existing operational viability.
• Has the potential to improve project economics as operations expand to the lower-grade
areas of the Honeymoon resource.
Boss Energy | A global multi-mine Uranium producer 10
Gould’s Dam and Jasons Deposit
45Mlbs contained U3O8
1 - Accelerated development and permitting of satellite deposits
Findings from Honeymoon New Feasibility Study improve prospects for satellite deposits
Next Steps
• Continue permitting for both satellite deposits (Ecological,
Groundwater and Radiological baseline data collection, modelling
and assessment).
• Initiate delineation drilling at Jasons Deposit with an aim to convert
unclassified to Inferred to inform wellfield design and project
description for permitting.
Resource
Category1
Ore Grade Metal
Mt Ppm U₃O₈ Mlbs U3O8
GOULD’S DAM
Indicated 7.5 465 7.7
Inferred 31.2 369 25.4
Total 38.7 388 33.1
JASONS DEPOSIT
Indicated 4.8 464 4.9
Inferred 8.5 380 7.1
Total 13.3 410 12.0
Note (1) Refer to ASX announcement dated 19 March 2026 titled “Gould’s Dam and Jason’s Deposit Mineral Resource and Permitting Update” for detail. The company confirms that it is not aware of any new
information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the Mineral Resource Estimates in
the original market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s finding are presented have not been
materially modified from the original market announcement.
Boss Energy | A global multi-mine Uranium producer 11
Summary
Established a strong operating platform in a raising market
Grew inventory by
172klbs and cash by
$13.1M in FY26 despite
being a capital-intensive
year
Continued to strengthen
balance sheet with cash
and liquid assets of
$207.3, including total
inventory of 1,581klbs
Delivered FY26 revised
production and cost
guidance of 1.41Mlbs
with C1 Cost of $39/lb
and AISC of $61/lb
Continue to accelerate
Gould’s and Jasons for
further growth
Commenced transition to
wide-spaced wellfield
design based on
operating data
12
Boss Energy | A global multi-mine Uranium producer
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (Boss Energy or
Company).
NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the
recipient’s investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent assessment and
investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should not rely on any statement or the
adequacy and accuracy of any information. This Presentation is in summary form and does not purpose to be exhaustive. This Presentation should
be read in conjunction with Boss Energy’s periodic and continuous disclosure announcements lodged with the Australian Securities Exchange,
which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of
the Information. Boss Energy and its directors, employees, agents and consultants shall have no liability (including liability to any
person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or
implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute that
can not be excluded.
EFFECT OF ROUNDING
All dollar amounts are in Australian dollars unless otherwise indicated. A number of figures, amounts, percentages, estimates, calculations of
value and fractions in this Presentation are subject to the effect of rounding. Accordingly, the actual calculation of these figures may differ from
the figures set out in this Presentation.
PAST PERFORMANCE
Past performance information, including past share price performance of Boss and past Honeymoon Project information, given in this
announcement is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss’s (or anyone else’s) views
on Boss’s future activities, guidance or financial performance or condition. Past performance of Boss cannot be relied upon as an indicator of (and
provides no guidance as to) the future performance of Boss.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy.
FORWARD LOOKING STATEMENTS
This announcement contains certain forward-looking statements provided by or on behalf of Boss with respect to potential future matters.
Forward-looking information may include, without limitation, statements regarding plans, strategies and objectives of Boss, production and
financial guidance, financial forecasts, estimates of project milestones and timing and expected costs or production outputs. In some cases,
forward-looking information can be identified by terms such as “may”, “will”, “should”, “expect”, “plan”, “anticipate”, “believe”, “intend”,
“estimate”, “predict”, “potential”, “continue” or other similar expressions concerning matters that are not historical facts. Guidance as to
production, unit costs and capital expenditure is based on assumptions, budgets and estimates existing at the time of assessment which may
change over time impacting the accuracy of those estimates. These estimates are developed in the context of an uncertain operating environment
including in respect of inflationary macroeconomic conditions, and uncertainties surrounding the risks associated with mining and the further
review of the EFS which may impact production and have a flow on effect on sales. Actual results may therefore vary significantly depending on
these risks and the timing required to address them. All information is provided as an indicative guide to assist sophisticated investors with
modelling of the Company. It should not be relied upon as a predictor of future performance.
Forward-looking statements reflect Boss’s expectations at the date of this announcement, however they are not guarantees or predictions of
future performance or statements of fact. Forward-looking information involves known and unknown risks, uncertainties and other factors (many
of which are beyond the control of Boss and its directors and management) which may cause the actual results, performance or achievements of
Boss and its business to be materially different from any future results, performance or achievements expressed or implied by the forward-looking
information. Accordingly, undue reliance should not be placed on forward-looking information.
The forward-looking statements in this announcement reflect various assumptions by or on behalf of Boss (which assumptions may prove to be
inaccurate). Accordingly, this is another reason why such statements are subject to significant business, technical, legal, economic and competitive
and other uncertainties and contingencies and other factors which may be beyond the control of Boss which could cause actual results or trends
to differ materially from the forward-looking statements in this announcement, including but not limited to differences or inaccuracies arising
from price and currency fluctuations, geotechnical factors, geological and mining factors, estimated continuity of mineralised horizons,
metallurgical and processing factors, sales factors, drilling and production results, development progress, operating results, mineral resource
estimates, legal issues, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries, approvals
and cost estimates, environmental risks, ability to meet funding requirements, share price volatility, uranium markets and other matters.
Accordingly, there can be no assurance that such forward-looking statements and projections will be realised.
Boss makes no representations as to the accuracy or completeness of any forward-looking statements or projections or that any forecasts will be
achieved. Additionally Boss makes no representation or warranty, express or implied, in relation to, and (to the maximum extent permitted by
law) no responsibility or liability (whether for negligence, under statute or otherwise) is or will be accepted by Boss or by any of its officers,
directors, shareholders, partners, employees, or advisers as to or in relation to the accuracy or completeness of the information, statements,
opinions or matters (express or implied) arising out of, contained in or derived from this announcement or any omission from this announcement.
Boss does not undertake or accept any obligation or undertaking to release publicly any updates or revisions to any forward-looking statements to
reflect any change in Boss’s expectations or any change in events, conditions or circumstances on which any such statement is based, except as
required by law.
Mineral Resource estimates are necessarily imprecise and depend on interpretations and geological assumptions, minerals prices, cost
assumptions and statistical inferences (and assumptions concerning other factors, including mining, processing, metallurgical, infrastructure,
economic, marketing, legal, environmental, social and governmental factors) which may ultimately prove to be incorrect or unreliable. Mineral
Resource estimates are regularly revised based on actual exploration or production experience or new information and could therefore be subject
to change. In addition, there are risks associated with such estimates, including (among other risks) that minerals mined may be of a different
grade or tonnage from those in the estimates and the ability to economically extract and process the minerals may become compromised or not
eventuate. Accordingly, this is another reason why no assurances can be given of whether the production guidance, financial forecasts or other
forecasts or other forward-looking statements or information in this announcement will be achieved.
Contact Information
+61 (8) 6263 4494
boss@bossenergy.com
ASX: BOE | OTCQX: BQSSF
June 2026 Quarterly Results
Share your feedback
Discover