Production and Sales update at
Resources Rising Stars
Boss Energy Limited (ASX: BOE; OTCQX: BQSSF) will be presenting at the Resources Rising Stars
conference on 10 April 2025. Given the recent disclosure of actual and forecast production results at the
analysts Honeymoon site tour on 26 March 2025, Boss Energy now provides actual production and sales
results for the quarter ended 31 March 2025. Further details on costs will be provided in the March 2025
quarterly report, scheduled to be released on Tuesday, 29 April 2025.
Boss Managing Director Duncan Craib said: “Strong uranium production from the Honeymoon operation
was delivered during the quarter. This totalled 295.8k lbs drums produced, representing a 116% increase
from the prior quarter. The operation ramp-up is continuing to plan as we look forward to meeting our
guidance of 850,000 lbs for year to June 30.”
“We also achieved strong sales of product during the quarter of 268,000 lbs of uranium at an average
sales price of USD$84/lb which has generated USD$22.4M of cash. Uranium inventory on hand at
March 31 was 1.12M lbs.”
Production
Boss remains on track to deliver 850,000 lbs of U3O8 drummed for the financial year ended 30 June 2025.
During the quarter Boss produced 246,869 lbs IX production and 295,819 lbs U3O8 drummed which
represents growth of 31,550 lbs (15 per cent) in IX production and 158,735 lbs (116 per cent) in U3O8
drummed.
Table 1: Operational physicals for the December 2024 Quarter as compared to the September Quarter 2024
Key Metric Quarter ended
Unit
March Q3 FY25
December Q2 FY25
3
2
3
2
1,088,704
861,204
(U3O8 mg/l)
108
116
IX Recovery (weighted average)
(%)
95.5
97.8
IX Production (total)1
(lbs)
246,869
215,319
U3O8 Drummed (total)
(lbs)
295,819
137,084
Wellfields online
IX Columns operational
IX Flow (total)
1
PLS to IX tenor (weighted average)2
(m )
3
Notes: (1) Conversions: There are 1,000 litres per m3 and 0.00000220462 lbs per mg.
(2) the tenors being achieved from initial wellfields exceed the average LOM tenors forecast in the Feasibility Study
should not be extrapolated across the LOM.
FOR FURTHER INFORMATION PLEASE CONTACT:
Boss Energy Limited
ABN 38 116 834 336
Duncan Craib - Managing Director/ CEO
+61 (08) 6263 4494
ASX: BOE
OTCQX: BQSSF
Level 1, 420 Hay Street, Subiaco
Western Australia 6008
Paul Armstrong – Public Relations
+61 (08) 9388 1474
www.bossenergy.com
@Boss_Energy
During the quarter, U3O8 drummed exceeded IX production as a portion of the inventory accumulated in
previous quarters was processed through the drying and packing stage during the quarter.
A number of key milestones were delivered during the quarter as part of the ramp-up plan including
bringing in production from Wellfield B3 and commencing operations from IX Column 3 towards the backend of the quarter. Kiln 2 was also commissioned and became operational during the quarter.
During the quarter there were some commissioning challenges with the kiln and baghouse (which form a
part of the drying and packing stage) resulting in some unplanned downtime during the quarter. These
challenges continue to be resolved but are not expected to impact Boss’ guidance target of 850,000 lbs
U3O8 in FY 2025.
Despite the challenges noted above, Boss delivered record production during February of 123,188 lbs
U3O8 drummed which represents an annualised run-rate of ~1.5M lbs. This provides Boss confidence on
delivery of the ramp-up plan as we test the plant capability.
Sales and loan repayments
During the quarter, Boss received USD$22.4M in cash, related to a sale of 150k lbs to a utility customer
and the repayment of half of the loaned material to enCore Energy Corp (enCore), plus interest of 9 per
cent on the total loaned material to enCore of 200,000 lbs.
Table 2: Uranium sales data for the quarter ended 31 March 2025
3Q25
Volume
Cash received
Unit
Sales
Loan repayment
lbs
150,000
118,000
USD/lb USD (000’s)
70
10,525
101
11,864
Total / Weighted Average
268,000
84
22,389
The remainder of the material loaned to enCore (100,000 lbs), plus interest of 9 per cent, will be repaid
by 27 June 2025 at the equivalent of USD$101/lb, equating to a total repayment of
USD$10,353,967.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy
Limited.
For further information, contact:
Duncan Craib
Chief Executive Officer
P: +61 (8) 6263 4494
E: boss@bossenergy.com
ASX: BOE
OTCQX: BQSSF
For media enquiries, contact:
Paul Armstrong
Read Corporate
P: +61 (8) 9388 1474
E: info@readcorporate.com
www.bossenergy.com
@Boss_Energy
A global multi-mine Uranium producer
First mover advantage in a rising Uranium market
Resources Rising Stars Presentation
10 APRIL 2025
ASX: BOE | OTCQX: BQSSF
bossenergy.com
Boss remains well positioned in a volatile market
Resilient with first mover advantage
Strong Balance Sheet
Strong Uranium Price
Production on Track
Tariff Exempted
•
$252 million in cash and liquid assets, ~57% of capital raised.
Of this, $65 million is held in cash.1
•
Boss has no requirement for external capital and does not have debt.
•
The U3O8 Term Price is at an all time high in AUD terms (AU$127/lb).2
•
Q3 2025 blended uranium sales price achieved of AUD 134/lb or USD
84/lb U3O8
•
Production: On track to meet production guidance of 850k lbs in FY25.
•
Cost: On track3 to meet 2H25 C1 cost guidance of AUD37-41/lb
(implying C1 margin of 68%-71% based on Term Price).
•
U3O8 on the Annex II list of the Executive Order4 which exempts uranium
ores, concentrates, metals and compounds from additional tariffs.
Notes:
1. As at 31 December 2024
2. Source: UxC, LLC, RBA (AUD/USD 0.628 as at 31 March 2025)
3. Based on actual costs to 28 February 2025
4. https://www.whitehouse.gov/presidential-actions/2025/04/regulating-imports-with-a-reciprocal-tariff-to-rectify-trade-practices-that-contribute-to-large-and-persistent-annual-united-states-goods-trade-deficits/
Boss Energy | A global multi-mine Uranium producer
2
An International multi-mine ISR producer in Two tier One locations
Global Uranium Platform in Tier 1 Locations
Honeymoon (100% ownership)
2.45Mlbs U308 p.a.
South Australia
Alta Mesa (30% ownership)
1.5Mlbs U308 p.a.
Shipped and cash received
Texas
Drummed and delivered
Alta Mesa Project
Uranium friendly state
250K lbs U308 shipped
~US$53.5M cash received
Uranium friendly state
64K lbs U308 delivered
IX process proven
Ramp up per schedule
Proven management team
Exceptional drilling results
Key metrics already exceeding
Feasibility Study forecasts
Ramp up to 2.45Mlb/annum
proceeding to plan
Some of the most experienced ISR
and IX operators in the USA
Significantly exceeds the cutoff grade
required for ISR
Boss Energy | A global multi-mine Uranium producer
3
An International multi-mine ISR producer in Two tier One locations
With a pipeline of growth opportunities
Boss Energy - Australian exploration
19.4% Shareholder of Laramide Resources
Queensland & Northern Territory
United States & Kazakhstan
South Australia
Northern Territory
• Uranium friendly state
• Uranium friendly state
• Uranium friendly state
• Uranium friendly jurisdictions
• Completed infill drilling at for
the Gould’s Dam and Jasons
satellite deposits
• Earn-in agreement with the
Eclipse Group for the
Liverpool Uranium Project in
the highly prospective
Alligator Rivers Uranium
Field
• Flagship asset is the
Westmoreland Uranium Project;
one of the largest and highestquality uranium development
projects in Australia ~ MRE of
65.8M lbs U3082
• Churchrock-Crownpoint ISR
uranium project in New Mexico
• Agreement has been
structured so Boss can
systematically progress the
work through a number of
stages and decision points
before expenditure
commitments
• Murphy Project is comprised of
strategically located uranium
tenements over 683 km2 in the
Northern Territory
• Consultants engaged to produce
a mineral resource update for
the Gould’s Dam and Jasons (Q3
FY2025)
• Continue to generate
exploration targets around the
Honeymoon operation, aimed at
identifying high-priority targets
that could represent additional
undiscovered resources
• La Sal Project, a conventional
hard-rock asset in Utah
• La Jara Mesa ISR Project in New
Mexico
• Large greenfield uranium
exploration opportunity in
Kazakhstan featuring a 6,000
km2 land position in prolific
Chu-Sarysu Basin.
Note: (2) Refer to Laramide’s ASX Announcement “Laramide MRE Update for Westmoreland Uranium Project (amended)” released on 7 March 2025
Boss Energy | A global multi-mine Uranium producer
4
Building mines takes time….
Honeymoon took half a century from discovery to being a commercially viable mine…
Honeymoon Uranium Mine History
Boss Energy | A global multi-mine Uranium producer
5
Honeymoon remains on track to deliver 850Klbs in FY2025
Honeymoon Highlights
Key ramp up
milestones delivered
Strong Financial
Position
Further ramp up
and growth
initiatives underway
• 295,819 lbs of U3O8 drummed (up
116% from December quarter) and
246,869 lbs IX production (up 15%)
•
•
Remain on track to deliver 850k lbs
of U3O8 drummed in FY2025
•
Wellfield 3 commissioned and in
use
•
Progressing initiatives to further
derisk production ramp up
•
Material inventory on hand of 1.21
million lbs2 U3O8
• NIMCIX column 3 ramping up;
Columns 1 and 2 operating at
nameplate capacity
•
• Kiln 2 commissioned and operating
• Commercial production declared,
effective 1 January 2025
$252 million in cash and liquid assets1,
representing 57 per cent of capital
raised. Of this, $65 million is held in
cash2
Received cash for 268,000 lbs in March
quarter at a realised price of USD84/lb
(previous quarter 200,000 lbs at
USD77.5/lb)
•
Continued disciplined approach to
contracting with ~85% of Honeymoon
product remaining uncontracted
•
2H FY25 C1 cost guidance set at
$37-41/lb (USD $23-25/lb)
Notes
1. As at 31 December 2024
2. As at 31 March 2025
Boss Energy | A global multi-mine Uranium producer
6
Strong quarterly production growth keeps Boss on track to meet guidance
Production Results
Thousands
HONEYMOON QUARTERLY PRODUCTION
HONEYMOON PRODUCTION (3Q25)
lbs (000’s)
350
• Delivered strong quarterly growth in U3O8 drummed of 159k
lbs (116%) and growth in IX production of 32k lbs (15%) as
compared to the December 2025 quarter.
300
• Remain on track to deliver 850k lbs U3O8 drummed for FY25
250
• U3O8 drummed exceeded IX production as inventory
accumulated in previous quarters was processed through
increased drying and packing capacity.
200
• Commissioning of the kiln and baghouse (as part of the
drying and packing area) took longer than expected during
the quarter. These challenges are being resolved and not
expected to impact ramp up targets.
150
100
• Despite noted commissioning challenges, record production
during February of 123k lbs drummed represents an
annualised run-rate of ~1.5m lbs
50
0
4Q24
1Q25
IX Production
Boss Energy | A global multi-mine Uranium producer
2Q25
3Q25
U3O8 Drummed
7
NIMCIX Columns:
#1 & 2 operating at namplate
#3 commenced production March 2025
#4 & 5 being installed, to be commissioned Q3 2025
Boss Energy | A global multi-mine Uranium producer
8
Construction ahead
of schedule
Honeymoon Current Wellfield
Configuration
Wellfields
#B1 & 2 in production
Brooks Dam
Honeymoon
#B3 started production March 2025
#B4 scheduled for production 1QFY26
#B5 scheduled for production 2QFY26
#B6 scheduled for production 3QFY26
East Kalkaroo
Boss Energy | A global multi-mine Uranium producer
9
Exploration focussed on increasing production rate and mine life
Exploration
Boss Energy | A global multi-mine Uranium producer
“These satellite deposits have the potential to drive
growth as well as enabling us to leverage existing
infrastructure and further capitalise on the opportunity
presented by growing global demand for uranium from
tier-one locations”
10
ALTA MESA
Boss Energy | A global multi-mine Uranium producer
11
Alta Mesa continues to ramp up to nameplate capacity of 1.5 million pounds
Alta Mesa Highlights
Key ramp up
milestones delivered
Current production
update
Further ramp up
and growth
initiatives underway
•
•
Uranium capture of 50,000 lbs U3O8
uranium realised between March 6 and
March 31, 2025; (Boss’ share of this
production is 30 per cent)
•
•
Average daily capture rate for the last
26 days of March 2025 in excess of
1,900 pounds of uranium per day; the
highest rate since the plant returned to
operations in June 2024
Alta Mesa is ramping up to an
annualised production rate of 1.5
million pounds U3O8 (of which Boss
is entitled to 30%, to sell as its own
inventory, unencumbered)
•
Alta Mesa Project, which consists
of over 200,000 acres plus the
central processing plant and
wellfields, is managed by
experienced uranium producer,
and partner, enCore
•
Progressing initiatives to further
derisk production ramp up
•
•
Grand opening celebration of the
Alta Mesa Uranium Plant with
George W. Bush, the 43rd President
of the United States, 8th October
2024
Alta Mesa’s first IX circuit is
operating at nameplate capacity,
with the second IX circuit
commencing production in March
2025 and the third IX circuit
planned to be online in 2026
Wellfield solution head grades at
Alta Mesa peaked at approximately
140 mg/l U3O8 and averaged
approximately 65 mg/l U3O8
Boss Energy | A global multi-mine Uranium producer
•
Acceleration of enCore’s August 2025
contract delivery requirements to May
2025 due to the improved uranium
capture at the Alta Mesa
12
Market Update
Market and Sales update
Q3 2025 blended uranium sales price achieved of AUD 134/lb or USD 84/lb U3O8
3Q25 Cash Receipts
Sales
Loan repayment2
Volume
lbs
150,000
118,000
Cash received
USD (000’s)
10,525
11,864
Total
268,000
22,389
Cash per pound
USD
AUD1
70
112
101
161
84
134
Notes:
(1) Represents AUD equivalent based on average 3Q25 AUD/USD of 0.6240
(2) Loan repayment reflects repayment of 100,000 loaned to enCore Energy and includes
interest of 9% on the full amount of the loan (200,000 lbs)
•
Uranium noted as exempt from tariffs into the US
•
Other development projects are delaying FID until higher incentive prices
are achieved to finance their mines
HISTORICAL U3O8 Spot and Term Price (AUD NOM)
AU$
180
160
140
120
100
80
•
Spot uranium price declines reflect broader financial sentiment, as buyers
and sellers retreat amid geopolitical and trade uncertainties impacting the
near-term nuclear fuel market.
60
•
Utilities delay long-term purchases, awaiting clearer trade policies, while
sellers pause major marketing efforts due to uncertainty over potential
duties or tariffs.
20
•
Utilities poised to re-enter the market, with contracting demand
accumulating due to prolonged uncertainty. Market participants describe
the current state as “market paralysis”.
Term price (which represents ~85% of volume
traded) is at an AUD all time high
40
0
May-04
May-07
May-10
U3O8 Spot Price
May-13
May-16
May-19
May-22
U3O8 Long-Term Price
Source: UxC, LLC, RBA
Boss Energy | A global multi-mine Uranium producer
14
Contracting activity & strategy
Uranium prices have never been this high at the start of a contracting cycle
Boss has entered into
binding sales agreement to
sell 3.5Mlbs U308 to major
European / US power
utilities over 8yrs from 2024
to 2033
Exposure to price increases
supported by ~$252m in
liquid assets and no debt1
Strategic inventory plus
diversity of supply with no
jurisdiction risk
Flexibility
Strong Relationships
Significant upside
•
Strategically retain
exposure to spot price
and market upside
•
Entered into three
binding sales
agreements
•
First production timed
with strong market
fundamentals
•
Strong Balance Sheet
has provided Boss
flexibility to enter into
contracts when it
wants to
•
In constant
discussions with major
global utilities
•
Additional contracts will
be layered into a rising
market
•
Boss seen as strong
counterparty given
strategic inventory
and diversity of supply
with no jurisdiction
risk
•
Boss upside remains
significant as term prices
continue to rise
Notes
1. As at 31 December 2024
Boss Energy | A global multi-mine Uranium producer
15
Appendices
Strong financial position with $252 million in cash and liquid assets
Financial Position
•
•
•
•
Balance Sheet remains robust with circa $252
million in cash and liquid investments on hand and
no debt. An increase of $6.7 million since
September quarter
Sold 200,000 lbs during the quarter at a realised
price of US$77.50
Commercial production declared will result in
production accounting from
1 January onwards
Existing cash and liquid investments will fully
support ramp up with no requirement for any
external capital or debt
Quarter ended
Unit
Sales
Lbs
December
September
200,000
200,000
Realised price
US$/lb
77.5
78.0
Revenue
US$
15,500,000
15,608,000
Cash on hand
A$ (000’s)
65,177
66,551
Inventory on hand1
A$ (000’s)
117,279
114,861
Loan receivable
A$ (000’s)
34,808
30,560
Investments and other liquid assets
A$ (000’s)
34,382
32,931
Total cash and liquid investments
A$ (000’s)
251,646
244,903
Notes:
1. Inventory includes strategic inventory and inventory on hand. Excludes inventory ‘in circuit’ e.g. IX
production
Boss Energy | A global multi-mine Uranium producer
17
Cost guidance for 2H25 indicates a high margin business competitively positioned on the cost
curve
Guidance
Cash cost expected to reduce in future years as fixed costs
are fractionalised by increased production
2H FY2025
Honeymoon Guidance1
(AUD)
(USD)2
Lbs (000’s)
625
625
Cash Cost – Fixed
$/lb
22-24
14-15
Cash Cost – Variable
$/lb
15-17
9-10
Cash Cost – Total
$/lb
37-41
23-25
Capex – Wellfields
$m
17-20
11-12
Capex – Capital Projects
$m
19-21
12-13
Capex – Other sustaining capital
$m
1-2
1-2
Capex - Total
$m
38-43
24-26
Production
Cash cost for 2H25 reflects an increase approximately inline with inflation since the EFS was completed- reinforcing
strong technical feasibility work
Wellfields capex represents cost to bring on wellfields that
are expected to come online through to the end of
FY2026. Costs also increased approximately inline with
inflation since EFS completed
Project capex represents most of the cost to complete the
Project phase which mostly represents columns 4-6. Cost
has increased mainly due to increased labour cost and
inflation
Boss Energy | A global multi-mine Uranium producer
Unit
Notes:
1. Guidance is for Honeymoon only and excludes Alta Mesa with definitions of costs
consistent with EFS. Refer to Appendix 3 for definitions (2) AUS/USD of 0.62 used
18
Honeymoon Resource Table
HONEYMOON JORC EXPLORATION TARGETS AND MINERAL RESOURCE
The information in this Presentation relating to the Enhanced Feasibility Study (EFS) is extracted from the announcement
entitled ‘Updated Feasibility Study identifies lower costs and increased financial returns’ dated 21st June 2021. Boss Energy
confirms that all the material assumptions underpinning the production targets, and forecast financial information derived
from the production targets, continue to apply and have not materially changed. As the EFS utilises a portion of Inferred
Mineral Resources, the ASX Listing Rules (Listing Rules) require a cautionary statement to be included in this Presentation. The
EFS is based on a Mineral Resources Estimate in accordance with the JORC 2012 guidelines (ASX: 149% Increase in Measured and
Indicated Resources at Honeymoon date 25 February 2019). The Company advises that the EFS uses a portion of Inferred
Resources; in the first 3 years (less than 1%), in the first 5 years (5%) and over the 11-year life of mine (19%). The Company
confirms that the use of Inferred Resources is not a determining factor to the Honeymoon Project’s economic viability. There
is a low level of geological confidence associated with Inferred Resources and there is no certainty that further exploration or
evaluation work will result in the determination of Indicated Resources or that the production targets reported in this
announcement will be realised.
The mineral resource estimate and exploration target in this Presentation were reported by the Company in accordance with
Listing Rules 5.8 and 5.7 (respectively) on 25 February 2019 and 25 March 2019, respectively. The Company confirms it is not
aware of any new information or data that materially affects the information included in the previous announcement and
that all material assumptions and technical parameters underpinning the estimates in the previous announcement continue
to apply and have not materially changed. In relation to the exploration target, this does not include areas of the existing
mineral resource and the potential quantity and grade reported are conceptual only in nature. Insufficient exploration has
been conducted to estimate a mineral resource and it is uncertain whether future exploration will lead to the estimation of
a mineral resource in the defined areas.
Tonnes (Mt)
Grade (%U3O8)
Contained U3O8
(Mlbs)
Measured
3.1
0.110
7.6
Indicated
18.4
0.063
25.5
Inferred
30.9
0.057
38.5
Total
52.4
0.062
71.6
Boss Energy | A global multi-mine Uranium producer
19
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (Boss Energy or
Company). NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the
recipient’s investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent
assessment and investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should
not rely on any statement or the adequacy and accuracy of any information. This Presentation is in summary form and does not
purpose to be exhaustive. This Presentation should be read in conjunction with Boss Energy’s periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of
the Information. Boss Energy and its directors, employees, agents and consultants shall have no liability (including liability to any
person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or
implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute that
can not be excluded.
FORWARD LOOKING STATEMENTS
All dollar amounts are in Australian dollars unless otherwise indicated. This announcement may contain certain statements and
projections provided by or on behalf of Boss Energy Limited with respect to the anticipated future undertakings. These forwardlooking statements reflect various assumptions by or on behalf of Boss Energy. Accordingly, these statements are subject to
significant business, economic and competitive uncertainties and contingencies associated with the mining industry which may be
beyond the control of Boss Energy which could cause actual results or trends to differ materially, including but not limited to price
and currency fluctuations, geotechnical factors, drilling and production results, development progress, operating results, reserve
estimates, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries, approvals
and cost estimates, environmental risks, ability to meet funding requirements, share price volatility. Accordingly, there can be no
assurance that such statements and projections will be realised. Boss Energy makes no representations as to the accuracy or
completeness of any such statement of projections or that any forecasts will be achieved. Additionally, Boss Energy makes no
representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under
statute or otherwise) is or will be accepted by Boss Energy or by any of their respective officers, directors, shareholders, partners,
employees, or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions or matters
(express or implied) arising out of, contained in or derived from this announcement or any omission from this announcement or of
any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In furnishing
this announcement, Boss Energy undertakes no obligation to provide any additional or updated information whether as a result of
new information, future events or results or otherwise. Nothing in this material should be construed as either an offer to sell or a
solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in isolation as a
basis to invest in Boss Energy.
The information in this document relating to the Enhanced Feasibility Study(“EFS”) is extracted from the announcement entitled
‘Updated Feasibility Study identifies lower costs and increased financial returns’ dated 21 June 2021. Boss Energy confirms that
all the material assumptions underpinning the production targets, and forecast financial information derived from the production
targets, continue to apply and have not materially changed.
The Company advises that the EFS uses a portion of Inferred Resources in the first 3 years (less than 1%), in the first 5 years(5%)
and over the 11-year life of mine(19%). The Company confirms that the use of Inferred Resources is not a determining factor to the
Honeymoon Project’s economic viability. There is a low level of geological confidence associated with Inferred Resources and there
is no certainty that further exploration or evaluation work will result in the determination of Indicated Resources or that the
production targets reported in this announcement will be realised.
REFERENCE TO PREVIOUS ASX ANNOUNCEMENTS
The mineral resource estimate and exploration target in this announcement were reported by the Company in accordance with
listing rules 5.8 and 5.7(respectively)on 25 February 2019 and 25 March 2019, respectively. The Company confirms it is not aware
of any new information or data that materially affects the information included in the previous announcement and that all material
assumptions and technical parameters underpinning the estimates in the previous announcement continue to apply and have not
materially changed.
In relation to the exploration target, this does not include areas of the existing mineral resource and the potential quantity and
grade reported are conceptual only in nature. Insufficient exploration has been conducted to estimate a mineral resource and it is
uncertain whether future exploration will lead to the estimation of a mineral resource in the defined areas.
EFFECT OF ROUNDING
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
PAST PERFORMANCE
Past performance information, including past share price performance of Boss Energy and pro forma financial information, given in
this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss Energy’s
(or anyone else’s) views on Boss Energy’s future financial performance or condition. Past performance of Boss Energy cannot be
relied upon as an indicator of (and provides no guidance as to) the future performance of Boss Energy. Nothing contained in this
Presentation nor any information made available to you is, or shall be relied upon as a promise, representation, warranty or
guarantee, whether as to the past, present or future.
JORC CODE
It is a requirement of the Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the Joint
Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves ("JORC Code"). Investors
outside Australia should note that while ore reserve and mineral resource estimates of the Company in this Presentation comply
with the JORC Code (such JORC Code-compliant ore reserves and mineral resources being "Ore Reserves" and "Mineral
Resources" respectively), they may not comply with the relevant guidelines in other countries and, in particular, do not comply
with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the
"Canadian NI 43-101 Standards"); or (ii) Item 1300 of Regulation S-K, which governs disclosures of mineral reserves in
registration statements filed with the SEC. Information contained in this document describing mineral deposits may not be
comparable to similar information made public by companies subject to the reporting and disclosure requirements of Canadian or
US securities laws.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy.
As the EFS utilises a portion of Inferred Mineral Resources, the ASX Listing Rules require a cautionary statement to be included in
this presentation. The EFS is based on a Mineral Resources
Share your feedback
Discover