Becoming a multi-mine Uranium producer
Positioned to benefit from a rising Uranium market
Macquarie Australia Conference
~ May 2024
ASX: BOE | OTCQX: BQSSF
bossenergy.com
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
PAST PERFORMANCE
This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (“Boss Energy” or
“Company”). NOT INVESTMENT ADVICE
Past performance information, including past share price performance of Boss Energy and pro forma financial information, given in
this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss Energy’s
(or anyone else’s) views on Boss Energy’s future financial performance or condition. Past performance of Boss Energy cannot be
relied upon as an indicator of (and provides no guidance as to) the future performance of Boss Energy. Nothing contained in this
Presentation nor any information made available to you is, or shall be relied upon as a promise, representation, warranty or
guarantee, whether as to the past, present or future.
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the
recipient’s investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent
assessment and investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should
not rely on any statement or the adequacy and accuracy of any information. This Presentation is in summary form and does not
purpose to be exhaustive. This Presentation should be read in conjunction with Boss Energy’s periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of
the Information. Boss Energy and its directors, employees, agents and consultants shall have no liability (including liability to any
person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or
implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute that
can not be excluded.
FORWARD LOOKING STATEMENTS
All dollar amounts are in Australian dollars unless otherwise indicated. This Presentation may contain certain statements and
projections provided by or on behalf of Boss Energy Limited with respect to the anticipated future undertakings. These forwardlooking statements reflect various assumptions by or on behalf of Boss Energy. Accordingly, these statements are subject to
significant business, economic and competitive uncertainties and contingencies associated with the mining industry which may be
beyond the control of Boss Energy which could cause actual results or trends to differ materially, including but not limited to price
and currency fluctuations, geotechnical factors, drilling and production results, development progress, operating results, reserve
estimates, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries,
approvals and cost estimates, environmental risks, ability to meet funding requirements, share price volatility. Accordingly, there
can be no assurance that such statements and projections will be realised. Boss Energy makes no representations as to the
accuracy or completeness of any such statement of projections or that any forecasts will be achieved. Additionally, Boss Energy
makes no representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence,
under statute or otherwise) is or will be accepted by Boss Energy or by any of their respective officers, directors, shareholders,
partners, employees, or advisers as to or in relation to the accuracy or completeness of the information, statements, opinions or
matters (express or implied) arising out of, contained in or derived from this Presentation or any omission from this Presentation
or of any other written or oral information or opinions provided now or in the future to any interested party or its advisers. In
furnishing this Presentation, Boss Energy undertakes no obligation to provide any additional or updated information whether as a
result of new information, future events or results or otherwise. Nothing in this Presentation should be construed as either an offer
to sell or a solicitation of an offer to buy or sell securities. It does not include all available information and should not be used in
isolation as a basis to invest in Boss Energy.
EFFECT OF ROUNDING
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
Boss Energy | Australia’s Newest Clean Energy Producer
JORC CODE
It is a requirement of the Listing Rules that the reporting of ore reserves and mineral resources in Australia comply with the Joint
Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves ("JORC Code"). Investors
outside Australia should note that while ore reserve and mineral resource estimates of the Company in this Presentation comply
with the JORC Code (such JORC Code-compliant ore reserves and mineral resources being "Ore Reserves" and "Mineral
Resources" respectively), they may not comply with the relevant guidelines in other countries and, in particular, do not comply
with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators (the
"Canadian NI 43-101 Standards"); or (ii) Item 1300 of Regulation S-K, which governs disclosures of mineral reserves in
registration statements filed with the SEC. Information contained in this document describing mineral deposits may not be
comparable to similar information made public by companies subject to the reporting and disclosure requirements of Canadian or
US securities laws.
INVESTMENT RISK
As noted above, an investment in shares in Boss Energy (including New Shares) is subject to investment and other known and
unknown risks, some of which are beyond the control of Boss Energy. Boss Energy does not guarantee any particular rate of
return or the performance of Boss Energy, nor does it guarantee the repayment of capital from Boss Energy or any particular tax
treatment. Prospective investors should have regard to the risks outlined in this Presentation, including the “Key Risks” section of
this Presentation, when making their investment decision and should make their own enquires and investigations regarding all
information in this Presentation, including but not limited to the assumptions, uncertainties and contingencies which may affect
future operations of Boss Energy and the impact that different future outcomes may have on Boss Energy. These risks, together
with other general risks applicable to all investments in listed securities not specifically referred to, may affect the value of shares
in Boss Energy (including New Shares) in the future. There is no guarantee that the New Shares will make a return on the capital
invested, that dividends will be paid on the New Shares or that there will be an increase in the value of the New Shares in the
future. Accordingly, an investment in Boss Energy should be considered highly speculative and potential investors should consult
their professional advisers before deciding whether to subscribe for New Shares.
REFERENCE TO PREVIOUS ASX ANNOUNCEMENTS
The mineral resource estimate and exploration target in this announcement were reported by the Company in accordance with
listing rule 5.8 and 5.7 (respectively) on 25 February 2019 and 25 March 2019, respectively. The Company confirms it is not aware
of any new information or data that materially affects the information included in the previous announcement and that all material
assumptions and technical parameters underpinning the estimates in the previous announcement continue to apply and have not
materially changed. In relation to the exploration target, this does not include areas of the existing mineral resource and the
potential quantity and grade reported are conceptual only in nature. Insufficient exploration has been conducted to estimate a
mineral resource and it is uncertain whether future exploration will lead to the estimation of a mineral resource in the defined
areas.
2
Boss has delivered two producing mine and market capital growth of $2B and zero debt
BOSS Strategic Horizons ~ it's all about timing
Vision and Strategy
Foundation and Development
Organic Growth
Mergers & Acquisitions
➢ Become Australia’s Next Uranium
Producer
➢ Skilled, committed, stable wellfield,
processing and exploration geology team
➢ Not all Pounds are Created Equal !!
➢ Discipline First – value accretive M&A
with Alta Mesa
➢ 10 year mine life +
➢ Self performing Project and Construction
team, engineering, procurement,
construction and management.
➢ 2.5Mlb U308 per annum
production
➢ 100Mlb exploration target
➢ Superior Total Shareholder
Return, campaign style, lean
➢ Proven Board & Management
➢ Solid relationships with key
stakeholders, government,
industry, investors, employees,
traditional owners
➢ Successful feasibility studies and Field
Leach Trials
➢ Successful capital raises, over 7 yrs
$420M raised to deliver $2B market cap
growth, two producing mines, zero debt
and $300M in liquid assets
➢ Purchased 1.25Mlb U308 for working
capital, competitive market terms
➢ Honeymoon is now producing U308
Boss Energy | Australia’s Newest Clean Energy Producer
➢ Full pipeline of near-mine and regional
exploration targets
➢ Over 6,000 km2 of prospective tenements
in South Australia
➢ Honeymoon 72Mlbs U308 JORC Resource
~ Mining license, export permit,
producing and first sales in Q3 2024
➢ New mining license preparation underway:
➢ Tier 1 jurisdiction focus, Australia,
North America and Canada
➢ Focus on economic resources which
can produce
➢ ASX 200 and strong institutional
support for Boss Energy strategy
• Goulds Dam 25Mlbs U308
➢ Recognised global producer, a partner
of choice for consolidation
• Jasons 11Mlbs U308
➢ …… Consolidation makes sense
➢ 4 new tenements awarded on Kinloch
~120kms south of Honeymoon
➢ BOSS IS OPEN FOR BUSINESS
➢ 3 new tenements on Eyre Peninsula
➢ Base Metal JV with 1st Quantum and Coda
3
On time and on budget to be a multi-mine ISR producer in Two tier One locations in 1st Half 2024
Global Uranium Platform in Tier 1 Locations
HONEYMOON (100% ownership): 2.45Mlbs U308 p.a.
ALTA MESA (30% ownership): 1.5Mlbs U308 p.a.
South Australia
First drum produced
Texas
First drum expected Texas
Uranium friendly
Produced in April 2024 with
cashflow in Q3 CY24
Uranium friendly
Expected in 1H 2024
IX process proven
Ramp up per schedule
Proven management team
Exceptional drilling results
Key metrics already exceeding
Feasibility Study forecasts
Ramp up to 2.45Mlb/annum
proceeding to plan
Team commenced production
at Rosita ISR restart plant
Significantly exceed the cutoff
grade required for ISR
Alta Mesa Project
Boss Energy | Australia’s Newest Clean Energy Producer
4
Partnership combines experience in development, commissioning and operating mining projects globally
Leading Development and Operating Experience
BOSS ENERGY
Wyatt Buck (Chair)
• GM of McArthur River Uranium Mine
• GM Key Lake Mill, the largest uranium
mining operation in the world.
• Executive GM for all of First Quantum’s
global assets
Duncan Craib (CEO and MD)
• Finance Director for construction and
commissioning of Husab uranium mine
in Namibia.
• CFO for Kalahari Minerals plc and its
43% interest in Extract Resources Ltd.
• MCA Uranium Forum Chair since 2021
Jan Honeyman (NED)
• First Quantum Director of Human
Resources (across all operations)
• KBR Energy, Global Director, Talent
Management
Sashi Davies (Sales and Strategic Advisor)
• Vice Chair World Nuclear Fuel Market
• Previously General Manager of CGN
Global Uranium Ltd
• Previously Head of Marketing for Extract
Resources (Husab mine in Namibia)
Mine development and / or
operating involvement by
respective teams
Boss Energy | Australia’s Newest Clean Energy Producer
Bryn Jones (NED)
• COO Laramide, (New Mexico and
Queensland assets uranium assets)
• Manager technical services Heathgate
Resources
• Worley-SNC Lavelin JV Uranium Lead
for the Olympic Dam Expansion Project
ENCORE ENERGY
Bill Sheriff (Founder and Exec
Chair) –
• Founder and Chair of Energy
Metals Corp
• Responsible for compiling largest
domestic uranium resource base
in US history prior to acquisition
by Uranium One Corp
Dennis Stover (Director & Chief
Technical Officer)
• Leading expert in ISR recovery
focussed on US production
• Independent ISR consultant for
Honeymoon
• Previous CEO enCore
• Executive Vice President,
Americas for Uranium One, Inc
overseeing development of
Uranium One’s assets in the US
Paul Goranson (Director & CEO)
• COO of Energy Fuels - Alta Mesa
and Nichols Ranch
• President, COO and Director
Uranerz - Nichols Ranch ISR
Uranium Project
• President, Cameco Resources
• Vice President of Mesteña
Uranium LLC
• Previous President of the
Uranium Producers of America
Susan Hoxie-Key (Director)
• Chairwoman of the World
Nuclear Fuel Market
• Lead Nuclear Engineer Southern
Nuclear Operating Company
Peter Luthiger (COO)
• Managed the Alta Mesa ISR
project during its period of
production
5
ISR and IX are proven cost-effective uranium mines and ESG friendly relative to traditional mining
In-Situ Recovery Mining and Ion Exchange
In-Situ Recovery (ISR)
Most common method of uranium recovery globally
ISR accounts for ~ 60% global uranium mined, used in
Australia, Kazakhstan, and USA
ESG friendly
Minimal surface disturbance i.e. no blasting or yellow
fleet, no tailings, groundwater quality maintained
Low cost
Circa. two thirds the cost of conventional mining and
average CAPEX less than 15% of conventional mines
High tenors being recorded on Honeymoon
Wellfield tenors are averaging 80 - 100 mg/litre,
compared to study estimates of 47mg/ litre.
Ion Exchange (IX)
Proven technology
IX technology has been proven over past 8 decades and is
utilised by the most established uranium mines globally
including Inkai (Kazatomprom, Cameco), Olympic Dam
(BHP), Langer Heinrich (Paladin) and Husab (CGN)
Proven resin bead performance
Resin performance is the actual loading of uranium from the
PLS onto the ion exchange resin. Demonstrated loading
rates of up to 36g/l are 33% higher than study estimates.
100% stripping of uranium
Stripping of uranium from loaded resin is at 100%,
demonstrating Honeymoon is working properly, resulting in
high grade concentrated eluate of up to 6,000 ppm.
Boss Energy | Australia’s Newest Clean Energy Producer
6
6
Uranium prices are trading at 16-year highs ~ Term US$80/ lb U308 and Spot ~ US$ 93/ lb U308 price
4 Key Uranium Industry Considerations
1
Supply is tight
2
Kazakh supply
limited
3
Rising long term
price
4
New markets for
nuclear
Boss Energy | Australia’s Newest Clean Energy Producer
Supply to 2030 is tight across the cycle, and if Russia cuts supply to the US in response
to US sanctions on Russian supply this would put immediate upward pressure on price
Supply from Kazakhstan will be more limited to the west as Russia and China take
more supply from this area and until sulphuric acid shortages are resolved
Spot pricing reflects discretionary buying while the rising term price is an indicator of
increasing concern about the supply deficit.
Demand for reliable clean energy is creating new markets for nuclear generation as a
source of supply for data centres. Data centre electricity usage, according to new IEA
report, to increase from 460 terawatt-hours (TWh) worldwide in 2022 to 1,000 TWh in
2026. This is approximate to the electricity consumption of Japan.
7
Uranium prices have yet to peak and likely to overshoot in near term due to lack of new production
Spot and Term prices
Boss has entered into two binding sales agreement to sell ~1.8 Mlbs
U308 in total to two major Western utilities in the period to 2032.
Reasons for net increase in primary uranium demand:
➢ Intermediaries and funds/financials buying
➢ Growth in data centre demand for clean base load energy
➢ Reactor life extensions and new reactor plans
➢ Global inventories lowest in past decade
➢ Geopolitical uncertainty;
➢ US ban on Russian nuclear fuel imports passed by Senate
➢ No sign of an end to the Russian invasion of the Ukraine
Boss has a significant advantage over development projects, poised to
capitalize on the immediate and future demand and price overshoot.
UxC U308 Price – 2 Year History (Weekly)
Security of supply, together with the Alta Mesa JV Boss has increased its
near-term sales capacity in a market which continues to strengthen.
To incentivise new production, development projects need to see
sustainable term prices in excess of $85lb U308
Boss Energy | Australia’s Newest Clean Energy Producer
8
The supply deficit is forecast to grow as reserves for existing mines are exhausted and insufficient production planned to replace it
Global uranium supply & demand ~ structural deficit
Base Case Uranium Supply / Demand (UXC)
Uncovered Requirements (UXC)
Source: UXC Uranium Market Outlook – Q1 2024
•
Supply is tight across the cycle with significant
deficits forecast over the long term
•
Material risks to planned production
•
Secondary supplies are almost fully drawn down
Boss Energy | Australia’s Newest Clean Energy Producer
Source: UXC Uranium Market Outlook – Q1 2024
•
Significant (2.1 billion lbs through 2040)
uncovered demand forecast (60% uncovered)
•
Cameco 1st Qtr 2024 address notes pricing is
the highest it has seen at this stage in the
contracting cycle.
9
Uranium prices have never been this high at the start of a contracting cycle
Contracting activity and strategy
Boss has entered into two
binding sales agreement to sell
1.8Mlbs U308 to major
European / US power utilities
over 8yrs from 2024 to 2032
Alta Mesa Central Processing Plant, Texas, USA
Boss has ~$300m in liquid
assets and no debt 1
Boss has 1.25Mlbs of strategic
U3081 inventory and diversity of
supply with no jurisdiction risk
Notes
1. As at 31 March 2024
Boss Energy | Australia’s Newest Clean Energy Producer
Honeymoon Processing Plant and Wellfields, South Australia
Flexibility
Strong relationships
Significant upside
•
•
Entered into two binding
sales agreements
•
First production timed with
strong market fundamentals
•
In constant discussions
with major global utilities
•
Additional contracts will be
layered into a rising market
•
Boss seen as strong
counterparty given
strategic inventory and
diversity of supply with
no jurisdiction risk
•
Boss upside remains
significant as term prices
continue to rise
•
Strategically remain
under-contracted so
early in the contracting
cycle
Strong Balance Sheet has
provided Boss flexibility
to enter into contracts
when it wants to
10
MUTLI-MINES in TWO TIER 1 locations, only 4 currently world-wide with more than 1 producing asset
Asset Portfolio Highlights
Resource tables
Boss’ post transaction asset portfolio
Honeymoon Project
Ownership
%
South Australia
71.6Mlb at 0.062% U3O8
Production commencement
1Q 2024
Initial plant capacity
Mlbpa
AISC
US$/l
b
%
25.6
20Mlb at 0.12% U3O8
1H 2024
Mlbpa
1.5
Notes
1.
Please refer to the cautionary statement and accompanying resource table in Slide 10 for further information.
2.
ISR typically takes 2-5 years to ramp to full plant capacity
Boss Energy | Australia’s Newest Clean Energy Producer
3.1
0.110
7.6
Indicated
18.4
0.063
25.5
Inferred
30.9
0.057
38.5
Total
52.4
0.062
71.6
Within existing
wellfields
Alta Mesa
Mestena Grande
Resource
Category
Tonnes (‘000) Grade (%U3O8)
Contained U3O8
(‘000 lbs)
Measured
54
0.152
164
Indicated
Indicated
1,397
119
0.106
0.120
2,959
287
Total M&I Mineral Resources
1,570
0.109
3,410
Inferred
Inferred
1,263
5,733
0.126
0.119
3,192
13,601
Total Inferred Mineral Resource
6,996
0.120
16,793
8,566
0.11
20,203
South Texas
Production commencement
Initial plant capacity (100%)2
Measured
Alta Mesa
30
Location
Total resource (100%)1
Contained U3O8
(Mlbs)
2.45
Alta Mesa Project
Ownership
Grade (%U3O8)
100
Location
Total resource
Tonnes (Mt)
Honeymoon
Alta Mesa
Mestena Grande
Total
11
Substantial Exploration Target of 58Mlbs to 190Mlbs at grades up to 1,080ppm U3O81
Honeymoon Exploration Potential
• Following strong infill drilling results at Gould’s Dam, Jasons,
Billeroo and Sunset. Boss is now preparing for technical and
economic studies on developing the satellite deposit as an
additional production source, ~36Mlb U308 indicated and inferred
resource
• In addition to the JORC Resource of 71.6Mlb, Honeymoon has a
substantial Exploration Target1 of 58Mlbs to 190Mlbs at grades up
to 1,080ppm U308
• Boss awarded Kinloch Project exploration tenements ~130km south
of Honeymoon. Also recently awarded three highly prospective
exploration tenements on the Eyre Peninsula in South Australia
• Boss now has a total uranium exploration tenement package of over
6,000 km2 in South Australia
• Boss’ exploration strategy has already been highly successful,
increasing the JORC Resource at Honeymoon from 16.57Mlbs to
71.67Mlbs (~4.3x) since project acquisition in December 2015
Notes:
1.
Refer ASX announcement 25 March 2019. The potential quantity and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to
estimate a Mineral Resource and it is uncertain whether future exploration will result in the definition of a Mineral Resource. Please refer to the cautionary statement
and accompanying resource table in Slide 4 for further information.
Boss Energy | Australia’s Newest Clean Energy Producer
12
Keep in touch
+61 (8) 6263 4494
boss@bossenergy.com
ASX: BOE | OTCQX: BQSSF
Share your feedback
Discover