March 2025 Quarterly Results Presentation
Released
Released
Announcement PDF
A global multi-mine Uranium producer
Honeymoon generates first free cashflow on highly
successful ramp up and strong margins
March 2025 Quarterly Results
29 April 2025
ASX: BOE | OTCQX: BQSSF
bossenergy.com
Boss remains on track to deliver production and cost guidance
Highlights
Key ramp up
milestones delivered
Strong Financial
Position
• Remain on track to deliver 850k lbs of
U3O8 drummed in FY2025
•
$229 million in cash and liquid assets,
including $64 million held in cash and
1.21M lbs inventory on hand1.
•
Honeymoon recorded its first quarter of
positive free cash flow
• Honeymoon produced 295,819 lbs of
U3O8 drummed (up 116% from
December quarter) and 246,869 lbs
IX production (up 15%)
•
Received cash for 268,000 lbs2 in March
quarter at a realised price of US$84/lb
(previous quarter 200,000 lbs at
US$77.5/lb)
•
C1 cost from drummed uranium of
A$33/lb (US$21/lb) below 2H25 guidance
of A$37-41/lb (US$23-25/lb)
• NIMCIX column 3 ramping up;
Wellfield 3 brought online (end
March)
• Alta Mesa produced 91K lbs of U3O8
drummed (100% basis)
Further ramp up
and growth
initiatives underway
•
Continued Honeymoon drilling and
ordering long lead items for Wellfields
•
Completion of NIMCIX columns 4-6
•
Strategic investment of 19.7% in
Laramide Resources Ltd to secure
exposure to the significant exploration
and development upside at the
Westmoreland Uranium Project in
Queensland
•
Updated independent mineral resource
estimates (MRE) for Jasons and Goulds
dam deposits are anticipated for the
next quarter
Notes
1. Includes loan receivable from enCore Energy of 100K lbs
2. Includes equivalent of 18K lbs representing interest on loan receivable from enCore Energy
Boss Energy | A global multi-mine Uranium producer
2
Production
and Cost
Strong quarterly production growth keeps Boss on track to meet guidance
Honeymoon Production Results
HONEYMOON PRODUCTION (3Q25)
lbs (000’s)
350
• Delivered strong quarterly growth in U3O8 drummed of 159K lbs
(116%) and growth in IX production of 32K lbs (15%) as compared
to the December 2025 quarter.
Thousands
HONEYMOON QUARTERLY PRODUCTION
300
• Remain on track to deliver 850K lbs U3O8 drummed for FY25.
250
• U3O8 drummed exceeded IX production as inventory accumulated
in previous quarters was processed through increased drying and
packing capacity.
200
• Commissioning of the kiln and baghouse (as part of the drying
and packing area) took longer than expected during the quarter.
These challenges are being resolved and are not expected to
impact ramp up targets.
150
100
• Despite noted commissioning challenges, record production
during February of 123K lbs drummed which represents an
annualised run-rate of ~1.5M lbs
50
0
4Q24
1Q25
IX Production
Boss Energy | A global multi-mine Uranium producer
2Q25
U3O8 Drummed
3Q25
• Key next activities on ramp up plan are increasing flow rate given
availability of Wellfield 3 and IX Column 3 and changing the
precipitation circuit operating regime from batch to continuous
operation along with continued construction of columns 4 to 6.
4
C1 Cost below guidance. First quarter of positive free cash flow for Honeymoon
Cost update
Cash cost of $33/lb (US$21/lb)
reflects strong operational
performance. Honeymoon free
cashflow positive during ramp up.
Cash cost for Q4 FY2025 expected to
increase but finish at bottom end of
2H25 guidance of A$37-41/lb
(US$ 21-23/lb).
Wellfields capex represents
investment in Wellfields 4-9
including first fill, drilling and long
lead items.
Honeymoon Costs (AUD)1
Unit
March Q3
FY2025 (Actual)
2H FY2025
(Guidance provided)
Cash Cost – Fixed
$/lb
21
22-24
Cash Cost – Variable
$/lb
13
15-17
Cash Cost – Total
$/lb
33
37-41
Capex – Wellfields
$M
8
17-20
Capex – Capital Projects
$M
4
19-21
Capex – Other sustaining capital
$M
0
1-2
Capex - Total
$M
12
38-43
Notes: (1) Definitions of costs consistent with EFS. Refer to Appendix 3 for definitions
Project Capex expected to ramp up
in Q4 FY2025 in line with project
activity.
Boss Energy | A global multi-mine Uranium producer
5
Alta Mesa continues to ramp up to nameplate capacity of 1.5 million pounds
Alta Mesa
Boss Energy | A global multi-mine Uranium producer
•
Production during the quarter from the Alta Mesa,
a Joint Venture with enCore Energy (Boss
ownership of 30%), totalled 98K lbs of U3O8 (on a
100% basis).
•
Alta Mesa continues its ramp up with 50,000 lbs
U3O8 captured, equivalent to a run rate of 1,900
lbs per day, between 6 March and 31 March 2025.
This represented the highest rate since the Alta
Mesa plant returned to operations in June 2024.
•
A total of 29,126 lbs U3O8 was delivered to Boss’s
account to sell unencumbered.
•
Successful startup of its second Ion Exchange (“IX”)
Circuit on 12 March 2025, doubling total flow
capacity. enCore has also installed additional
injection and extraction wells in the currently
permitted and operational wellfields.
•
Alta Mesa is ramping up to an annualised
production rate of 1.5 million pounds U3O8. Boss’
share of this production is 30 per cent
6
Growth
Continued to grow Boss’ growth pipeline whilst remaining disciplined on capital
Growth pipeline
Boss Energy - Australian exploration
19.7% Shareholder of Laramide Resources
South Australia
Northern Territory
Queensland & Northern Territory
United States & Kazakhstan
• Gould’s Dam and Jasons satellite
deposits: Completed infill drilling
and consultants engaged to
produce a mineral resource
update (Q4FY2025)
• A gated approach earn-in
agreement with the Eclipse
Group for the Liverpool Uranium
Project in the highly prospective
Alligator Rivers Uranium Field
• Boss increased its shareholding
of Laramide Resources to 19.7%.1
• Churchrock-Crownpoint ISR
uranium project in New Mexico
• La Sal Project, a conventional
hard-rock asset in Utah
• Drilled prospects at Cummins
Dam and Sara Dam. Whilst
positive results were returned,
deposits do not appear to be
economic / suitable for ISR.
• Agreement has been structured
so Boss can systematically
progress the work through a
number of stages and decision
points before expenditure
commitments
• Flagship asset is the
Westmoreland Uranium Project;
one of the largest and highestquality uranium development
projects in Australia ~ MRE of
65.8M lbs U3082
• Continue to generate exploration
targets around the Honeymoon
operation.
• Murphy Project is comprised of
strategically located uranium
tenements over 683 km2 in the
Northern Territory
• La Jara Mesa ISR Project in New
Mexico
• Large greenfield uranium
exploration opportunity in
Kazakhstan featuring a 6,000 km2
land position in prolific ChuSarysu Basin.
Notes
1. Boss is not in active discussions with Laramide and, subject to there being no actual or proposed material change in the shareholding of Laramide (including a change of control proposal) or the actions of
Laramide, Boss has no current intention to acquire control or make a takeover offer for Laramide.
2. Refer to Laramide’s ASX Announcement “Laramide MRE Update for Westmoreland Uranium Project (amended)” released on 7 March 2025
Boss Energy | A global multi-mine Uranium producer
8
Market
Update
Boss Energy well positioned to benefit from rising Long-Term price
Market Update
•
The World Nuclear Fuel Cycle conference took
place in Montreal in early April. At that time
there were no US tariffs on any of the global
uranium producers but there was real concern
that this could change at any time. One effect
of lower spot prices and global trade
uncertainty is that Buyer interest in near to mid
term purchasing has increased.
100
While the spot price declined by 10% during
the quarter to US$64.45/lb, the term price has
held firm at US$80.00/lb.
Boss Energy | A global multi-mine Uranium producer
120
80
60
40
20
U3O8 Spot Price
May-24
May-23
May-22
May-21
May-20
May-19
May-18
May-17
May-16
May-15
May-14
May-13
May-12
May-11
May-10
May-09
May-08
May-07
The timely availability of supply is threatened
by geopolitical and trade risks, a weaker supply
chain and several announcements of missed
ramp up targets, deferred start up decisions
and increased timelines for regulatory
140
May-06
•
US$
160
May-05
•
The first quarter of 2025 has been
characterised by uncertainty created by several
factors. Some of the most significant of these
are sanctions on Russian uranium, how they
will be treated and potential tariffs on imports
of nuclear fuel into the USA.
May-04
•
U3O8 Long-Term Price
Source: UxC, LLC https://www.uxc.com/
10
Financials
Strong financial position with $229 million in cash and liquid assets
Financial Position
•
•
•
Honeymoon recorded its first quarter of positive
free cash flow.
Balance Sheet remains robust with circa $229
million in cash and liquid investments on hand
and no debt, a decrease of $22.4M from the
December Quarter primarily driven by ‘marked to
market’ movements in inventory and listed
investments.
Received cash for 268,000 lbs of uranium at an
average realised price of US$83.5/lb.
Quarter ended
Unit
Sales
Lbs
Loan repayment
March
December
September
150,000
200,000
200,000
Lbs
118,000
-
-
Total Cash Received1
US$
22,389
15,500
15,608
Realised price
US$/lb
83.5
77.5
78.0
Cash on hand
A$ (000’s)
63,773
65,177
66,551
Inventory on hand2
A$ (000’s)
106,925
117,279
114,861
Inventory on hand2
MLbs
1.22
1.08
1.17
Loan receivable
A$ (000’s)
16,140
34,808
30,560
Investments and other liquid assets
A$ (000’s)
42,386
34,382
32,931
Total cash and liquid investments
A$ (000’s)
229,224
251,646
244,903
Notes: (1) Cash received includes both sales and loan repayments (2) Inventory includes strategic inventory and inventory on
hand. Excludes inventory ‘in circuit’ e.g. IX production
Boss Energy | A global multi-mine Uranium producer
12
Summary
Boss continues to deliver guidance and pursue disciplined growth opportunities
Summary
•
$229 million in cash and liquid assets
•
Honeymoon has become free cash flow positive in its first year of
ramp up
•
Production: On track to meet production guidance of 850k lbs in FY25.
On track
•
Cost: On track to meet 2H25 C1 cost guidance of AUD37-41/lb
(implying C1 margin of 68-71% based on Term Price).
Plant infrastructure
•
Investing in future wellfield infrastructure and NIMCIX columns 4-6 to
enable continued ramp up.
•
Progressing organic and inorganic growth opportunities whilst remaining
disciplined on capital allocation.
Strong Balance Sheet
Growth opportunities
Boss Energy | A global multi-mine Uranium producer
14
Appendices
Appendix 1: Quarterly Cashflow bridge
$000's
120,000
16,180
100,000
16,583
80,000
(9,867)
(5,000)
(3,866)
(6,544)
65,177
(6,383)
60,000
3,585
63,773
Other
Closing
Cash
(6,091)
40,000
20,000
Opening
Cash
Receipts
enCore Honeymoon Honeymoon Honeymoon Alta Mesa
from
Loan
Operating Wellfields
Capital
Costs
customers Repayment
costs
capex
project
G&A
Exploration
and
investments
Notes: Other corporate costs include FX, interest income and repayment of leases
Boss Energy | A global multi-mine Uranium producer
16
Appendix 2: Physicals Summary
Honeymoon
Unit
3Q FY25
2Q FY25
1Q FY25
IX Flow (total)1
m3
1,088,704
861,204
729,299
PLS to IX tenor
U 3O 8
mg/l
108
116
71
IX Recovery
%
95.5
97.8
97.2
IX Production (total)1
lbs
246,869
215,319
110,050
U3O8 Drummed (total)
lbs
295,815
137,084
89,516
Notes:
1. Conversions: There are 1,000 litres per m3 and 0.00000220462 lbs per mg.
Boss Energy | A global multi-mine Uranium producer
17
Appendix 3: Cost definitions
Cash cost fixed: Reflects onsite processing fixed costs such as labour, insurance, camp, maintenance, laboratory, site general and
administration costs. It also includes the fixed component of other costs (e.g. power has a fixed network connection fee)
Cash cost variable: Reflects onsite variable processing costs such as reagents and consumables, power and transportation costs
Wellfields capex: includes drilling, casing and screening the wells, the injection and extraction pumps, the wellhouse, the piping which
connects the injection and extraction wells to the wellhouse, trunklines which connects groups of wellfields back to the plant and first
fill costs (the cost to flush and ‘charge’ the wellfield with reagents before uranium production can begin)
Project capex: includes the EPCM / Project scope that was set out in the EFS, including the ‘Re-start’ and ‘Additional IX’ capex
Other sustaining capital: includes a range small optimisation projects to support ramp up
Boss Energy | A global multi-mine Uranium producer
18
Honeymoon and Alta Mesa Resource Tables
HONEYMOON JORC EXPLORATION TARGETS AND MINERAL RESOURCE
ALTA MESA NI 43-101 MINERAL RESOURCE ESTIMATE (2023)
The information in this Presentation relating to the Enhanced Feasibility Study (EFS) is extracted from the announcement
entitled ‘Updated Feasibility Study identifies lower costs and increased financial returns’ dated 21st June 2021. Boss Energy
confirms that all the material assumptions underpinning the production targets, and forecast financial information derived
from the production targets, continue to apply and have not materially changed. As the EFS utilises a portion of Inferred
Mineral Resources, the ASX Listing Rules (Listing Rules) require a cautionary statement to be included in this Presentation. The
EFS is based on a Mineral Resources Estimate in accordance with the JORC 2012 guidelines (ASX: 149% Increase in Measured and
Indicated Resources at Honeymoon date 25 February 2019). The Company advises that the EFS uses a portion of Inferred
Resources; in the first 3 years (less than 1%), in the first 5 years (5%) and over the 11-year life of mine (19%). The Company
confirms that the use of Inferred Resources is not a determining factor to the Honeymoon Project’s economic viability. There
is a low level of geological confidence associated with Inferred Resources and there is no certainty that further exploration or
evaluation work will result in the determination of Indicated Resources or that the production targets reported in this
announcement will be realised.
For the purposes of Listing Rule 5.12, Boss Energy cautions that the mineral resources for the Alta Mesa Project are not
reported in accordance with the JORC Code. The mineral resource estimate at Alta Mesa is a foreign estimate prepared in
accordance with Canadian National Instrument 43-101. A competent person has not done sufficient work to classify the
foreign estimate as a mineral resource in accordance with the JORC Code, and it is uncertain whether further evaluation and
exploration will result in an estimate reportable under the JORC Code. Please refer to Annexure A for additional technical
information relating to the foreign estimate.
The mineral resource estimate and exploration target in this Presentation were reported by the Company in accordance with
Listing Rules 5.8 and 5.7 (respectively) on 25 February 2019 and 25 March 2019, respectively. The Company confirms it is not
aware of any new information or data that materially affects the information included in the previous announcement and
that all material assumptions and technical parameters underpinning the estimates in the previous announcement continue
to apply and have not materially changed. In relation to the exploration target, this does not include areas of the existing
mineral resource and the potential quantity and grade reported are conceptual only in nature. Insufficient exploration has
been conducted to estimate a mineral resource and it is uncertain whether future exploration will lead to the estimation of
a mineral resource in the defined areas.
Tonnes (Mt)
Grade (%U3O8)
Contained U3O8
(Mlbs)
Measured
3.1
0.110
7.6
Indicated
18.4
0.063
25.5
The information in this Presentation and in Annexure A provided under Listing Rules 5.12.2 to 5.12.7 that relates to the
foreign estimate for the Alta Mesa Project is based on information compiled by Mr Jason Cherry, and is an accurate
representation of the available data and studies for the Alta Mesa Project.
Mr Cherry is a member of the Australian Institute of Geoscientists (AIG) and has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify as a
Competent Person, as defined in the JORC 2012 edition of the “Australasian Code for Reporting of Mineral Resources and Ore
Reserves”. Mr Cherry has 17 years’ experience and is a full-time employee as Geology Manager for Boss Energy Ltd. Mr
Cherry consents to the inclusion in this Presentation of the matters based on this information in the form and context in
which they appear.
Resource
Category
Tonnes
(‘000)
Grade (%U3O8)
Contained
U3O8
(‘000 lbs)
Within existing
wellfields
Measured
54
0.152
164
Alta Mesa
Indicated
1,397
0.106
2,959
Mesteña Grande
Indicated
119
0.120
287
1,570
0.109
3,410
Total Measured &
Indicated Mineral
Resources
Alta Mesa
Inferred
1,263
0.126
3,192
Inferred
5,733
0.119
13,601
6,996
0.120
16,793¹
Inferred
30.9
0.057
38.5
Mesteña Grande
Total
52.4
0.062
71.6
Total Inferred Mineral
Resource
Boss Energy | A global multi-mine Uranium producer
19
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (Boss Energy or
Company). NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the
recipient’s investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent
assessment and investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should
not rely on any statement or the adequacy and accuracy of any information. This Presentation is in summary form and does not
purpose to be exhaustive. This Presentation should be read in conjunction with Boss Energy’s periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of
the Information. Boss Energy and its directors, employees, agents and consultants shall have no liability (including liability to any
person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or
implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute that
can not be excluded.
FORWARD LOOKING STATEMENTS
All dollar amounts are in Australian dollars unless otherwise indicated. This announcement may contain certain statements and
projections provided by or on behalf of Boss Energy Limited with respect to the anticipated future undertakings. These forwardlooking statements reflect various assumptions by or on behalf of Boss Energy. Accordingly, these statements are subject to
significant business, economic and competitive uncertainties and contingencies associated with the mining industry which may be
beyond the control of Boss Energy which could cause actual results or trends to differ materially, including but not limited to price
and currency fluctuations, geotechnical factors, drilling and production results, development progress, operating results, reserve
estimates, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries, approvals
and cost estimates, environmental risks, ability to meet funding requirements, share price volatility. Accordingly, there can be no
assurance that such statements and projections will be realised. Boss Energy makes no representations as to the accuracy or
completeness of any such statement of projections or that any forecasts will be achieved. Additionally, Boss Energy makes no
representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under
statute or otherwise) is or will be accepted by Boss Energy or by any of their respective officers, directors, shareholders, partners,
employees, or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions or matters
(express or implied) arising out of, contained in or derived from this announcement or any omission from this announcement or of
any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In furnishing
this announcement, Boss Energy undertakes no obligation to provide any additional or updated information whether as a result of
new information, future events or results or otherwise. Nothing in this material should be construed as either an offer to sell or a
solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in isolation as a
basis to invest in Boss Energy.
The information in this document relating to the Enhanced Feasibility Study(“EFS”) is extracted from the announcement entitled
‘Updated Feasibility Study identifies lower costs and increased financial returns’ dated 21 June 2021. Boss Energy confirms that
all the material assumptions underpinning the production targets, and forecast financial information derived from the production
targets, continue to apply and have not materially changed.
The Company advises that the EFS uses a portion of Inferred Resources in the first 3 years (less than 1%), in the first 5 years(5%)
and over the 11-year life of mine(19%). The Company confirms that the use of Inferred Resources is not a determining factor to the
Honeymoon Project’s economic viability. There is a low level of geological confidence associated with Inferred Resources and there
is no certainty that further exploration or evaluation work will result in the determination of Indicated Resources or that the
production targets reported in this announcement will be realised.
REFERENCE TO PREVIOUS ASX ANNOUNCEMENTS
The mineral resource estimate and exploration target in this announcement were reported by the Company in accordance with
listing rules 5.8 and 5.7(respectively)on 25 February 2019 and 25 March 2019, respectively. The Company confirms it is not aware
of any new information or data that materially affects the information included in the previous announcement and that all material
assumptions and technical parameters underpinning the estimates in the previous announcement continue to apply and have not
materially changed.
In relation to the exploration target, this does not include areas of the existing mineral resource and the potential quantity and
grade reported are conceptual only in nature. Insufficient exploration has been conducted to estimate a mineral resource and it is
uncertain whether future exploration will lead to the estimation of a mineral resource in the defined areas.
EFFECT OF ROUNDING
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
PAST PERFORMANCE
Past performance information, including past share price performance of Boss Energy and pro forma financial information, given in
this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss Energy’s
(or anyone else’s) views on Boss Energy’s future financial performance or condition. Past performance of Boss Energy cannot be
relied upon as an indicator of (and provides no guidance as to) the future performance of Boss Energy. Nothing contained in this
Presentation nor any information made available to you is, or shall be relied upon as a promise, representation, warranty or
guarantee, whether as to the past, present or future.
JORC CODE
It is a requirement of the Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the Joint
Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves ("JORC Code"). Investors
outside Australia should note that while ore reserve and mineral resource estimates of the Company in this Presentation comply
with the JORC Code (such JORC Code-compliant ore reserves and mineral resources being "Ore Reserves" and "Mineral
Resources" respectively), they may not comply with the relevant guidelines in other countries and, in particular, do not comply
with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the
"Canadian NI 43-101 Standards"); or (ii) Item 1300 of Regulation S-K, which governs disclosures of mineral reserves in
registration statements filed with the SEC. Information contained in this document describing mineral deposits may not be
comparable to similar information made public by companies subject to the reporting and disclosure requirements of Canadian or
US securities laws.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy.
As the EFS utilises a portion of Inferred Mineral Resources, the ASX Listing Rules require a cautionary statement to be included in
this presentation. The EFS is based on a Mineral Resources Estimate in accordance with JORC guidelines 2012 (ASX:149% Increase
in Measured and Indicated Resources at Honeymoon dated 25 February 2019).
Boss Energy | A global multi-mine Uranium producer
20
Boss Energy Limited
March 2025 Quarterly Results