An international multi-mine Uranium producer
Positioned to benefit from a rising Uranium market
Resources Rising Stars Gold Coast Conference
4 September 2024
ASX: BOE | OTCQX: BQSSF
bossenergy.com
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (“Boss Energy” or
“Company”). NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the
recipient’s investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent
assessment and investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should
not rely on any statement or the adequacy and accuracy of any information. This Presentation is in summary form and does not
purpose to be exhaustive. This Presentation should be read in conjunction with Boss Energy’s periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of
the Information. Boss Energy and its directors, employees, agents and consultants shall have no liability (including liability to any
person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or
implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute that
can not be excluded.
FORWARD LOOKING STATEMENTS
All dollar amounts are in Australian dollars unless otherwise indicated. This announcement may contain certain statements and
projections provided by or on behalf of Boss Energy Limited with respect to the anticipated future undertakings. These forwardlooking statements reflect various assumptions by or on behalf of Boss Energy. Accordingly, these statements are subject to
significant business, economic and competitive uncertainties and contingencies associated with the mining industry which may be
beyond the control of Boss Energy which could cause actual results or trends to differ materially, including but not limited to price
and currency fluctuations, geotechnical factors, drilling and production results, development progress, operating results, reserve
estimates, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries, approvals
and cost estimates, environmental risks, ability to meet funding requirements, share price volatility. Accordingly, there can be no
assurance that such statements and projections will be realised. Boss Energy makes no representations as to the accuracy or
completeness of any such statement of projections or that any forecasts will be achieved. Additionally, Boss Energy makes no
representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under
statute or otherwise) is or will be accepted by Boss Energy or by any of their respective officers, directors, shareholders, partners,
employees, or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions or matters
(express or implied) arising out of, contained in or derived from this announcement or any omission from this announcement or of
any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In furnishing
this announcement, Boss Energy undertakes no obligation to provide any additional or updated information whether as a result of
new information, future events or results or otherwise. Nothing in this material should be construed as either an offer to sell or a
solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in isolation as a
basis to invest in Boss Energy.
The information in this document relating to the Enhanced Feasibility Study(“EFS”) is extracted from the announcement entitled
‘Updated Feasibility Study identifies lower costs and increased financial returns’ dated 21 June 2021. Boss Energy confirms that
all the material assumptions underpinning the production targets, and forecast financial information derived from the production
targets, continue to apply and have not materially changed.
The Company advises that the EFS uses a portion of Inferred Resources in the first 3 years (less than 1%), in the first 5 years(5%)
and over the 11-year life of mine(19%). The Company confirms that the use of Inferred Resources is not a determining factor to the
Honeymoon Project’s economic viability. There is a low level of geological confidence associated with Inferred Resources and there
is no certainty that further exploration or evaluation work will result in the determination of Indicated Resources or that the
production targets reported in this announcement will be realised.
REFERENCE TO PREVIOUS ASX ANNOUNCEMENTS
The mineral resource estimate and exploration target in this announcement were reported by the Company in accordance with
listing rules 5.8 and 5.7(respectively)on 25 February 2019 and 25 March 2019, respectively. The Company confirms it is not aware
of any new information or data that materially affects the information included in the previous announcement and that all material
assumptions and technical parameters underpinning the estimates in the previous announcement continue to apply and have not
materially changed.
In relation to the exploration target, this does not include areas of the existing mineral resource and the potential quantity and
grade reported are conceptual only in nature. Insufficient exploration has been conducted to estimate a mineral resource and it is
uncertain whether future exploration will lead to the estimation of a mineral resource in the defined areas.
EFFECT OF ROUNDING
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
PAST PERFORMANCE
Past performance information, including past share price performance of Boss Energy and pro forma financial information, given in
this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss Energy’s
(or anyone else’s) views on Boss Energy’s future financial performance or condition. Past performance of Boss Energy cannot be
relied upon as an indicator of (and provides no guidance as to) the future performance of Boss Energy. Nothing contained in this
Presentation nor any information made available to you is, or shall be relied upon as a promise, representation, warranty or
guarantee, whether as to the past, present or future.
JORC CODE
It is a requirement of the Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the Joint
Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves ("JORC Code"). Investors
outside Australia should note that while ore reserve and mineral resource estimates of the Company in this Presentation comply
with the JORC Code (such JORC Code-compliant ore reserves and mineral resources being "Ore Reserves" and "Mineral
Resources" respectively), they may not comply with the relevant guidelines in other countries and, in particular, do not comply
with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the
"Canadian NI 43-101 Standards"); or (ii) Item 1300 of Regulation S-K, which governs disclosures of mineral reserves in
registration statements filed with the SEC. Information contained in this document describing mineral deposits may not be
comparable to similar information made public by companies subject to the reporting and disclosure requirements of Canadian or
US securities laws.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy.
As the EFS utilises a portion of Inferred Mineral Resources, the ASX Listing Rules require a cautionary statement to be included in
this presentation. The EFS is based on a Mineral Resources Estimate in accordance with JORC guidelines 2012 (ASX:149% Increase
in Measured and Indicated Resources at Honeymoon dated 25 February 2019).
Boss Energy | An international multi-mine Uranium producer
2
Honeymoon and Alta Mesa Resource Tables
HONEYMOON JORC EXPLORATION TARGETS AND MINERAL RESOURCE
ALTA MESA NI 43-101 MINERAL RESOURCE ESTIMATE (2023)
The information in this Presentation relating to the Enhanced Feasibility Study (“EFS”) is extracted from the
announcement entitled ‘Updated Feasibility Study identifies lower costs and increased financial returns’ dated 21st
June 2021. Boss Energy confirms that all the material assumptions underpinning the production targets, and forecast
financial information derived from the production targets, continue to apply and have not materially changed. As the
EFS utilises a portion of Inferred Mineral Resources, the ASX Listing Rules (“Listing Rules”) require a cautionary
statement to be included in this Presentation. The EFS is based on a Mineral Resources Estimate in accordance with
the JORC 2012 guidelines (ASX: 149% Increase in Measured and Indicated Resources at Honeymoon date 25
February 2019). The Company advises that the EFS uses a portion of Inferred Resources; in the first 3 years (less
than 1%), in the first 5 years (5%) and over the 11-year life of mine (19%). The Company confirms that the use of
Inferred Resources is not a determining factor to the Honeymoon Project’s economic viability. There is a low level of
geological confidence associated with Inferred Resources and there is no certainty that further exploration or
evaluation work will result in the determination of Indicated Resources or that the production targets reported in this
announcement will be realised.
For the purposes of Listing Rule 5.12, Boss Energy cautions that the mineral resources for the Alta Mesa
Project are not reported in accordance with the JORC Code. The mineral resource estimate at Alta Mesa is a
foreign estimate prepared in accordance with Canadian National Instrument 43-101. A competent person has
not done sufficient work to classify the foreign estimate as a mineral resource in accordance with the JORC
Code, and it is uncertain whether further evaluation and exploration will result in an estimate reportable
under the JORC Code. Please refer to Annexure A for additional technical information relating to the foreign
estimate.
The mineral resource estimate and exploration target in this Presentation were reported by the Company in
accordance with Listing Rules 5.8 and 5.7 (respectively) on 25 February 2019 and 25 March 2019, respectively. The
Company confirms it is not aware of any new information or data that materially affects the information included in
the previous announcement and that all material assumptions and technical parameters underpinning the estimates
in the previous announcement continue to apply and have not materially changed. In relation to the exploration
target, this does not include areas of the existing mineral resource and the potential quantity and grade reported are
conceptual only in nature. Insufficient exploration has been conducted to estimate a mineral resource and it is
uncertain whether future exploration will lead to the estimation of a mineral resource in the defined areas.
Tonnes (Mt)
Grade (%U3O8)
Contained U3O8
(Mlbs)
Measured
3.1
0.110
7.6
Indicated
18.4
0.063
25.5
Inferred
30.9
0.057
38.5
Total
52.4
0.062
71.6
The information in this Presentation and in Annexure A provided under Listing Rules 5.12.2 to 5.12.7 that
relates to the foreign estimate for the Alta Mesa Project is based on information compiled by Mr Jason Cherry,
and is an accurate representation of the available data and studies for the Alta Mesa Project.
Mr Cherry is a member of the Australian Institute of Geoscientists (AIG) and has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration, and to the activity being
undertaken to qualify as a Competent Person, as defined in the JORC 2012 edition of the “Australasian Code
for Reporting of Mineral Resources and Ore Reserves”. Mr Cherry has 17 years’ experience and is a full-time
employee as Geology Manager for Boss Energy Ltd. Mr Cherry consents to the inclusion in this Presentation
of the matters based on this information in the form and context in which they appear.
Resource
Category
Tonnes (‘000)
Grade (%U3O8)
Contained U3O8
(‘000 lbs)
Within existing wellfields
Measured
54
0.152
164
Alta Mesa
Indicated
1,397
0.106
2,959
Mesteña Grande
Total Measured &
Indicated Mineral
Resources
Indicated
119
0.120
287
1,570
0.109
3,410
Alta Mesa
Inferred
1,263
0.126
3,192
Mesteña Grande
Inferred
5,733
0.119
13,601
6,996
0.120
16,793¹
Total Inferred Mineral
Resource
Boss Energy | An international multi-mine Uranium producer
Building mines takes time….Honeymoon took half a century from discovery to being a commercially viable mine…
Honeymoon Uranium Mine History
Boss Energy | An international multi-mine Uranium producer
4
It’s all about timing.
Strategic Horizons
Vision & Strategy
- Be Australia’s Next Uranium
Producer
- 10 year mine life +
- 2.5Mlb U308 per annum
production
- 100Mlb exploration target
- Superior Total Shareholder
Return, campaign style, fiscal
discipline
- Solid relationships with key
stakeholders, government,
industry, investors, employees,
traditional owners
Boss Energy | An international multi-mine Uranium producer
Foundation & Development
- Proven Board & Management
- Skilled, committed, stable wellfield,
processing and exploration geology
team
- Proven chemistry - Successful
feasibility studies and Field Leach
Trials
- Strategic inventory of 1.25Mlb
U308 for working capital,
competitive market terms
- Self performing Project and
Construction team, engineering,
procurement, construction and
management
Boss has delivered two producing mines and has a
market capital growth of $1.1B and zero debt
Organic Growth
- Full pipeline of near-mine and
regional exploration targets in South
Australia
- Honeymoon 72Mlbs U308 JORC
Resource
~ Mining license, export permit,
producing and first sales in April
2024
- Highly successful exploration
strategy, increasing JORC Resource
from 16.57Mlbs to 71.67Mlbs (~4.3x)
Mergers & Acquisitions
- Discipline First – value
accretive M&A with Alta Mesa
- Tier 1 jurisdiction focus,
Australia, North America and
Canada
- Focus on economic resources
which can produce
- ASX 200 and strong
institutional support for Boss
Energy strategy
- Over 6,000 km2 of prospective
tenements in South Australia
- Recognised global producer, a
partner of choice for
consolidation
- Base Metal Joint Ventures
- BOSS IS OPEN FOR BUSINESS
5
An International multi-mine ISR producer in Two tier One locations
Global Uranium Platform in Tier 1 Locations
HONEYMOON (100% ownership): 2.45Mlbs U308 p.a.
ALTA MESA (30% ownership): 1.5Mlbs U308 p.a.
South Australia
First drum produced
Texas
First drum expected
Uranium friendly
Produced in April 2024 with
first cashflow in Q3 CY24
Uranium friendly
IX process proven
Ramp up per schedule
Proven management team
Exceptional drilling results
Key metrics already exceeding
Feasibility Study forecasts
Ramp up to 2.45Mlb/annum
proceeding to plan
Team commenced production at
Rosita ISR restart plant
Significantly exceed the cutoff
grade required for ISR
Texas
Alta Mesa Project
Boss Energy | An international multi-mine Uranium producer
Q3 2024
6
A disciplined approach to raising capital. Out of $443 million raised, $274 million remains in cash and liquid assets 1
Shareholder returns
Sep 16: Scoping
study complete
Nov 17: Field
Leach Trial
Completed early studies and proved the
chemistry
Dec 15:
Acquisition of
Honeymoon
May 17: PreFeasibility complete
Annual Return (%)
Sep-15
Jun 21:Enhanced
Feasibility study
Raised capital, secured
inventory and finalise study
Mar 21: $60M
Capital Raising
Jan 24: Acquires
30% Alta Mesa
Jul 24: Alta Mesa
restarts
production
Expand internationally and
commence production
Apr 24: Honeymoon
restarts production
Mar 22: $125M
Capital Raising
Share price TSR
42.6
42.6
ASX 300 M&M
10.1
15.1
Sep-16
Upgraded the resource and
completed further studies
Feb 19: Mineral
Resource Upgrade
Boss
Mar-16
Jan 20:
Feasibility study
Jun 22:Final
Investment
Decision
Mar-17
Sep-17
Mar-18
Sep-18
Mar-19
Sep-19
Mar-20
Sep-20
Mar-21
Sep-21
Mar-22
Sep-22
Mar-23
Sep-23
Mar-24
Note: (1) As at 30 June 2024
(2) Chart shows share price performance indexed to 1 on 1 September 2015
Source: Bloomberg
Boss Energy | An international multi-mine Uranium producer
7
Previous produced and sold U308 globally
Honeymoon Restart
Uranium Mine Site
Boss Energy | Australia’s Next Clean Energy Producer
RO and Water Treatment Plant
9
9
ISR is a proven cost-effective uranium extraction process with reduced environmental impact relative to traditional mining
In-Situ Recovery (ISR) Mining
-
ISR accounts for ~ 60% global uranium mined,
used in Australia, Kazakhstan, USA
-
ESG friendly mining method - unlike
conventional mining, temporary ground
disturbance, no ground excavations, not tailings,
minimal dust and less water consumption
-
Barren leach liquor is injected through the
uranium hosted ore body, to recover high grade
pregnant liquor solution by production wells
and pumped to the surface.
-
Uranium is then extracted using ion exchange,
precipitated out and dried to produce U3O8.
-
~ 2/3 the cost of conventional mining and
average CAPEX less than 15% of conventional
mines
Source: United States Nuclear Regulatory Commissions (www.nrc.gov) (1) World Nuclear
Association – World Mining Uranium Production (December 2020) (2) TradeTech – The
Nuclear Review (October 2016)
Example Schematic (Source: Beverley Environmental Impact Statement (1998))
Boss Energy | An international multi-mine Uranium producer
10
Wellfield construction electrical, instrumentation, and piping materials on site has been installed
Wellfield construction electrical, instrumentation, and piping materials on site and being installed
Boss Energy | Australia’s Next Clean Energy Producer
11
11
Barren Leach Solution / Pregnant Leach Solution Ponds
Boss Energy | An international multi-mine Uranium producer
12
Boss owned 400T crane removing redundant Solvent Extraction pulse columns
Boss Energy | Australia’s Next Clean Energy Producer
13
13
First NIMCIX elution column entering Honeymoon uranium mine site
Boss Energy | Australia’s Next Clean Energy Producer
14
14
Gypsum Pond Earthworks
First IX Column Lift
Wellfield construction electrical, instrumentation, and piping materials on site and being installed
Boss Energy | Australia’s Next Clean Energy Producer
15
15
Completion of Columns:
#2 by September 2024
#3 by December 2024
#4-6 2025
Each NIMCIX column proportionately contributes to the production ramp up
Specific ramp up profile and production rates set out in the published Feasibility Studies
Boss Energy | An international multi-mine Uranium producer
16
Ramp-up running ahead of Feasibility Study schedule, with 57,364lbs of U308 produced by June 30, 2024;
A further 72,516lbs of U308 was produced in the combined months of July and August 2024.
NIMCIX columns 2 is being commissioned and 3 almost constructed, paving way for ongoing production increases
Boss has now sold uranium and received revenue $
Figure 1: Drummed uranium ready for first shipment
Boss Energy | An international multi-mine Uranium producer
17
Mining Licence of 36Mlb with a further defined 36Mlbs to be licenced
Substantial Exploration Target of 58Mlbs to 190Mlbs at grades up to 1,080ppm U3O81
Honeymoon Exploration Potential
-
In addition to the JORC Resource of 71.6Mlb, Honeymoon has a
substantial Exploration Target1 of 58Mlbs to 190Mlbs at grades up to
1,080ppm U308
-
Following strong infill drilling results Boss is undertaking technical and
economic studies on developing the satellite deposits as an additional
production source, ~36Mlb U308 indicated and inferred resource
-
Boss awarded Kinloch Project exploration tenements ~130km south of
Honeymoon. Also recently awarded three highly prospective
exploration tenements on the Eyre Peninsula in South Australia
-
Boss now has a total uranium exploration tenement package of over
6,000 km2 in South Australia
-
Joint Venture with First Quantum TSX: FM for earn-in arrangement for
discovery of copper
-
Boss’ exploration strategy has already been highly successful, increasing
the JORC Resource at Honeymoon from 16.57Mlbs to 71.67Mlbs (~4.3x)
since project acquisition in December 2015
Notes:
1.
Refer ASX announcement 25 March 2019. The potential quantity and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to
estimate a Mineral Resource and it is uncertain whether future exploration will result in the definition of a Mineral Resource. Please refer to the cautionary statement
and accompanying resource table in Slide 4 for further information.
Boss Energy | An international multi-mine Uranium producer
18
High grade 1,200ppm ISR project in a Tier 1 jurisdiction with significant potential for growth
Large ~200,000 acres of underexplored land package in a prolific uranium region
Alta Mesa ISR Uranium project
ALTA MESA PROCESSING FACILITY
- Located in South Texas – a prolific US district for sandstone-hosted ISR
production with historic production of ~80Mlb1
- Most progressive permitting production jurisdiction in the US
- Historically has produced the third largest amount of uranium out of
all ISR assets in the US, producing 4.6Mlb between 2005 and 2013
through ISR mining with an alkaline lixiviant1
- Existing 20Mlb total high-grade resource of 1,200 ppm2
- 1.5Mlb plant capacity with a simple path to expand capacity using
existing licences and drying capacity of 2Mlb
ALTA MESA HISTORICAL PRODUCTION REFERENCE POINTS
ALTA MESA NI 43-101 MINERAL RESOURCE ESTIMATE (2023)
Production reference points3
Average production between 2005 and 2013
Resource Category
0.58Mlb
Maximum yearly production between 2005 and 2013
1.07Mlb
Licenced processing capacity
1.5Mlb
Notes:
1.
enCore Energy November 2023 Corporate Presentation
2.
Please refer to the cautionary statement and accompanying resource table in Slide 4 for further information.
3.
Technical Report Summary for the Alta Mesa Uranium Project, Brooks and Jim Hogg Counties, Texas, USA National Instrument 43-101, Technical Report 2023,
BRS Engineering, using mid-point
Boss Energy | An international multi-mine Uranium producer
Tonnes (‘000)
Grade (%U3O8)
Contained U3O8
(‘000 lbs)
Within existing wellfields
Measured
54
0.152
164
Alta Mesa
Indicated
1,397
0.106
2,959
Mestena Grande
Indicated
119
0.120
287
1,570
0.109
3,410
Total M&I Mineral
Resources
Alta Mesa
Inferred
1,263
0.126
3,192
Mestena Grande
Inferred
5,733
0.119
13,601
6,996
0.120
16,793
Total Inferred Mineral
Resource
19
Partnership combines experience in development, commissioning and operating mining projects globally
Leading Development and Operating Experience
BOSS ENERGY
Wyatt Buck (Chair)
• GM of McArthur River Uranium Mine
• GM Key Lake Mill, the largest uranium
mining operation in the world.
• Executive GM for all of First Quantum’s
global assets
Duncan Craib (CEO and MD)
• Finance Director for construction and
commissioning of Husab uranium mine
in Namibia.
• CFO for Kalahari Minerals plc and its
43% interest in Extract Resources Ltd.
• MCA Uranium Forum Chair since 2021
Jan Honeyman (NED)
• First Quantum Director of Human
Resources (across all operations)
• KBR Energy, Global Director, Talent
Management
Sashi Davies (Sales and Strategic Advisor)
• Vice Chair World Nuclear Fuel Market
• Previously General Manager of CGN
Global Uranium Ltd
• Previously Head of Marketing for Extract
Resources (Husab mine in Namibia)
Mine development and / or
operating involvement by
respective teams
Boss Energy | An international multi-mine Uranium producer
Bryn Jones (NED)
• COO Laramide, (New Mexico and
Queensland assets uranium assets)
• Manager technical services Heathgate
Resources
• Worley-SNC Lavelin JV Uranium Lead
for the Olympic Dam Expansion Project
ENCORE ENERGY
Bill Sheriff (Founder and Exec
Chair) –
• Founder and Chair of Energy
Metals Corp
• Responsible for compiling largest
domestic uranium resource base
in US history prior to acquisition
by Uranium One Corp
Dennis Stover (Director & Chief
Technical Officer)
• Leading expert in ISR recovery
focussed on US production
• Independent ISR consultant for
Honeymoon
• Previous CEO enCore
• Executive Vice President,
Americas for Uranium One, Inc
overseeing development of
Uranium One’s assets in the US
Paul Goranson (Director & CEO)
• COO of Energy Fuels - Alta Mesa
and Nichols Ranch
• President, COO and Director
Uranerz - Nichols Ranch ISR
Uranium Project
• President, Cameco Resources
• Vice President of Mesteña
Uranium LLC
• Previous President of the
Uranium Producers of America
Susan Hoxie-Key (Director)
• Chairwoman of the World
Nuclear Fuel Market
• Lead Nuclear Engineer Southern
Nuclear Operating Company
Peter Luthiger (COO)
• Managed the Alta Mesa ISR
project during its period of
production
20
Uranium prices have never been this high at the start of a contracting cycle
Contracting activity and strategy
Boss has entered into two
binding sales agreement to sell
1.8Mlbs U308 to major
European / US power utilities
over 8yrs from 2024 to 2032
Alta Mesa Central Processing Plant, Texas, USA
Honeymoon Processing Plant and Wellfields, South Australia
Boss has ~$274m in liquid
assets and no debt 1
Flexibility
Boss has 1.25Mlbs of strategic
U3081 inventory and diversity of
supply with no jurisdiction risk
-
-
Notes
1. As at 30 June 2024
Boss Energy | An international multi-mine Uranium producer
Strategically remain
under-contracted so early in
the contracting cycle
Strong Balance Sheet has
provided Boss flexibility to
enter into contracts when it
wants to
Strong relationships
Significant upside
-
Entered into two binding
sales agreements
-
First production timed with
strong market fundamentals
-
In constant discussions with
major global utilities
-
Additional contracts will be
layered into a rising market
-
Boss seen as strong
counterparty given strategic
inventory and diversity of
supply with no jurisdiction
risk
-
Boss upside remains significant
as term prices continue to rise
21
Uranium Term prices are trading at 16-year highs ~ US$81/lb U308
4 Key Uranium Industry Considerations
1
Supply is tight
Supply to 2030 is tight across the cycle, and if Russia cuts supply to the US in response
to US sanctions this would put immediate upward pressure on price.
Cost curves going up and development of new mines being pushed out.
Kazakh supply
limited
Supply from Kazakhstan will be more limited to the west as Russia and China take
more supply from this area, logistical issues, and tax changes making material more
expensive to mine.
2
3
Rising long term
price
4
Demand is
increasing
Boss Energy | An international multi-mine Uranium producer
Spot pricing reflects discretionary buying while the rising term price is an indicator of
increasing concern about the supply deficit.
Demand for reliable clean energy is creating new markets for nuclear generation as a
source of supply for data centres, doubling to 1,000 TWh by 2026.
Revival of shut down reactors and life extensions to existing reactors, let alone the
new builds occurring throughout the globe.
22