BOE - HONEYMOON PROJECT EXPLORATION UPDATE
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
8 December 2015
HONEYMOON PROJECT EXPLORATION UPDATE
HIGHLIGHTS
•
Boss exploration team has conducted extensive review of over 2,500 drill hole data
base
•
Historical drilling suggests extensive exploration upside across the 2600km2 tenement
package
•
Boss plans to use extensive database to define JORC resources additional to the
existing 16Mlb Indicated and Inferred Resource
•
An Exploration Target* of between 32Mt to 78Mt at a grade of between 450ppm and
1400ppm U3O8 has been interpreted for the Project which points towards a potential
target endowment of between 42Mlb and 100Mlb of contained U3O8
* The Exploration Target is conceptual in nature and there has been insufficient exploration to
estimate a Mineral Resource. It is uncertain if further exploration will result in the estimation of a
Mineral Resource.
Boss Resources Limited (ASX: BOE) is pleased to announce that following the completion of the
acquisition of the Honeymoon Uranium Project in South Australia, an extensive review of the historical
exploration database have now been conducted by the Boss geological team, headed by Dr Marat
Abzalov and Neil Inwood (see below for further details on the experience of the team).
Figure 1: Honeymoon Mine Facility. Showing existing site infrastructure, facilities and plant control room.
Boss is now focussed on understanding the 40 years of exploration drilling that has been done on the
2,600km2 tenement package and the current 16Mlb Indicated and Inferred Resource (see Table 2).
Significant work has been undertaken to compile and review the recent and historical exploration
drilling and exploration data resulting in the compilation of multiple databases acquired from Uranium
One into one integrated database.
Suite 23, 513 Hay St, Subiaco WA
PO Box 1311, Subiaco WA 6904
P: +61 (8) 6143 6730
E: admin@bossresources.com.au
ABN 38 118 834 336
Based upon the review of the exploration data (see Appendix 2 for more details) an Exploration Target
of between 32Mt to 78Mt at a grade of between 450ppm and 1400ppm U3O8 has been interpreted for
the Project. This points towards a potential target endowment of between 42Mlb and 100Mlb of
contained U3O8.
The Exploration Target is conceptual in nature and there has been insufficient
exploration to estimate a Mineral Resource. It is uncertain if further exploration will result in the
estimation of a Mineral Resource.
The Exploration Target has been based upon a review of approximately 2,500 historical and recent
drillholes, custom flown geophysical data by previous workers, recent geostatistical investigations and
a review of field work conducted over the last 15 years on the Project.
Table 1: Honeymoon Uranium Project Exploration Target
December 2015
Tonnage Range
Tenement
Project Region
Min
Mt
Grade Range
Min. Grade
U3O8
(ppm)
Max
Mt
Contained Metal
Max Grade
U3O8
(ppm)
Min Kg
U3O8
Max Kg
U3O8
Min Lb
U3O8
Max Lb
U3O8
Eastern Tenements
EL5621
EL5621
EL5621
EL5215
Total
A - Yarramba South
B - Yarramba North
C - Yarramba Mid
D - South Eagle
2
5
400
800
1.4
2.7
3
6
1.5
6
600
1,500
3.2
8.2
7
18
4
3
11
10
4
25
300
400
380
1,200
1,500
1,200
2.7
1.4
8
7.7
2.7
21
5
3
18
17
6
47
Western Tenements
EL5623
EL5623
EL5622
EL5043
Total
Grand Total
E - Gould’s Dam
and Billeroo –
historical grade
estimates^
F - Gould’s Dam
and Billeroo
lateral extents
G - Katchwilleroo
H - Ethiunda
10
20
300
1,200
4.5
9.1
10
20
3
5.5
3
21.5
15
12
6
53
400
400
600
480
1,200
2,000
2,000
1,500
2.7
3.6
1.4
12
5.4
6.8
2.7
24
6
5
3
24
12
15
6
53
42
100
32
78
450
1,400
20
45
Note: Figures have been rounded. ^ These historical grade estimates are non-JORC 2012.
To conduct the review, the Project was divided into eight distinct regions which allowed for assessment
of the exploration potential to be made by region (Table 1). Where drilling information was available
(e.g. Brooks Dam, Billeroo, Yarramba) the Exploration Target was based upon assessment of eU3O8
grade data, thickness intervals, geology and historical grade-tonnage estimates (if available). In other
regions (e.g. Katchwilleroo, Ethiunda), the Exploration Target has relied upon data which is sparse and
potentially inconsistent in some regions and has been based upon conceptual geological models to
2
derive potential endowments. The bulk of the grade assessment used for the exploration data is based
upon historical (pre-Uranium One Australia) and more recent (Uranium One Australia and Southern
Cross Australia) gamma-derived eU3O8 data.
Region B – Yarramba North
Significant mineralisation in
‘Jasons’ project area
Region C – Yarramba Mid Trend
extents of East Kalkaroo
Saffron Deposit
Marmota Energy
5.3MLb U3O8
Region D – South Eagle
Region A – Yarramba South –
including potential extents to
Marmota’s Saffron deposit
Figure 2: Eastern Exploration Target Regions. Shown on a conductivity map with historical drilling and intercepts. Note: Red,
orange and yellow indicate potential paleochannel areas. (Base image source: U1A).
Further work is required to validate and further understand the quality of the historical drilling
information; this includes investigations to quantify localised radioactive disequilibrium effects, quality
of the historical radiometric assaying and hydrogeological characteristics of the encountered
mineralisation. Details of the Exploration Target methodology are shown in Appendix 2.
Work undertaken to test the Exploration Target will include additional data compilation and analysis in
2016, assessment of the existing drillhole database for potential mineral resource assessment,
3
sampling of sonic drill core taken at the Honeymoon Mine, twin drilling of existing holes using sonic
core, rotary mud drilling, and additional geophysical investigations (including seismic and EM) and
modelling. Work will be systematically conducted over the next 3 years to convert the Exploration
Target to JORC resources.
Region F – Trend extents to
Billeroo and Gould’s Dam –
North Billeroo Palaeovalley
Region G – Katchwilleroo
paleovalley – Sparcely drilled,
some 35km of underexplored
extent. Note assay of 1.5%
U3O8 in EAR019
Region E - Historical nonJORC 2012 Billeroo and
Gould’s Dam resources
Region F – Trend extents to
Billeroo and Gould’s Dam –
North Billeroo Palaeovalley
Region H -Potential for close
to source ‘4 Mile’ style
mineralisation. Untested
interpreted paeovalley.
Figure 3: Western Exploration Target Regions. : Blue regions indicate potential paleochannel areas.
(Layered Earth Inversion (LEI) depth slice of merged AEM datasets – 100) (Base image source: U1A).
4
About the Honeymoon Uranium Project
The Honeymoon Uranium Project (Figure 4) is located in South Australia, approximately 80km northwest from the town of Broken Hill near the SA / NSW border. The Project consists of 1 granted Mining
Lease, 5 granted Exploration Licenses, 8 Retention Leases and 2 Miscellaneous Purposes Licenses.
There are 2 main exploration regions: the Eastern Region (ELs 5215 and 5621) which hosts the
Honeymoon, Brooks Dam and East Kalkaroo Resources; and the Western Region (ELs 5043, 5623 and
5622) which hosts the Gould’s Dam and Billeroo deposits which have historical Mineral Resource
estimates.
Figure 4: Honeymoon Uranium Project. The pink shaded regions represent palaeodrainage channels which have potential to host
uranium mineralisation and are the focus of exploration efforts.
Exploration Team
Dr Marat Abzalov
Dr Abzalov graduated with High Distinction from the Kazan University in Russia in 1983 and obtained
his PhD (Geology) in 1987 from St. Petersburg University, Russia, completing a thesis on magmatic
nickel sulphide near the western Russian border with Finland. He has undertaken post-graduate
studies in Applied Mathematics at Murdoch University, Perth, and Geostatistics at the Centre of
Geostatistique, Fontainebleau, France.
5
With over 30 years of post-graduate experience in geology, Dr Abzalov’s work experience includes the
Russian Academy of Sciences, WMC Resources where his last role was Geology Manager – Projects,
and Rio Tinto, where he held the roles of Manager – Geostatistical Consultant and Exploration Manager
– New Opportunities (Eurasia) where he predominantly reviewed ISL uranium projects in Kazakhstan
and the USA.
During his professional career, Dr Abzalov has worked on 12 uranium projects worldwide, notably:
•
Rossing (Namibia) - resource model for a long term mine plan
•
Olympic Dam (Australia) - pre-feasibility study
•
Ranger (Australia) - optimisation resource definition drilling programme
•
Khan (Jordan) – technical director responsible for all aspects from conceptual exploration model
to resource definition drilling
•
Budenovskoe (Kazakhstan) - identified acquisition opportunity for Rio Tinto
•
Sweetwater (USA) - development of a new geochemical exploration approach
Mr Neil Inwood
Neil Inwood is a professional geologist with 20 years’ multi-commodity project and consulting
experience in Australia, Africa, USA, Europe, South America and Central Asia. Neil has a BSc in
Geology from Curtin University, an MSC in Geology from the University of Western Australia and has
studied geostatistics at Edith Cowan University.
Neil was formerly a Principal Consultant with international mining consultancy group, Coffey Mining,
and was Competent Person (ASX) / Qualified Person (TSX) for a variety of international uranium, gold,
nickel, base metal and iron ore projects. Neil has consulted on uranium projects in Australia, Czech
Republic, Columbia, Hungary, Namibia and the USA and was the lead resource consultant on the
world-class Husab uranium deposit in Namibia. Other uranium projects include:
•
Extract Resources - Husab Uranium Project in Namibia
•
Bannerman Resources - Etango Uranium Project in Namibia
•
Deep Yellow - Namibia and Australian Projects
•
Energia - Nyang ISL Project in Western Australia
•
Wildhorse Energy Ltd - Pecs Uranium Project in Hungary
•
U3O8 Corp - Argentine and Brazilian Uranium Projects (Berlin Project)
•
Atom Energy - Utah Projects
HONEYMOON GEOLOGY
The Honeymoon Uranium Project is located in the southern part of the Callabonna sub-basin in South
Australia. Uranium mineralisation within the project area is hosted by the Yarramba and Billeroo
palaeochannels (Figure 4). These consist of Palaeogene age palaeovalleys filled by a sequence of
6
inter-bedded sand, silt and clay). Thickness of the palaeochannels at Honeymoon deposit area
reaches a maximum of 55m thick, and is around a depth from surface of approximately 110 metres.
The uranium mineralisation represents a classic basal channel type sandstone-hosted uranium rollfront model. This model implies the movement of oxidised, uranium-bearing fluid through a largely
reduced aquifer, with mineralisation occurring at the redox front of the fluid. A geochemical zonation
is associated with the roll front, including oxidation of the sands upstream (orange and yellow limonite)
and abundance of pyrite/marcasites and organic matter downstream. Mineralisation is associated
with discreet accumulations of organic matter and pyrite within the palaeovalley sequence.
Distribution of the uranium accumulations within the palaeochannels is controlled by fluid pathways
that have transported the dissolved uranium and the distribution of organic matter which served as
reductants causing precipitation of uranium. Interplay of these two main factors has created a stacked
geometry of the “uranium rolls” commonly distributed as elongate pods along the strike of the
palaeovalley. These features are similar to the uranium mineralisation styles seen in the Shinarump,
Monitor Butte and Moss Back members of the Upper Triassic Chinle formation in the White Canyon
areas of the uranium mining districts of South Eastern Utah USA.
RESOURCES
The July 2015 JORC Mineral Resources for Honeymoon, Brooks Dam and East Kalkaroo are
summarised in Table 2. In total, they contain 5.3Mt of mineralisation at the average grade of 0.14 %
U3O8, which corresponds to 16.6Mlb (7,540 tonnes) of contained U3O8 above a 0.05% U3O8 lower cutoff.
All Mineral Resources are located below the water table at the depth of approximately 100m and hosted
by the paleochannel sedimentary sequence composed by weakly lithified permeable sands
intercalated with clays. Previous hydro-geological test work including pilot production mining study
have confirmed that Mineral Resources are amenable for exploitation using in situ leach technologies.
Table 2 – Honeymoon Project Resource Summary – 13 July 2015
Classification
Cut-off grade (%
U3O8)
Tonnage
(Mt)
Indicated
0.05
1.44
Grade
(% U3O8)
Honeymoon
0.23
Contained U3O8
(Thousand Tonnes) 1
Contained U3O8
(Million Pounds)
2.97
6.54
1Total adjusted to account for historical production of ~335 tonnes U O Note: Figures have been rounded
3 8.
Indicated
0.05
0.78
Brooks Dam (BKD)
0.11
0.87
1.92
Brooks Dam Extension (BDE)
Inferred
0.05
0.51
0.15
0.75
1.66
Inferred
0.05
2.56
East Kalkaroo
0.11
2.94
6.45
Combined Honeymoon, Brooks Dam, Brooks Dam Extension and East Kalkaroo
Indicated and
Inferred
0.05
5.3
0.14
7
7.54
16.57
For further information, contact:
Evan Cranston:
+61 (0) 408 865 838
Grant Davey:
+61 (0) 447 753 163
Competent Persons’ Statements
The information in this document that relates to the Honeymoon Mine Project Exploration Target and associated Exploration
Data is based on information provided by Mr. Neil Inwood, who is a Fellow of the AUSIMM. Consent is granted only for the
purposes of outlining an Exploration Target, no warranty is made on the use of the exploration information and data for other
purposes. Mr Inwood is a consultant geologist and has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity undertaken to qualify as Competent Persons as defined in the 2012
edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr. Inwood has consented to the
inclusion of this information in this document in the form and context in which it appears.
The information in this document that relates to the Honeymoon Mine Project Resources is extracted from the report entitled
“Boss Acquires Honeymoon Uranium Project” in the release of 1 September 2015 and is available on
‘www.bossresources.com.au’ . The Company confirms that it is not aware of any new information or data that materially
affects the information included in the original market announcement and, in the case of estimates of Mineral Resources or
Ore Reserves that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market announcement.’
8
Appendix 1.
JORC Code, 2012 Edition – Honeymoon Project (Eastern and Western Tenements) Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Commentary
Sampling techniques
•
•
•
•
•
•
Drilling techniques
•
•
•
Drill sample recovery
•
•
•
•
•
Logging
•
•
•
•
Sub-sampling techniques
and sample preparation
•
•
•
Quality of assay data and
laboratory tests
•
Uranium levels were determined by use of a variety of tools including: Prompt Fission Neutron (PFN) tools (Honeymoon
and Gould’s Dam regions) and several generations of traditional down hole gamma grade (over both the eastern and
western tenements). Several reports are available on the suitability of PFN tools for assessing down hole Uranium
concentration in ISR deposits.
Downhole PFN reading spacing ranges between 2-10cm and has a depth penetration around hole of between 25 and
40cm. Gamma, Induction and resistivity tool reading spacing was between 1-5cm. Uranium One (U1) and Southern
Cross Resources (SXR) sample intervals are recorded in original .LAS files. Historical gamma data is available as hardcopy.
U1 and SXR tools were maintained by specialised electronic companies in Adelaide. These companies were Geoscience Australia Pty. Ltd. (who at the time were the holders of Patents for Jim Turner PFN technology) and CIRA
Pty.
U1 undertook calibration of instruments on a regular basis using both the in house calibration pits on site at the
Honeymoon mine and the certified calibration facility at Glenside, Conyingham St Adelaide. Historical tools were
variously calibrated, some in Adelaide.
While logging holes, U1 commonly undertook multiple runs both up and down hole were made for comparison and to
ensure consistency of readings.
Early mud drilling and logging is to be treated as historical data, but it is assumed that these programs were conducted
at Industry standards of the day (mid 1970’s-80’s).
The drilling technique employed for U1 was been rotary mud with Kelly drive rigs conducted to industry standard by a
number of specialised water bore drilling companies including Thompson Drilling and Watson Drilling. Historical
drilling ranged from RAB to mud rotary and diamond drilling.
U1 holes vary between 4 and 9 inches in diameter (100mm to 228mm). Occasional hard bands above the mineralised
zone required swapping to rock roller bits to enable penetration.
Sonic holes were also undertaken at Gould’s Dam and Honeymoon. Diamond drilling has also been undertaken at the
Honeymoon/East Kalkaroo project regions.
Diamond drilling often recorded low ample recovery.
Sonic core recorded good sample recovery. U1 sonic drilling core recovery averaged ~95%.
The PFN tool is considered to measure a much larger insitu sample volume compared to collection of physical sample
(e.g. core).
Chip samples were collected by U1 and SXR and used to verify geological data obtained from electric logs and generally
had good sample recovery. Rotary mud drilling inherently allows sample contamination and sample mixing so chemical
assaying of recovered chips is considered to be of little value and was not undertaken.
Triple tube coring program suffered core loss due to the unconsolidated nature of the lithology.
U1 - Chip samples have been collected, photographed and were geologically logged for colour, grain size, texture,
sorting, alteration and oxidation state. This level of detail supports the mineral resource estimate.
Additional geological information was obtained for downhole electric logs (resistivity, conductivity and porosity). These
logs give additional information about lithology, mineral content, variations in porosity and positions of lithological
boundaries
All mineralised intervals used in the resource calculation were geologically logged and the general standard of the
logging is adequate for accurate geological interpretation
All historical holes were logged geologically. Logging systems varied across explorers though.
The U1 PFN tools down hole interval and depth of formation penetration provide sample sizes appropriate to the
deposit style. U1 compared the grade determinations of multiple PFN runs both up and down hole were compared
with gamma readings from the gamma sonde on the PFN tool and with and independent gamma sonde on a different
tool to ensure consistency of grade readings.
Pre-1980’s drilling programs were variably corrected for K-factor, formation factor, hole size etc., and are of varying
levels of quality.
Radiometric data post the 2000’s is generally of industry standard quality.
PFN technology was originally developed as a downhole logging technique by Mobil R&D and Sandia Laboratories in
the United States during the 1970’s specifically to directly measure in-situ uranium grades in sandstone-hosted
uranium deposits. Unlike historical gamma techniques, PFN directly measures uranium’s 235U isotope and therefore
does not suffer the problem of disequilibrium and it is much less affected by variable formation properties such as
salinity and porosity. Grade determination of sub-300ppm eU3O8 material may be close to the machine design limits.
9
Criteria
Commentary
•
A Quality Control check of PFN grades for the HML series holes was undertaken in 2006 by an independent consultant
that compared PFN results with XRF assays of quarter core (Lawie, 2006) and concluded the results are “consistent
with a properly functioning analytical system.”
Geophysical tools used to collect data included:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Location of data points
•
•
•
•
•
•
Data
spacing
distribution
Tool
Serial#
Auslog Gamma (with Guard)
S422
Induction (run with guard)
S423
Prompt Fission Neutron tool
PFN#4
Prompt Fission Neutron tool
PFN#8
Prompt Fission Neutron tool
PFN#27
Prompt Fission Neutron tool
PFN#32
Gamma combined with guard
S058
Auslog 3 arm calliper
A326
U1 - All tools were regularly calibrated, for gamma tools K-factors, dead times were determined from calibration pits.
Moisture / Density Factors and correction for hole size were applied.
For U1 PFN tools, 3 pit slope and offset method was used to calibrate the tools. During logging, correction factors for
sensor depth, bore hole size and formation moisture content were applied. Holes were logged in both down and up
direction to check for consistency of logs, depth corrections were made by comparison of separate gamma tool runs.
U1 - Logging data is transferred from logging truck computers to servers in geological office as .LAS files (an industry
standard log file format).
U1 - Geological logs are entered on paper then transcribed on to excel spreadsheet logging was carried out by either
in house U1A loggers or external logging contractors (Borehole Wireline Pty. Ltd. and Independent Logging services)
significant intersections were then verified by site geologists.
At Honeymoon, 42 production wells were sited close to previous HML series exploration holes which provided the
opportunity to view “twinned” holes for verification and cross checking. A series of these were checked to ensure that
grades were of similar magnitude and downhole depth of the grade peaks occurred around the same interval. Lithology
data was checked via interpretation of the electric logs to ensure no gross lithological differences were apparent.
Primary data is recorded directly to computer hard disk in the logging truck and transferred to a server at the end of
the days logging. Each log is reviewed by the logger and a copy of the raw data file and the prepared log were then
handed over to the site geologist. The site geologist will make any depth corrections required and then use the log to
interpret geology.
Copies of raw LAS files, geological logs of chip cuttings and final WellCad Logs are kept on the company computer
server.
The quality of some historical radiometric data (e.g. pre-1980’s) is potentially variable.
The projection adopted for surveying is GDA 94, MGA zone 54 with AHD elevation. All surveys were tied to the existing
registered base stations
For the U1 HML program, Haines Surveys established a 40m grid over the Honeymoon deposit area using a Trimble
4000 Real Time Kinematic (RTK) GPS system, whilst simultaneously collecting gravity readings. Accuracy of the system
is better than 2cm both vertically and horizontally. This grid, preserved by wooden pegs, was used to locate the majority
of the drilling in these programmes, with the rig being positioned to within sub-metre accuracy from the locating peg.
Any off-grid holes were triangulated using measurements from at least three surrounding pegs. While the completed
holes were being logged, each collar was also picked up using a handheld GPS, to ensure the correct grid peg location
was used. Final RLs for all holes were calculated from an Inverse Distance Squared gridded model of the AHD levels
collected during Haines’ Survey.
For all later series of holes, positions are set out using a Garmin handheld GPS, after drilling, hole locations are picked
up with a Trimble differential GPS system that is coupled to the Omnistar augmentation system to improve accuracy.
Topographic control was improved by Aerometrx Pty. Ltd flying 10cm pixel aerial photography which was rectified
using registered survey points installed at site before plant construction began.
Historic hole were located on local grids, the origins of these grids have been established and the collar positions
converted.
For all later series of holes, positions are set out using a Garmin handheld GPS, after drilling, hole locations were picked
up with a Trimble differential GPS system that is coupled to the Omnistar augmentation system to improve accuracy.
and
•
•
At Honeymoon, the average drill hole data spacing (including production drilling) is sub 30m.
More reginal drill spacing in the Katchiwilleroo region is broad and ranges from 1km to 6km. Other resource region
drill spacing ranges from 30m (Goulds Dam) to 50m to 200m spacing (Billeroo).
Orientation of data in
relation to geological
structure
•
Almost all drilling was by vertical holes into the predominately flat lying mineralisation and followed along geological
strike minimizing any chance of sample bias. Drill spacing ranges from spacing adequate for resource definition (sub
50m) e.g. at the Honeymoon, East Kalkaroo, Brooks Dam, Billeroo and Gould’s Dam Projects) to 100s of metres to
several kilometres (e.g. Areas B, F, G and H). Further details are given in Appendix 2.
Sample security
•
NA
10
Criteria
Commentary
Audits or reviews
•
•
•
A comparison of PFN vs. XRF U assaying was carried out by an independent consultant in 2006 with favourable results.
From 01/12/2010 to 03/12/2010 and alternative downhole tool (USAT) was trialled at Honeymoon by Century
Geophysics Pty. Ltd. and Ground Search Aust. Ltd. It confirmed the accuracy of the PFN readings but offered no
significant advantages over the current technology.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Commentary
Mineral tenement and
land tenure status
•
•
•
•
•
Exploration done by
other parties
•
•
•
Geology
•
•
Drill hole Information
•
•
The project is located on granted ML and El’s approximately 80km North West of Broken Hill and about 400km north
east of the regional capital city of Adelaide near the South Australia/New South Wales border. U1A currently holds a
100% interest in the project.
A discounted state royalty of 1.5% is payable to the South Australian state government, in the future, this will increase
to the normal 5% state royalty
The Mining lease falls within Native title claim SC94/1 held by the Adnyamathanha traditional owners association
(ATLA) and a native title mining lease agreement (NTMLA) signed on 3rd February 2002 exists between U1A and ATLA
that includes the payment of a 1.5% royalty and an annual administration fee.
The mine is currently in a state of care and maintenance but all licenses and permits are understood to be able to be
re-activated after site inspections when production is due to re start.
As of the date of this document, all licenses are in good standing.
Exploration for Tertiary sediment-hosted uranium occurrences commenced in the southern Lake Frome region in 1968.
Philosophy followed closely on United States sediment-hosted uranium exploration experience, particularly that from
the Tertiary basins of Wyoming. In the Curnamona region, assessment identified potentially favourable buried
fluviatile sands adjacent to uranium-enriched source rocks.
The genetic model used assumed leaching from permeable sands, transport down the hydrological gradient and
deposition at a reduction-oxidation interface. Exploration methods employed open-hole rotary drilling and wire-line
geophysical logging as a reconnaissance exploration tool, although surface geophysical methods, primarily resistivity
and gravity surveys, were also used with limited success to locate and map Tertiary Palaeovalleys.
Exploration in the Gould’s Dam broader region includes: Rudd (1968-70) EAR series, Petrocarb (1971 – 535 and 580
series), Pacminex (1971-73) – PMX series, Minad-Teton (1974-80) SE, BW and MTC series, Pacminex (1980) – GD series,
PNC exploration (1985-87) – G series and SXR – (1998-2006) – G and H series and U1A(210-2014) HEX series.
Recent work on the Honeymoon deposit suggests that uranium mineralisation in the Yarramba Palaeochannel occurs
predominantly as “pods” or “lenses”, associated with the interaction between oxidised, uranium rich, meteoric waters
and discreet accumulations of organic matter/pyrite within the palaeovalley sequence. These meteoric waters have
migrated through the channel, probably in response to tectonic events (major uplift episodes since the late Mesozoic
(Skirrow 2009). The formation and characteristics of these mineralised pods is a function of both the fluvial depositional
environment and the formation of reductant. The resulting pH change at the REDOX boundary leads to the deposition
of the uranium at or around these REDOX fronts.
This style of mineralisation is interpreted to be similar to that seen in the Shinarump, Monitor Butte and Moss Back
members of the Upper Triassic Chinle formation in the White Canyon areas of the uranium mining districts of South
Eastern Utah USA.
Drill hole coordinates for the Honeymoon region are shown in the reported dated 1 September 2015 titled ‘Boss
Acquires Honeymoon Uranium Project’. Other drill holes coordinates are shown diagrammatically. Exploration results
have previously been reported by SRX and U1A on the ASX and TSX respectively. Example Drill hole coordinates,
intercepts and logs are shown in Appendix 2.
This statement relates to an Exploration Target only, exploration results have been announced by Boss and by Uranium
1 pursuant to its reporting obligations to TSX.
Data aggregation
methods
•
E
Share your feedback
Discover