Review Concluded and New Feasibility Study Initiated
18 December 2025
Boss Energy | A global multi-mine Uranium producer 2
Pathway Forward
Review and Pathway Forward
Review Pathway Forward Next Steps
• A material and significant
deviation from the key
assumptions underpinning the
EFS
• The key assumptions impact life
of mine, annual production and
cost
• The EFS has been withdrawn
• The appropriateness of wellfield
design was a key part of the
Honeymoon Review
• Honeymoon review indicated
resource was sensitive to cutoff
• Cost structure needs to reflect
lower-grade mineralisation
• A series of parallel work
programs initiated
• Scoping Study (Q2CY26) and A
New Feasibility Study (Q3CY26)
• Completion of delineation
drilling (Q2CY26) and a Final
JORC Resource (Q3CY26)
Boss Energy | A global multi-mine Uranium producer 3
Honeymoon Review
Review and Pathway Forward
Impacts
• Higher cost structure (C1 and Sustaining Capital)
• Lower pounds under leach per wellfield – impacting
schedule and capital intensity
• Less uranium under leach
• Lower annual production rates
• Shorter Life-of-Mine
• Excluding lower-grade mineralisation from the mine plan
Higher-grade mineralization does
not overlap
Less continuity of higher-grade
mineralisation
Less leachability
Wellfields are smaller
Boss Energy | A global multi-mine Uranium producer 4
Our understanding of the
assumptions underpinning the
current wellfield design was
changing
Pathway Forward
Review and Pathway Forward
1
The Challenge
Our Potential Pathway Forward – A Wide-Spaced Wellfield Design
There is extensive lower-grade
mineralisation that could be
mined
2
Need to fundamentally change
the cost structure to access
lower-grade
3
The Potential Solution
Boss Energy | A global multi-mine Uranium producer 5
Pathway Forward
Review and Pathway Forward
*Generated at 40m x 40m support based on data currently available.
Confirmation with new block model and resource estimate underway.
40%
400+ppm
11%
0-100ppm
49%
100-400ppm
The opportunity to reduce cutoff grade
• From initial modeling ~49% U3O8 of contained metal is
between 100-400ppm
• Lowering the cut-off will improve the amount of metal that
could be brought into the wellfield design
• This, in turn, enables a reduction in the cutoff grade, which
further supports the fractionalisation of costs.
• Increases life-of-mine and annual production rate
Boss Energy | A global multi-mine Uranium producer 6
Pathway Forward
Review and Pathway Forward
Significant metal at lower-grades with good continuity
Good permeability across the deposit which enables maintaining high flowrates for extractor and injector
wells and to control the path for the lixiviant over greater distances
Relatively good hydraulic connectivity, which enables lixiviant to flow between injector and extractor wells
Mineralised horizons that are not distributed too vertically, which prevents excessive dilution of reagents
Relatively low acid consumption given low carbonate content and low acid-consuming clays
Honeymoon Deposit Characteristics – Current Understanding
Boss Energy | A global multi-mine Uranium producer 7
Pathway Forward
Review and Pathway Forward
Boss Energy | A global multi-mine Uranium producer 8
Pathway Forward
Review and Pathway Forward
Wellfield – 150m pattern Wellfield – 50m pattern
• Preliminary work completed on development of a potential alternative wide-spacing wellfield design to optimise
the mining of lower-grade uranium resources via in-situ leach
• Wider-spaced between injection and extraction wells
• First-pass reactive transport simulations – coupled hydrodynamics and chemical interactions
Boss Energy | A global multi-mine Uranium producer 9
Pathway Forward
Review and Pathway Forward
Initial modelling on wellfield spacing
(150)
(100)
(50)
-
50
100
150
200
250
300
350
400
450
500
550
40 50 60 70 80 90 100 110 120 130 140 150
Variance to current design
(%)
Well spacing (m)
Grade Time to final recovery PVE Reagents consumption
Wider spaced wells
- Higher grade
- Longer time (days) to recovery
- Lower PVE
- Lower reagent consumption
Boss Energy | A global multi-mine Uranium producer 10
Pathway Forward
Review and Pathway Forward
Key Metric Pathway Forward Current Design / Approach
Well spacing Increase well spacing (~75-150m) Tighter well spacing (~40m)
Pore volume exchange (PVE) Less PVE 70 PVE
Residence Time Increased residence time (~40-90 days) Low residence time (~5 days)
Total Recovery Same recovery target Same recovery target
Flow rate Lower flow rates Higher flow rates
Recovery time Similar recovery times Similar recovery times
Capital Intensity Lower capital intensity Higher capital intensity
Reagent consumption Lower consumption Higher consumption
PLS Grade Higher grade Lower grade
Wellfield design cutoff grade Lower by reduced capital intensity and
reagent consumption
Higher due to higher capital intensity
and reagent consumption
Pathway forward, potential to deliver a step change with optimisation of wellfield design given current
understanding of the Honeymoon deposit
Similar Better Worse
Boss Energy | A global multi-mine Uranium producer 11
Improving our Resource Understanding
Review and Pathway Forward
• Commenced accelerated delineation
drilling program in mid-September
• Total planned drill of 55,000 metres on
approximate 35m x 35m spacing
• Completed 20,660m to date with initial
focus on Far East Kalkaroo and Central
Kalkaroo
• Gaining an improved understanding of
the Honeymoon resource
• Key input into the New Feasibility Study
Boss Energy | A global multi-mine Uranium producer 12
Pathway Forward
Review and Pathway Forward
New Feasibility Study
• Commenced a series of parallel accelerated work programs to deliver a New
Feasibility Study relating to the potential wide-spaced wellfield design
• Work program in the New Feasibility Study including:
• Hydrogeological testing (tracer/ pumping to test hydraulic connectivity of
the reservoir
• Mineralogical characterisation
• Validation of reservoir simulations
• Reservoir reactive transport simulations
• Trail patterns
• Optimisation of wellhouse design
• Completion of delineation drilling
• Production scheduling and sequencing
• Financial modelling including capital and operating cost estimations
Significant program of work required in the delivery of a New Feasibility Study
Boss Energy | A global multi-mine Uranium producer 13
Pathway Forward
Review and Pathway Forward
• Change in wellfield design being investigated for
Honeymoon would be applicable for Satellite
deposits
• Satellite deposits’ lithologies likely have good
hydraulic connectivity
• Potential to increase recoverable uranium and
reduce capital intensity and C1 costs
• Update to be provided Q1 CY2026
Boss Energy | A global multi-mine Uranium producer 14
FY26 Guidance and Outlook
Review and Pathway Forward
HONEYMOON QUARTERLY PRODUCTION
• On track to deliver FY26 Guidance
• 357klbs U3O8 drummed production as of 10 December
2025 (2Q26TD)
• C1 Cash Costs and All In Sustaining Costs tracking
favourably against FY26 Guidance
• Under the current wellfield design, FY27 production
and cost estimates would approximate FY26 guidance
with the exception of increasing sustaining capital.
AISC would likely be ~15% higher
0
50
100
150
200
250
300
350
400
450
4Q24 1Q25 2Q25 3Q25 4Q25 1Q26 2Q26TD
Lbs (000’s)
Thousands
IX Production U3O8 Drummed
Dec 11-31
production
Boss Energy | A global multi-mine Uranium producer 15
Key Program – Est. Completion Date (CY) Q1 Q2 Q3
Guidance and results
2QFY26 Quarterly Results (28 Jan 2026)
FY27 Guidance
Gould’s Dam and Jason’s Deposit
JORC resource and permitting pathway
Wide-Spaced wellfield design
Update on Pathway Forward and Studies
Scoping study finalised
Completion of New Feasibility Study
Resource model
Accelerated Drilling Program Completion
Updated JORC resource model
Final JORC resource model
Key Catalysts
Review and Pathway Forward
• Continue to provide updates on
programs of work
• Accelerated workstreams
commenced
• Interdependencies between all
key programs including resource
modelling, wide-spaced wellfield
design and Gould’s Dam and
Jason’s Deposit
Boss Energy | A global multi-mine Uranium producer 16
Summary
Review and Pathway Forward
• Formally withdraw the EFS given the material and significant
deviation
• A new pathway forward has been identified that has the potential to
unlock significant value
• New wide-spaced wellfield design approach has potential to reduce
operating and sustaining costs, unlock lower-grade mineralisation,
improve the production profile and extend mine life
• New Feasibility Study has been initiated
• Successful execution of new approach would be applicable to
Satellite Deposits
• Strong financial position to self-fund pathway forward with delivery
of the New Feasibility Study
• Remain on track to deliver FY26 production and costs guidance
17
Boss Energy | A global multi-mine Uranium producer
Disclaimer and Important Notices
IMPORTANT: You must read the following before continuing.
This investor presentation (“Presentation”) has been prepared by Boss Energy Limited (ACN 116 834 336) (Boss Energy or
Company).
NOT INVESTMENT ADVICE
This Presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss Energy pursuant to the
Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and Investment Commission.
This Presentation does not constitute investment advice and has been prepared by Boss Energy without taking into account the
recipient’s investment objectives, financial circumstances or particular needs. Each recipient must make his/her own independent
assessment and investigation of Boss Energy and its business and assets when deciding if an investment is appropriate and should
not rely on any statement or the adequacy and accuracy of any information. This Presentation is in summary form and does not
purpose to be exhaustive. This Presentation should be read in conjunction with Boss Energy’s periodic and continuous disclosure
announcements lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au.
Boss Energy makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of
the Information. Boss Energy and its directors, employees, agents and consultants shall have no liability (including liability to any
person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or
implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statute that
can not be excluded.
FORWARD LOOKING STATEMENTS
EFFECT OF ROUNDING
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the
effect of rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
PAST PERFORMANCE
Past performance information, including past share price performance of Boss Energy and pro forma financial information, given in
this Presentation is given for illustrative purposes only and should not be relied upon as (and is not) an indication of Boss Energy’s
(or anyone else’s) views on Boss Energy’s future financial performance or condition. Past performance of Boss Energy cannot be
relied upon as an indicator of (and provides no guidance as to) the future performance of Boss Energy. Nothing contained in this
Presentation nor any information made available to you is, or shall be relied upon as a promise, representation, warranty or
guarantee, whether as to the past, present or future.
This ASX announcement was approved and authorised by the CEO on behalf of the Board of Boss Energy.
This announcement contains certain forward-looking information and forward-looking statements (collectively “forward-looking statements”),
including: statements regarding the potential benefits or outcomes of the alternative wellfield design; statements regarding the quantity, grade,
and recoverability of uranium; statements regarding the potential to bring satellite deposits (e.g. Gould’s Dam, Jason’s Deposit) into production;
plans and schedules regarding future delineation drilling and other operational milestones; timelines and expectations for completion of feasibility
studies; statements regarding the Company’s future financial capability (including the Company’s abilities to self-fund future work programmes);
and future plans, projections, objectives, estimates and forecasts, and the timings related thereto.
All statements, other than statements of historical fact, that address circumstances, events, activities or developments that could, may or will
occur are forward-looking statements. Forward-looking statements are generally identified by the use of words such as ‘aim’, ‘expect’,
‘anticipate’, ‘intend’, ‘foresee’, ‘likely’, ‘planned’, ‘estimate’, ‘potential’, and other similar words. Similar expressions and phrases, or statements
that certain actions, events or results ‘may’, ‘could’, or ‘should’ (or the negative or grammatical variations of such terms), may also identify
forward-looking statements.
Although the Company believes that the expectations reflected in the forward-looking statements are reasonable, undue reliance should not be
placed on the forward-looking statements since no assurance can be provided that such expectations will prove to be correct.
Actual events or results may differ materially from the events or results expressed or implied in any forward-looking statement and deviations are
both normal and to be expected.
None of the Company nor its respective officers, directors, employees or advisers, or any person named in this announcement or any person
involved in the preparation of this announcement, makes any representation or warranty (either express or implied) as to the accuracy or
likelihood of the fulfilment of any forward-looking statement, or any events or results expressed or implied in any forward-looking statement.
Accordingly, readers are cautioned not to place undue reliance on those statements.
Readers should be aware that forward-looking statements are only opinions and are subject to known and unknown risks, uncertainties,
assumptions and other factors that may impact the Company’s actual results, performance or achievements expressed, projected or implied by
the forward-looking statements. Those risks and uncertainties include factors and risks specific to the Company and / or the industries in which
the Company operates, as well as general economic conditions, political conditions, prevailing exchange rates and interest rates, and conditions in
financial markets.
Forward-looking statements are designed to help readers understand the Company’s views as at that time with respect to future events and
speak only as of the date they are made. Subject to any continuing obligations under applicable law, the Company and its respective officers,
directors, employees and advisers disclaim any obligation or undertaking to distribute after the date of this announcement any updates or
revisions to any forward-looking statements to reflect: (a) any change in expectations in relation to such statements; or (b) any change in
events, conditions or circumstances on which any such statement is based. All forward-looking statements contained in this announcement
are expressly qualified in their entirety by this disclaimer.