Quarterly Activities Report - June 2026
Released
Released
Announcement PDF
ASX Release 30 July 2026
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Level 1, 420 Hay Street, Subiaco
Western Australia 600
Matthew Dusci - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
www.bossenergy.com
June 2026 Quarterly Report
FY26 production and cost guidance achieved,
cash and inventory increased
Record production flow for the quarter underpins a strong finish to FY26, with continued
Honeymoon plant and wellfield ramp-up. Accelerated positive technical studies have brought
forward the release of New Feasibility Study and updated JORC MRE, which support a LOM plan.
Highlights
FY26 Performance
• Achieved revised FY26 production guidance with Q4 production of 362klbs U3O8 drummed (up
79% on a rain affected Q3) and FY26 production of 1,407klbs (up 61% on FY25).
• FY26 C1 cost of $39/lb (US$26/lb), AISC of $61/lb (US$41/lb) and total capital expenditure of
$65.9M all within revised guidance.
• Q4FY26 cash and inventory increased by $11.6M and 51klbs respectively, contributing to a total
increase in cash and inventory for FY26 of $13.1M and 172klbs respectively.
• Average realised sale price of $107/lb (US$75/lb) for the quarter. Boss remains strategically
under-contracted, maintaining leverage to a stronger uranium price environment with the
average Term price increasing by 19% (US$15.50/lb) over the past 12 months.
• Balance sheet remains strong with $207.3M in cash and liquid assets, supporting organic funding
of ongoing transition to a wide-spaced wellfield design.
Operations & Infrastructure
• Key infrastructure of columns 4 & 5, East Kalkaroo Trunkline and Wellfield B6 commissioned.
• Completed the accelerated delineation drilling program across all of Honeymoon which will serve
to underpin a more robust MRE.
• Increasing confidence in the wide-spaced wellfield design, with the New Feasibility Study
accelerated and targeted for delivery by the end of August 2026, alongside a program to
accelerate wide-spaced wellfield development, which has already commenced.
• Satellite deposits at Gould’s Dam and Jasons Deposit continue to be accelerated with activity to
gain the relevant permitting and approvals underway.
Corporate & Outlook
• Peter Botten appointed as Non-Executive Director and Chair, effective 30 September 2026.
Existing Chair Wyatt Buck remains as Non-Executive Director.
• An Investor Day is being arranged for September 2026 to outline the Company's production ramp-
up and long-term development strategy.
• FY27 Guidance to be provided at the same time the New Feasibility Study is delivered.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 2
June Quarterly conference call will be held today, Thursday, 30 July 2026, at 9am AWST (11am AEST).
To register and listen in live, please click on the link below:
https://loghic.eventsair.com/515458/894154/Site/Register
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) (“Boss” or “the Company”) is pleased to report an
encouraging quarter which culminated in the Company achieving its revised FY26 production and cost
guidance and accelerating positive technical studies and other programs of work which are expected to
support the future growth of the Honeymoon operation and provide a strong operational foundation
coming into FY27.
June Quarter & FY26 Performance Q4 FY26 Q3 FY26 FY26 Total FY26 Guidance2
Honeymoon Production Mlbs U3O8 0.36 0.20 1.41 1.4-1.45
Honeymoon C1 Cost1
A$/lb 45 60 39 36-40
Honeymoon AISC1
A$/lb 70 93 61 60-64
Sustaining capital A$M 7 5 24 30-33
Project and supporting infra. A$M 14 8 42 30-33
Total capital expenditure A$M 21 13 66 60-66
Alta Mesa Production (100%) Mlbs U3O8 0.045 0.097 0.491 n/a
Sales Mlbs U3O8 0.325 0.325 1.4 n/a
Realised Price1
US$/lb 75 74 74 n/a
Cash and liquid assets A$M 207 211 207 n/a
Notes: (1) AUD/USD Q4: 0.6869; Q3: 0.6845 (2) Updated Guidance, see announcement dated 28 January 2026 titled
“Q2 December FY26 Quarterly Report” and announcement dated 15 April 2026 titled “Honeymoon Update FY26
Production” for details.
Boss CEO and Managing Director, Matthew Dusci, commented:
“The June quarter represents a positive finish to FY26, with Boss delivering its revised production and
cost guidance for the year. This performance is a credit to the Honeymoon team, whose focus and
commitment enabled us to finish the year strongly. While the heavy rainfall in South Australia
significantly disrupted site access and the delivery of essential reagents, the team's response
demonstrated the resilience of our operation.
“While FY26 has been a challenging year for Boss, I am confident in our pathway forward and I look
forward to outlining this in detail to the market with the release of our New Feasibility Study which
supports an updated Life-of-Mine Plan. We have established a strong operating platform with the
processing infrastructure now in place, a proven processing flowsheet, six producing wellfields and a
much stronger understanding of the deposit and the optimal wellfield design. This is reflected in the
delivery of 1.41Mlbs of U₃O₈ drummed at a C1 cost of $39/lb and an AISC of $61/lb. The significant work
programs completed, particularly since Boss committed to investigating the economic applicability of the
wide-spaced wellfield design, are an endorsement of the technical capability and commitment of our
team. I am excited for what this means for Honeymoon over the longer term.
“The Company is in a strong financial position, with a balance sheet comprising $207 million in cash and
liquid assets. Despite FY26 being a capital-intensive year, we increased our cash position by
approximately $13 million and grew our drummed uranium inventory by 172klbs through operating
activities. This demonstrates the underlying strength of the Honeymoon operation and positions us to
continue generating positive operating cash flow ensuring that Boss can organically fund the transition
to the wide-spaced wellfield design.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 3
“We also accelerated the development pathway for our satellite deposits at Gould's Dam and Jasons
Deposit, which host 33Mlbs and 12Mlbs of contained U₃O₈ respectively. Both deposits are considered to
be amenable to wide-spaced ISR mining, placing the Company in a unique position to leverage the existing
Honeymoon infrastructure, processing facilities and permitting pathway. This provides a low-capital,
capital-efficient growth opportunity and a clear pathway to extend production over the longer term.
“I am also pleased to welcome Peter Botten as incoming Chair to the Boss Energy Board, effective 30
September. Peter’s depth of experience in large-scale resource development is highly relevant as we
advance the Honeymoon operation. I would also like to take the opportunity to thank outgoing Chair,
Wyatt Buck, for his instrumental contribution and leadership, and we are fortunate that he will continue
to contribute to the Board as a Non-Executive Director. I look forward to working closely with Peter as we
deliver the New Feasibility Study and continue to unlock the full potential of the Honeymoon operation.”
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 4
Honeymoon Safety Performance
The Total Reportable Injury Frequency Rate (TRIFR1
) increased during the quarter to 19.7, which included
two Lost Time Injuries during the quarter. While this outcome is disappointing, the health and safety of
our people remains a high priority. Management continues to maintain a strong focus on safety
performance, including being a KPI for all team members.
Table 1: Honeymoon TRIFR (12-month moving average)
Quarter ended Q4 FY26 Q3 FY26
TRIFR 19.7 16.6
Honeymoon Production Results
Production for Q4 FY26 was 362klbs U3O8 drummed (up 79%), against a rain affected prior quarter. The
lift in production reflected increased flow of 3.5M cubic metres (up 83%). This represented record flow
for a quarter, which was enabled by the ongoing commissioning of production infrastructure, including:
• NIMCIX Columns 4 & 5 and associated pumping infrastructure.
• East Kalkaroo trunkline.
• The first Far East Kalkaroo production wellfield (B6) which is performing in line with
expectations.
These milestones continue to de-risk the production ramp-up, increasing our confidence in the ongoing
performance of the Honeymoon operation and its amenability to the wide-spaced wellfield design.
Table 2: Operational physicals
Quarter ended Unit Q4 FY26 Q3 FY26 FY26
Wellfields online # 6 5 6
NIMCIX Columns online # 5 3 5
IX Flow (total) (m3
) 3,542,193 1,939,494 10,106,084
PLS to IX tenor (U3O8 mg/l) 49 53 63
IX Recovery (%) 96.1 97.8 97.2
IX Production (total)1
(lbs) 371,198 220,952 1,374,182
U3O8 Drummed (total) (lbs) 362,152 202,781 1,406,634
The small decline in tenor followed expected wellfield tenor declines whilst wellfields remain online. This
decline was accentuated by sub-optimal lixiviant chemistry in early-April 2026 due to rain-interruptions
of reagent deliveries in March 2026.
For Q1FY27, it is expected that average tenor will record a similar decline as was recorded from Q3FY26
to Q4FY26 with total flow to be consistent with Q4FY26.
The IX Recovery declined by 1.7 percentage points during the quarter which was mainly attributed to
commissioning of NIMCIX columns 4 and 5 as well as cycle time adjustments to counter reagent
disruptions. Note that PLS to IX Recovery is primarily a measure of recovery efficiency rather than
potential metal lost. That is, most of the uranium that does not get recovered over a given period is
pumped in a closed circuit and recovered when it is flowed back through the NIMCIX columns.
1 Total Reportable Injury Frequency Rate (TRIFR) measures the rate of restricted work injuries (RWIs), medical treated injuries (MTI) and lost
time injuries (LTIs) that occur per million hours worked.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 5
During the quarter, Boss commenced airlifting (injecting compressed air into a well) and role reversals
(switching injector and extractor well roles) for some of the earlier wellfields that remain online. Results
have been positive in increasing flow and grade and demonstrates the strong flow rates at Honeymoon
which underpin the wide-spaced wellfield design.
Honeymoon Costs
Pleasingly, Boss has met its revised FY26 cost guidance.
• C1 cost of $39/lb (US$26/lb) was at the upper end of the $36-40/lb (US$24-26/lb) guidance range,
as previously advised.
• AISC of $61/lb (US$41/lb) was at the lower end of the $60-64/lb (US$40-42/lb) guidance range
primarily due to an underspend on wellfields sustaining capital ($24M as compared to guidance
of $30-33M) as Boss remained disciplined on wellfields capital while the New Feasibility Study was
being developed.
• Total capital expenditure of $66M was at the upper end of the $60-66M range. Project and
supporting infrastructure spend of $42M was above the guidance range of $30-33M primarily due
to a greater than anticipated cost to complete the NIMCIX columns. With this project now
substantially complete, Boss has materially improved its understanding of scope, cost and delivery
requirements for NIMCIX Column 6.
For the June quarter, Boss recorded a decrease in C1 cost and AISC from $60/lb and $93/lb in Q3FY26 to
$45/lb (down 25%) and $70/lb (down 25%) respectively in Q4FY26. In the main, the substantial fall in
quarterly operating costs is due to the return to uninterrupted operations following the impacts of the
significant rainfall during the March quarter.
Table 3: Production and Capital Costs
Key Metric Unit
Q4 FY26 Q3 FY26 FY26
AUD USD AUD USD AUD USD
C1 Cash Cost $/lb 45 31 60 41 39 26
All In Sustaining Cost (AISC) $/lb 70 48 93 64 61 41
Capital expenditure
Sustaining $m 7 5 5 3 24 16
Project and Supporting Infrastructure $m 14 10 8 5 42 28
Total Capital Expenditure $m 21 15 13 9 66 44
Notes: (1) AUD/USD Q4: 0.6869 Q3: 0.6845.
Sustaining capital spend for the quarter mainly reflected construction and first fill costs of B6, HMT1 and
EKT1. Project and supporting infrastructure for the quarter mainly comprised the completion costs of
NIMCIX columns 4 & 5 and the East Kalkaroo trunkline.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 6
Balance Sheet
Boss has increased cash by $13.1M during FY26 whilst accumulating an additional 172klbs U3O8 drummed.
This is a pleasing result during a year of transition and consistent with FY26 guidance of Boss being
cashflow positive for the financial year.
Boss finished the quarter in a strong financial position with no debt and $207M of liquid assets (being
cash, liquid investments and physical U3O8 drummed), a decrease of $4M from Q3FY26. Key movements
included:
• Cash increased by $11.6M due mainly to an increase in cash receipts from uranium sales of
$45.2M (including receipt of $11.1M receivable from a sale in the prior quarter). Cash receipts
were partially offset by operating costs of $15.2M, capital expenditure of $14.9M, and net other
costs of $3.5M. Further detail is provided below.
• Investments declined by $7.5M due to marked to market losses on listed investments.
• Inventory on hand increased by $3.0M as an additional 51klbs U3O8 drummed was accumulated.
• Trade receivable of $11.1M was received during the quarter.
Table 4: Cash, inventory and investments
Notes: (1) Inventory on hand reflects drummed U3O8 valued at the lower of cost and net realisable value.
The waterfall chart below highlights the June quarter movements in cash.
Figure 1: June Q4 FY26 Cash (A$000’s)
A$000’s Q4FY26 Q3 FY26 QoQ ($)
Cash on hand 49,671 38,024 11,647
Investments and other liquid assets 41,369 48,876 (7,507)
Inventory on hand1
116,272 113,280 2,992
Trade receivable - 11,111 (11,111)
Total cash and liquid assets 207,311 211,291 (3,979)
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 7
Sales, Loans and Inventory
During the quarter, Boss recorded $34.8M (US$24.4M) of sales for 325klbs at an average realised price of
$107.1/lb (US$75.1/lb).
Boss now holds a total of 1,581klbs of inventory on hand which reflects accumulation of an additional
172klbs during FY26.
Table 5: Sales, Loans and Inventory
Key Metric Unit Q4 FY26 Q3 FY26 FY26
Sales and loan repayments US$000’s 24,421 23,906 111,541
Sales and loan repayments A$000’s 34,809 34,447 166,554
Sales lbs 325,000 325,000 1,400,000
Loan repayment lbs - - 100,000
Average realised price US$/lb 75.1 73.6 74.4
Average realised price A$/lb 107.1 106.0 111.0
Inventory on hand lbs 000’s 1,581 1,530 1,581
Boss expects to achieve an average realised sales price in Q1FY27 of circa US$80-82/lb which includes
sales of ~300klbs to two utilities under existing contracts. Boss is encouraged by the continued increase
in the average Term price which has increased by 19% (US$15.50/lb) over the past 12 months and 4%
(US$4/lb) over the past quarter. The increase in the average Term price is supporting the current Spot
price which has seen limited activity over the past quarter given typical seasonal activity during the
Northern Hemisphere summer.
Honeymoon Construction Activities
In FY26 Boss completed commissioning of key infrastructure including NIMCIX columns 4 & 5, the East
Kalkaroo trunkline and wellfields B4, B5 and B6. With substantial investment in processing infrastructure
now mostly complete, future capital spend will be mainly on wellfields which will have a more immediate
return.
The completion of this infrastructure also marks the substantial finalisation of a complex operating period
with parallel operations and construction. There are many learnings and internal capability acquired
during this period which could be applied to the development of its satellite deposits, subject to positive
feasibility studies and capital approvals.
The focus for the upcoming quarter will be accelerating the construction of future wellfields under the
wide-spaced wellfield design. This acceleration follows a period of restraint, during which Boss has not
initiated construction of any wellfields under the previous design since December 2025. It reflects
management’s increasing confidence that the wide-spaced wellfield design represents the optimal
pathway forward to support future production. The Company is also currently finalising a capital proposal
to complete NIMCIX column 6 in conjunction with the completion of the updated JORC MRE and LOM
plan.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 8
Figure 2: Wellfields Map (Honeymoon)
Specific wellfield priorities for the quarter will be:
• Completing construction of EKT1: This was the first full wellfield trial under the wide-spaced
wellfield design. It is expected to commence flushing in August 2026. This wellfield will have 16
five-spot patterns with an injector to extractor spacing of 60m and an injector-to-injector spacing
of 85m.
• Commencement of construction on EKT2: This wellfield will have 16 five-spot patterns with an
injector to extractor spacing of 50m and an injector-to-injector spacing of 70m.
From these trial wellfields in East Kalkaroo, Boss will further improve its understanding of flushing times,
permeability, and leaching. Whilst wellfield B6 was designed based on an existing wellfield design
(five-spot pattern with injector to extractor spacing of 30m and injector to injector spacing of 42m), it has
provided meaningful data that continues to inform the New Feasibility Study.
Drilling and Exploration Activities
During the quarter, Boss completed a significant delineation drilling program at Honeymoon, aimed at
enhancing the understanding and planning of future wellfields, while continuing to invest in production
wells to support future production. Overall drilling activity completed at Honeymoon during FY26
included:
• Delineation drilling consisting of 50,645m rotary mud holes, 1,749m of aircore holes and 320m of
core holes.
• Production drilling consisting of 10,940m of production wells and 2,339m of monitor wells.
The increased delineation drilling, alongside the expected MRE update will provide a greater level of
certainty when planning future wellfields.
Limited greenfield exploration activities were completed during the quarter as the focus remained on
delineation and production well drilling.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 9
Growth Activities – Gould’s Dam and Jasons Deposits
Boss has continued the acceleration of the development and permitting of its satellite deposits at Gould’s
Dam and Jasons Deposit.
The technical work completed as part of the Honeymoon New Feasibility Study is now being integrated
into the evaluation and development of both satellite deposits. The Company's improved understanding
of Honeymoon, together with its understanding of the wide-spaced wellfield design, is considered to be
a key enabler for the future development of Gould's Dam and Jasons Deposit. This work has the potential
to materially improve project economics through lower capital intensity, reduce wellfield development
requirements and lower operating costs by leveraging the existing Honeymoon processing infrastructure
and operating platform.
Key activities completed in the quarter include:
• Design of the proposed trunkline connecting Jasons Deposit with the Honeymoon processing
plant.
• Progression of the ecological groundwater and radiological environmental baseline studies.
• Preparation of the Jasons Deposit EPBC referral documentation.
Key activities that are nearing completion include:
• Ecological, groundwater and radiological baseline data collection, modelling and assessment.
• Initial stakeholder engagement.
• Initial impact assessments.
The first of the FY27 resource delineation drilling programs will commence at Jasons Deposit in Q1FY27.
This program consists of 100 rotary mud drill holes and 15 core drill holes for a total of 10,000m and
1,500m respectively. The drilling, on a spacing of 140m, is designed to convert currently unclassified
mineralisation to Inferred with the aim of increasing the Mineral Resource and defining the extent of
mineralisation for wellfield design and project description.
New Feasibility Study: Wide-Spaced Wellfield Design
Based on a significant volume of technical work completed to date, the Company continues to gain
confidence that the wide-spaced wellfield design builds upon existing operational viability, but critically,
has the potential to improve project economics as Boss steps out into the lower-grade areas of the
resource.
The substantial progress made across the Company's operational workstreams over the past six months
has provided comprehensive additional information that builds on a large operational dataset gathered
from current and existing operations thereby supporting a higher confidence outline for future operations
at Honeymoon. On this basis, Boss has determined to proceed directly to a feasibility-level outcome rather
than producing two study documents within a short period, as previously proposed. This decision enabled
Boss to bring forward the targeted release of its New Feasibility Study and updated Life-of-Mine Plan for
Honeymoon.
The New Feasibility Study and updated Life-of-Mine Plan, accompanied by an updated JORC Mineral
Resource Estimate for the Honeymoon deposit, is now targeted to be released at the end of August 2026,
earlier than the original target date of the end of September 2026.
Boss intends to hold an Investor Day in September 2026 whereby relevant management and technical
team members will detail the work performed as results from the New Feasibility Study. The Investor Day
will also set out the programs of work underway to bring Gould’s Dam and Jasons Deposit into production,
including relevant studies and permitting work being undertaken.
Any incremental capital requirements to support the revised life-of-mine plan are expected to be funded
organically.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 10
Alta Mesa Joint Venture (Boss 30% / enCore Energy Corp 70%)
Production during the quarter from the Alta Mesa operation, a joint venture with enCore Energy Corp
(NASDAQ: EU; TSXV: EU) (enCore), totalled 45klbs U3O8 drummed compared to the previous quarter's
production of 97klbs U3O8 drummed (on a 100% basis), a decrease of 52klbs. Boss received 13klbs U3O8
drummed reflecting its 30% pro rata share of shipped production, a 22klbs decrease from the prior quarter
of 35klbs U3O8 drummed. The decline in production is attributed to permitting delays at the state level
(Texas Commission on Environmental Quality), resulting in production delays as new wellfields are not
brought on in time to make up for production declines in existing wellfields.
FY27 Guidance
FY27 Guidance will be provided at the same time as the New Feasibility Study, at the end of August 2026.
Corporate
Boss recently announced the appointment of Mr Peter Botten as an Independent Non-Executive Director
and Chair of the Company, effective 30 September 2026.
Mr Botten is a highly respected business leader with more than 45 years of experience in the energy and
resources sectors. He is best known for his leadership of Oil Search Limited, where he served as Managing
Director and CEO for more than 25 years and led the company through a period of significant growth,
including the development of the PNG LNG Project, one of the largest resource developments in the Asia-
Pacific region.
Current Chair Mr Wyatt Buck will remain Chair of Boss Energy until the commencement of Mr Botten,
after which he will transition to the role of Independent Non-Executive Director.
Boss also announced the retirement Ms Jan Honeyman as Independent Non-Executive Director, effective
30 June 2026. Ms Honeyman had served on the Board for four years, including as Chair of the Human
Resources Committee. During her tenure, she has made significant contributions to the development of
the Company’s remuneration framework, as well as providing guidance on talent acquisition and people
management.
Appendix 5B Disclosures
In line with its obligations under ASX Listing Rule 5.3.5, Boss notes that the only payments to related
parties of the Company, as disclosed in the Appendix 5B (Quarterly Cashflow Report) for the quarter
ended 30 June 2026, consist of executive director and chief financial officer salaries and wages (including
superannuation) and payment of non-executive director fees.
During the quarter ended 30 June 2026, the Company spent approximately $24.6M on project and
exploration activities relating to its Honeymoon and Alta Mesa Projects. These activities included:
• Technical studies costs
• Construction equipment
• Wellfield drilling and development costs
• Engineering and construction expenses
• Mineral exploration and evaluation costs
In addition to these activities the Company continued to incur costs relating to the ongoing maintenance
activities required at Honeymoon. The expenditure represents direct costs associated with these activities
as well as capitalised wages which can be directly attributable to Honeymoon.
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 11
This ASX announcement was approved and authorised by the Board of Boss Energy Limited.
For further information, contact:
Matt Dusci
Managing Director and Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
ASX: BOE OTCQX: BQSSF www.bossenergy.com Page 12
Forward-Looking Statements
This announcement contains certain forward-looking statements provided by or on behalf of Boss with
respect to potential future matters. Forward-looking information may include, without limitation,
statements regarding plans, strategies and objectives of Boss, production and financial guidance, financial
forecasts, estimates of project milestones and timing and expected costs or production outputs. In some
cases, forward-looking information can be identified by terms such as “may”, “will”, “should”, “expect”,
“plan”, “anticipate”, “believe”, “intend”, “estimate”, “predict”, “potential”, “continue” or other similar
expressions concerning matters that are not historical facts. Guidance as to production, unit costs and
capital expenditure is based on assumptions, budgets and estimates existing at the time of assessment
which may change over time impacting the accuracy of those estimates. These estimates are developed
in the context of an uncertain operating environment including in respect of inflationary macroeconomic
conditions, and uncertainties surrounding the risks associated with mining and the further review of the
EFS which may impact production and have a flow on effect on sales. Actual results may therefore vary
significantly depending on these risks and the timing required to address them. All information is provided
as an indicative guide to assist sophisticated investors with modelling of the Company. It should not be
relied upon as a predictor of future performance.
Forward-looking statements reflect Boss’s expectations at the date of this announcement, however they
are not guarantees or predictions of future performance or statements of fact. Forward-looking
information involves known and unknown risks, uncertainties and other factors (many of which are
beyond the control of Boss and its directors and management) which may cause the actual results,
performance or achievements of Boss and its business to be materially different from any future results,
performance or achievements expressed or implied by the forward-looking information. Accordingly,
undue reliance should not be placed on forward-looking information.
The forward-looking statements in this announcement reflect various assumptions by or on behalf of Boss
(which assumptions may prove to be inaccurate). Accordingly, this is another reason why such statements
are subject to significant business, technical, legal, economic and competitive and other uncertainties and
contingencies and other factors which may be beyond the control of Boss which could cause actual results
or trends to differ materially from the forward-looking statements in this announcement, including but
not limited to differences or inaccuracies arising from price and currency fluctuations, geotechnical
factors, geological and mining factors, estimated continuity of mineralised horizons, metallurgical and
processing factors, sales factors, drilling and production results, development progress, operating results,
mineral resource estimates, legal issues, legislative, fiscal and regulatory developments, economic and
financial market conditions in various countries, approvals and cost estimates, environmental risks, ability
to meet funding requirements, share price volatility, uranium markets and other matters. Accordingly,
there can be no assurance that such forward-looking statements and projections will be realised.
Boss makes no representations as to the accuracy or completeness of any forward-looking statements or
projections or that any forecasts will be achieved. Additionally Boss makes no representation or warranty,
express or implied, in relation to, and (to the maximum extent permitted by law) no responsibility or
liability (whether for negligence, under statute or otherwise) is or will be accepted by Boss or by any of its
officers, directors, shareholders, partners, employees, or advisers as to or in relation to the accuracy or
completeness of the information, statements, opinions or matters (express or implied) arising out of,
contained in or derived from this announcement or any omission from this announcement.
Boss does not undertake or accept any obligation or undertaking to release publicly any updates or
revisions to any forward-looking statements to reflect any change in Boss’s expectations or any change in
events, conditions or circumstances on which any such statement is based, except as required by law.
Mineral Resource estimates are necessarily imprecise and depend on interpretations and geological
assumptions, minerals prices, cost assumptions and statistical inferences (and assumptions concerning
other factors, including mining, process