September Quarterly Report
Record drummed production puts Boss on
track to meet FY26 Guidance
Strongest quarter of drummed production with costs below guidance and robust cash
margins generating strong free cashflow
Highlights
Honeymoon Uranium Project, South Australia (Boss 100%)
• Record quarterly drummed production of 385,910 lbs of U3O8 drummed (up 11% from June
quarter).
• Average realised price of $114.3/lb (US$74.7/lb) with sales and loan repayments of $57.1
million (US$37.3 million).
• C1 cost from drummed U3O8 of $34/lb (US$22/lb), below FY2026 guidance of $41-45/lb
(US$27-29/lb) and AISC of $50/lb (US$33/lb) below guidance of $64-70/lb (US$41-45/lb).
• NIMCIX column 4 commissioning commenced and columns 5 and 6 continue to be progressed.
• Wellfield 4 brought online, and the wellhouse for wellfield 5 delivered to site for installation.
• Construction of East Kalkaroo trunkline commenced with completion targeted in March
quarter, 2026.
Alta Mesa Uranium Operation, South Texas (Boss 30%)
• Drummed production of 206,231 lbs of U3O8 (100% basis). Boss received 45,102 lbs of U3O8,
reflecting its 30% pro rata share of shipped production.
• Additional roll front uranium mineralisation was discovered at Alta Mesa; Highly prospective
Alta Mesa East Property acquired.
Corporate
• Robust Balance Sheet with $212.4 million of cash and liquid assets on hand; zero debt.
• Drummed inventory on hand of 1.44M lbs U3O8.
• Highly experienced mining executive, Matthew Dusci, appointed Managing Director and Chief
Executive Officer, effective from 1 October 2025.
• Commenced program of work to accelerate the permitting of Brooks Dam North, Jason’s
Deposit and Gould’s Dam.
• Honeymoon Review a priority and on track for completion in December quarter, 2025.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 2
Boss’ September quarterly conference call will be held today at 8am AWST (11am AEDT). The call can
be accessed at https://loghic.eventsair.com/215514/162134/Site/Register
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) (“Boss” or the “Company”) is pleased to report on a strong
September quarter with production and cost in line with or better than annual guidance. The quarter
generated robust free cashflow.
Boss Managing Director Matthew Dusci said:
“This was another strong quarter from the Honeymoon Operation with record production of 385,910lbs of
U3O8 at a C1 cash cost of $34/lbs. Our construction and production results are proceeding to our FY26 plan
as we bring wellfields and the IX columns online. As a result, we are well on track to meet FY26 guidance of
1.6Mlbs.
“Cash margins were strong, with sales and loan repayments of 500,000lbs U3O8 at a realised price of
US$74.7/lb generating an additional $11.2 million in net cash. The Company is in a strong financial position
with cash of $47.8M and combined liquid assets, including cash, of $212.4M. This includes 1.44M lbs of
drummed U3O8 held as inventory.
“Significant progress was made in the quarter on advancing a number of work programs, including the
commencement of a significant resource delineation drilling program at Honeymoon to improve our
understanding of the resource. We have also established a team to conduct the permitting and technical
studies for the satellite deposits of Gould’s Dam and Jason’s Deposit.
“Delivery of the Honeymoon Review, which will compare the continuity of mineralisation and leachability
results with the assumptions in the Enhanced Feasibility Study, is a priority. The review is on track for
completion in the December quarter”.
Honeymoon Safety Performance
The Total Reportable Injury Frequency Rate (TRIFR1
) increased to 20.7 during the quarter due to two Lost
Time Incidents (LTIs) during the quarter. While the TRIFR is high, it reflects a small number of low-severity
incidents, which have a large impact on TRIFR given the low number of hours worked. Ensuring team
members' safety is a priority at Boss. Several initiatives are underway to reduce injuries by improving hazard
and safety reporting, systems and processes.
Table 1: Honeymoon TRIFR (12-month moving average)
Quarter ended Q1 FY26 Q4 FY25
TRIFR 20.7 12.8
Honeymoon Production Results
Production continued to ramp up during the quarter, with 385,910 lbs U3O8 drummed and 376,025 lbs IX
produced. This represents a growth of 36,722 lbs (11%) in U3O8 drummed and a decline of 20,321 lbs (5%) in
IX production compared to the previous quarter. The decline in IX production was due to closing last quarter
with significant inventory in the circuit. The PLS to IX U3O8 tenor during the quarter was 81 mg/l compared
to the prior quarter of 88 mg/l.
1 Total Reportable Injury Frequency Rate (TRIFR) measures the rate of restricted work injuries (RWIs), medical treated injuries (MTI)
and lost time injuries (LTIs) that occur per million hours worked.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 3
Table 2: Operational physicals
Quarter ended Unit Q1 FY26 Q4 FY25
Wellfields online 4 3
NIMCIX Columns online 3 3
IX Flow (total)1
(m3
) 2,166,348 2,102,310
PLS to IX tenor2
(U3O8 mg/l) 81 88
IX Recovery (%) 97.8 96.9
IX Production (total)1
(lbs) 376,025 396,346
U3O8 Drummed (total) (lbs) 385,910 349,188
Notes: (1) Conversions: There are 1,000 litres per m3
and 0.00000220462 lbs per mg. (2) Tenors currently being
extracted exceed the average tenors forecast in the Enhanced Feasibility Study and should not be extrapolated across
the life of mine.
Honeymoon Construction Activities
Construction activities for the completion of NIMCIX columns 4-6 continue. During the quarter structural
steel work was completed for columns 4-6. Piping and installation of mechanical equipment for columns 4-
5 were finalised. Column 4 successfully completed hydro testing and will be brought online in the December
quarter. Columns 5 and 6 are expected to be completed by the March quarter, 2026.
Wellfield construction continued with wellfield 4 brought online in August, ongoing construction of the East
Kalkaroo trunkline (expected completion March quarter, 2026) and the arrival on site of the wellhouse for
installation at wellfield 5, which is the first wellhouse to be constructed offsite.
Exploration Activities
Exploration in the quarter involved the collection of passive seismic data at Honeymoon and passive seismic
and gravity data at the Company’s Kinloch project. Passive seismic data acquisition is fast and low-cost and
facilitates subsurface mapping of key geological surfaces.
Analytical data for aircore samples from the Lake Constance prospect were received during the quarter. The
data demonstrates that radioactive anomalies encountered in reconnaissance drilling during the last quarter
were due to thorium rather than uranium, substantially downgrading this prospect.
Hyperspectral imagery from the Devil’s Elbow project (JV with Eclipse Metals)2
in the Northern Territory was
reprocessed and is being analysed to generate targets for field inspection, planned (subject to Northern Land
Council approval) for the next quarter.
Satellite Deposits
A program of work has commenced to accelerate the permitting of Brooks Dam North as the northern
extension of the Honeymoon orebody, along with the satellite deposits of Jason’s Deposit and Gould’s Dam.
In order to bring these satellite deposits into operation, there are three main regulatory approvals required,
specifically a Mining Lease, Environment Protection and Biodiversity Conservation (EPBC) approval and the
development and approval of the Program for Environment Protection and Rehabilitation (PEPR) at each of
the sites.
To support the approval process, baseline studies, assessments and engineering studies, at a Pre-Feasibility
stage (PFS), have commenced for each of the deposits.
2 See the Company’s announcements dated 10 March 2025 (“Boss takes option over uranium exploration project in the NT”)
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 4
Balance Sheet
Boss finished the quarter in a strong financial position with no debt and $212.4 million of liquid assets (being
cash, liquid investments, trade receivables and physical drummed uranium), a decrease of $11.9 million from
the June quarter, primarily due to:
• Increased cash of $11.2 million due to the sale of 400K lbs ($36.5 million) and receipt of
repayment of the enCore loan ($15.5 million), partially offset by Honeymoon operating and
capital costs ($28.2 million) and other cash outflows ($12.6 million). See the cashflow waterfall
below for details.
• A reduction in the weighted average cost of inventory ($14.5 million) from $85/lb (US$56/lb) to
$74/lb (US$49/lb), reflecting a higher weighting of Honeymoon inventory which has a lower cost
as compared to the attributed cost for previously purchased inventory.
• An increase in trade receivables ($5.1 million) relating to a sale that was recorded during the
quarter and cash received on 1 October 2025.
• A reduction in the loan receivable from enCore ($15.8 million) due to repayment of the loan.
Table 3: Cash, inventory and investments
A$000’s Q1 FY26 Q4 FY25
Cash on hand 47,767 36,531
Investments and other liquid assets 53,700 51,637
Inventory on hand1
105,839 120,347
Trade receivable 5,112 -
Loan receivable - 15,819
Total cash and liquid assets 212,418 224,334
Notes: (1) Inventory on hand reflects drummed U3O8.
The waterfall chart below highlights the September quarter movements in cash.
Figure 1: September Q1 FY26 Cash (A$000’s)
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 5
Sales and Loans
During the quarter, Boss recorded $57.1 million (US$37.3 million) for sales of 400K lbs and the repayment of
100K lbs loan receivable from enCore at an average realised price of $114.3 (US$74.7/lb).
Table 4: Sales and Loans
Key Metric Unit Q1 FY26 Q4 FY25
Sales lbs 400,000 100,000
Loan repayment lbs 100,000 -
Sales and loan repayments1
US$000’s 37,329 7,115
Sales and loan repayments1
A$000’s 57,133 10,863
Average realised price2
US$/lb 74.7 71.2
Average realised price2
A$ 114.3 108.6
Inventory on hand3
Mlbs 1.44 1.41
Notes: (1) Sales and loan repayments include a sale recorded during the quarter and cash received on 1 October (2)
Average realised price includes inventory loan repaid (3) Inventory on hand excludes 100K lbs inventory loaned and now
fully repaid.
Sales and loan repayments increased during the quarter, reflecting a catch-up following a recovery in market
prices and repayment of the remainder of the loan to enCore.
Inventory increased during the quarter from 1.41M lbs to 1.44M lbs due to production from Honeymoon
(386K lbs) and inventory received from Alta Mesa (45K lbs) offset by sales of 400K lbs.
Boss expects that sales and cash receipts for the remainder of FY2026 will remain approximately in line with
Honeymoon production for each quarter, subject to market prices reflecting the fundamental long-term
value.
Honeymoon Costs
Boss is tracking favourably against C1 Cash Cost and All In Sustaining Cost FY2026 Guidance. Initial results
from the optimised lixiviant have been positive with increased tenors being recorded. There have also been
some additional savings which are considered a timing or one-off variance. Whilst it is too early to estimate
the full impact of the initial positive results of the optimised lixiviant compared to FY2026 guidance, Boss will
continue to focus on opportunities to reduce costs and will provide an update in the December 2025
quarterly.
Table 5: Production and Capital Costs
Key Metric Unit
Q1 FY26 Q4 FY25 Full Year Guidance
(FY2026)
C1 Cash Cost $/lb 34 36 41-45
All In Sustaining Cost (AISC) $/lb 50 n/d1
64-70
Capital expenditure
Sustaining $M 6 n/d1
29-32
Project and Supporting Infrastructure $M 9 n/d1
27-30
Total Capital Expenditure $M 15 14 56-62
Notes: (1) n/d: not disclosed. Classification of capital expenditure has changed from 2HFY2025 to FY2026 Guidance.
Refer to the Company’s announcement on 28 July 2025 titled “June 2025 Quarterly Results Presentation” and on
29 January 2025 titled “December 2024 Quarterly Results Presentation” for definitions of each classification.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 6
Cash cost for the quarter of $34/lb (US$22/lb) was below the guidance range of $41-45/lb (US$27-29/lb) and
Q4 FY2025 of $36/lb (US$23/lb) primarily attributed to timing factors such as higher tenor at the start of the
year due to new wellfields coming online and operational constraints which reduced the amount of water
treated. The lower cash cost is also partly attributed to positive initial results from the optimisation of reagent
consumption in the wellfields and processing plant. This work stream on continued reagent optimisation,
along with other cost reduction initiatives, will continue in the coming quarter.
Similarly, AISC of $50/lb (US$33/lb) was below the guidance range of $64-70/lb (US$41-45/lb) based on lower
Cash Costs and the phasing of wellfields spend.
Project and Supporting Infrastructure spend is expected to reduce in the second half of FY2026 following
completion of the NIMCIX columns.
Honeymoon Review Update
Boss has prioritised the Honeymoon Review, which was initiated in late July 2025,3
and aims to complete the
review in the December quarter, 2025.
The primary purpose of the review is to determine the potential for reduced continuity of mineralisation and
leachability compared with the assumptions contained in the Company’s Enhanced Feasibility Study (EFS)
dated 21 June 2021 and to assess any impact that may have on the Company’s ability to achieve the
production nameplate specified in the EFS. Boss is currently progressing multiple workstreams in parallel,
including:
• A review of input assumptions, data, resource domaining, estimation methodology and
mineralisation continuity for Honeymoon and Jason’s Deposit and Gould’s Dam.
• Wellfield design and planning assumptions, including leachability parameters and optimisation,
at Honeymoon, Jason’s Deposit and Gould’s Dam.
• A delineation drilling program which aims to cover the entire Honeymoon domain from Far East
Kalkaroo to Brooks Dam North. The program assumes an initial spacing of 35m x 35m with
approximately 390 holes for 49,200m. Spacing may be refined as results are interpreted. The
program commenced in mid-September with the mobilisation of one drill rig and a second drill
rig is planned to commence at the end of November 2025.
Following the conclusion of the Honeymoon Review, the delineation drilling program will continue and data
will be incorporated into a refined resource estimate and future wellfield design. This program of work for
Honeymoon is likely to extend into the June quarter, 2026.
Alta Mesa Joint Venture (Boss 30% / enCore Energy Corp 70%)
Drummed production the quarter from the Alta Mesa Uranium Project, a Joint Venture with enCore Energy
Corp (NASDAQ: EU; TSXV: EU) (enCore), totalled 206,231 lbs of U3O8 compared to the previous quarter's
drummed production of 179,536 lbs of U3O8 (on a 100% basis).4
Boss received 45,102 lbs of U3O8 reflecting
its 30% pro rata share of shipped production, an increase from the prior quarter of 43,846 lbs of U3O8.
Recent Alta Mesa Project operational highlights include:
• Acquisition of a 5,900-acre parcel of private land located immediately next to the Alta Mesa
wellfields and Central Processing Plant (Alta Mesa East Property, which was previously called
3 See the Company’s announcements dated 28 July 2025 (“Honeymoon FY26 Guidance” and “June 2025 Quarterly Results
Presentation”) and 5 August 2025 (“Response to ASX Aware Query”) and 11 September 2025 titled “Honeymoon Review Update” for
further details.
4
Alta Mesa JV previously reported production on a Uranium Extracted basis. From this quarter onwards, Alta Mesa JV will report
production on a drummed U3O8 basis which is consistent with Boss’ reporting of production results for Honeymoon.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 7
the Tacubaya). Roll-front mineralisation is believed to extend from the Alta Mesa Project onto
the Alta Mesa East Property. Drilling is scheduled to commence this coming quarter.
• Additional roll front uranium mineralisation has been discovered, as a result of a major ongoing
re-analysis of historic drill holes, at the Alta Mesa. This re-analysis of previous drill data is
expected to continue until the end of the year, with follow-up delineation drilling continuing
into 2026. Permitting has commenced to bring this mineralisation into the production profile.
Corporate
Matthew Dusci was appointed as Managing Director and Chief Executive Officer, effective from 1 October
2025. Mr Dusci is an accomplished mining executive with over 25 years of experience in all facets of the
mining industry, including technical studies, project development, operations, strategy and leadership. Mr
Dusci joined Boss Energy in September 2024 as Chief Operating Officer.
For the past 10 years, prior to joining Boss Energy, Matt held several executive positions at IGO Limited. These
included Acting CEO, Chief Operating Officer and Chief Growth Officer. He played a major role in the growth,
development and transformation of IGO. He has also held senior management roles within PMI Gold, Gold
Fields, and WMC Resources.
Duncan Craib stepped down as Managing Director and CEO at the end of the Quarter, after nearly 9 years of
service. Mr Craib has played a pivotal role in transforming Boss Energy into Australia’s newest uranium
producer and leaves a legacy of disciplined execution and market leadership. Mr Craib continues to support
the Company on a limited basis under a consultancy agreement on market terms through to 1 January 2026,
at which point he will join the Board as a Non-Executive Director.
Boss has also continued to strengthen the technical capabilities of the management team with key
appointments across the processing plant and wellfields.
September FY2026 Quarterly Results Conference Call – 29 October 2025
Boss will hold a conference call today, Wednesday 29 October 2025, at 8am AWST (11am AEDT) with
Managing Director Matt Dusci and Chief Financial Officer Justin Laird, to discuss the results. To listen in live,
please click on the link below and register your details.
https://loghic.eventsair.com/215514/162134/Site/Register
Appendix 5B disclosures
In line with its obligations under ASX Listing Rule 5.3.5, Boss notes that the only payments to related parties
of the Company, as disclosed in the Appendix 5B (Quarterly Cashflow Report) for the period ended 30
September 2025, consist of executive director and chief financial officer salaries and wages (including
superannuation) and payment of non-executive director fees.
During the quarter ended 30 September 2025, the Company spent approximately $17.7M on project and
exploration activities relating to its Honeymoon and Alta Mesa Projects. These activities included:
• Technical studies costs
• Construction equipment
• Wellfield drilling and development costs
• Engineering and construction expenses
• Mineral exploration and evaluation costs
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 8
In addition to these activities the Company continued to incur costs relating to the ongoing maintenance
activities required at Honeymoon. The expenditure represents direct costs associated with these activities as
well as capitalised wages which can be directly attributable to Honeymoon.
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Matt Dusci
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
Forward-Looking Statements
This announcement contains certain forward-looking statements provided by or on behalf of Boss with
respect to potential future matters. Forward-looking information may include, without limitation, statements
regarding plans, strategies and objectives of Boss, production and financial guidance, financial forecasts,
estimates of project milestones and timing and expected costs or production outputs. In some cases,
forward-looking information can be identified by terms such as “may”, “will”, “should”, “expect”, “plan”,
“anticipate”, “believe”, “intend”, “estimate”, “predict”, “potential”, “continue” or other similar expressions
concerning matters that are not historical facts. Guidance as to production, unit costs and capital expenditure
is based on assumptions, budgets and estimates existing at the time of assessment which may change over
time impacting the accuracy of those estimates. These estimates are developed in the context of an uncertain
operating environment including in respect of inflationary macroeconomic conditions, and uncertainties
surrounding the risks associated with mining and the further review of the EFS which may impact production
and have a flow on effect on sales. Actual results may therefore vary significantly depending on these risks
and the timing required to address them. All information is provided as an indicative guide to assist
sophisticated investors with modelling of the Company. It should not be relied upon as a predictor of future
performance.
Forward-looking statements reflect Boss’s expectations at the date of this announcement, however they are
not guarantees or predictions of future performance or statements of fact. Forward-looking information
involves known and unknown risks, uncertainties and other factors (many of which are beyond the control
of Boss and its directors and management) which may cause the actual results, performance or achievements
of Boss and its business to be materially different from any future results, performance or achievements
expressed or implied by the forward-looking information. Accordingly, undue reliance should not be placed
on forward-looking information.
The forward-looking statements in this announcement reflect various assumptions by or on behalf of Boss
(which assumptions may prove to be inaccurate). Accordingly, this is another reason why such statements
are subject to significant business, technical, legal, economic and competitive and other uncertainties and
contingencies and other factors which may be beyond the control of Boss which could cause actual results
or trends to differ materially from the forward-looking statements in this announcement, including but not
limited to differences or inaccuracies arising from price and currency fluctuations, geotechnical factors,
geological and mining factors, estimated continuity of mineralised horizons, metallurgical and processing
factors, sales factors, drilling and production results, development progress, operating results, mineral
resource estimates, legal issues, legislative, fiscal and regulatory developments, economic and financial
market conditions in various countries, approvals and cost estimates, environmental risks, ability to meet
funding requirements, share price volatility, uranium markets and other matters. Accordingly, there can be
no assurance that such forward-looking statements and projections will be realised.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 9
Boss makes no representations as to the accuracy or completeness of any forward-looking statements or
projections or that any forecasts will be achieved. Additionally Boss makes no representation or warranty,
express or implied, in relation to, and (to the maximum extent permitted by law) no responsibility or liability
(whether for negligence, under statute or otherwise) is or will be accepted by Boss or by any of its officers,
directors, shareholders, partners, employees, or advisers as to or in relation to the accuracy or completeness
of the information, statements, opinions or matters (express or implied) arising out of, contained in or
derived from this announcement or any omission from this announcement.
Boss does not undertake or accept any obligation or undertaking to release publicly any updates or revisions
to any forward-looking statements to reflect any change in Boss’s expectations or any change in events,
conditions or circumstances on which any such statement is based, except as required by law.
Mineral Resource estimates are necessarily imprecise and depend on interpretations and geological
assumptions, minerals prices, cost assumptions and statistical inferences (and assumptions concerning other
factors, including mining, processing, metallurgical, infrastructure, economic, marketing, legal,
environmental, social and governmental factors) which may ultimately prove to be incorrect or unreliable.
Mineral Resource estimates are regularly revised based on actual exploration or production experience or
new information and could therefore be subject to change. In addition, there are risks associated with such
estimates, including (among other risks) that minerals mined may be of a different grade or tonnage from
those in the estimates and the ability to economically extract and process the minerals may become
compromised or not eventuate. Accordingly, this is another reason why no assurances can be given of
whether the production guidance, financial forecasts or other forecasts or other forward-looking statements
or information in this announcement will be achieved.
Effect of Rounding
A number of figures, amounts, percentages and estimates in this announcement are subject to the effect of
rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this
announcement.
Past Performance
Past performance information, including past share price performance of Boss and past Honeymoon Project
information, given in this announcement is given for illustrative purposes only and should not be relied upon
as (and is not) an indication of Boss’s (or anyone else’s) views on Boss’s future activities, guidance or financial
performance or condition. Past performance of Boss cannot be relied upon as an indicator of (and provides
no guidance as to) the future performance of Boss.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 10
Appendix One:
Schedule of Mining Tenements
The following information is provided pursuant to Listing Rule 5.3.3 for the quarter ended 30 September
2025.
Tenement Name Location Licence Number Interest
Yarramba South Australia EL6510 100%
South Eagle South Australia EL6081 100%
Gould’s Dam South Australia EL6512 100%
Katchiwilleroo South Australia EL6511 100%
Ethiudna South Australia EL6020 100%
Gould’s Dam South Australia RL83-85 100%
Honeymoon Mine South Australia ML6109 100%
Prairie Dam South Australia EL6962 75%
Chalker Dam South Australia EL6963 75%
Oakvale South Australia EL6964 75%
Gairloch South Australia EL6965 75%
Venus Bay South Australia EL6992 100%
Darke Peak South Australia EL7013 100%
Rudall South Australia EL6999 100%
There were no mining tenement acquisitions or divestments during the quarter.